Skip to Main Content View Text-Only

Development Services

From Concept to Construction

Phone: 503-823-7300

TTY : 503-823-6868

1900 SW 4th Ave, Portland, OR 97201

Erosion Control

Instream Erosion Control Best Management Practice

Instream BMPs are designed to provide sediment trapping for projects that must take place within the waterway. Projects that cross or otherwise work within the waterway should strive to limit the amount of work that occurs within the waterflow line.

Soil Bioengineering Erosion Control Best Management Practice

Soil Bioengineering BMPs are the ideal measures for use in streambanks and on other upland slopes. Bioengineering uses vegetative materials to provide structural support to banks and flow reduction across banks.

Armoring Erosion Control Best Management Practice

Reinforced Soil Retaining Systems and Gabions

Erosion Prevention Erosion Control Best Management Practice

Erosion control best management practices are required during all ground disturbing activity until permanent site ground covers are in place.

Stormwater Control Erosion Control Best Management Practice

Stormwater control is a vital element to prevent erosion.

Perimeter Control Erosion Control Best Management Practice

Perimeter Control BMPs are the last protection before sediment enters the roadway, storm drains, or adjacent properties. Perimeter control BMPs can be the most visible and most vandalized BMPs used on a site of ground disturbance.

Site Entry Erosion Control Best Management Practice

Site Entry BMPs control accesses to and from a site of ground disturbance can go a long way to controlling mitigation of sediments of the worksite.