Skip to Main Content View Text-Only

Development Services

From Concept to Construction

Phone: 503-823-7300

Email: bds@portlandoregon.gov

1900 SW 4th Ave, Portland, OR 97201

More Contact Info

System Development Charges

System Development Charges (SDCs) are one-time fees charged to help pay for the facilities (such as street and sewer systems) required to meet growth-related needs for the city. Systems Development Charges are paid at the time that a development permit (also known as a building permit) is issued. Building owners, but not tenants, can finance the SDCs through the city. BDS has pulled together information on all the SDCs online. From there, you can also jump to more specific information on each bureau's individual website.

The Transportation SDC is charged on a per student basis, when the proposed educational use is seen as creating more transportation trips than the previous use of the space. Call the Bureau of Transportation at 505 823-7002 to find out whether an SDC would be charged for your project.

The Bureau of Environmental Services (BES) charges a Sanitary SDC for educational projects whenever a development permit includes the addition of one or more new plumbing fixtures. (A new "fixture" is a sink, toilet, dishwasher, floor drain, etc.). Different plumbing fixtures are charged at different rates. Call BES at (503) 823-7761 for more information.

For the Water Bureau, any SDC is based on the size of meter installed. If your new project will include the addition of plumbing fixtures, a larger meter size may be required and an SDC charged. Water lines required for sprinkler systems are exempt from SDC fees. Portland Water Bureau staff is available to answer your SDC questions at (503) 823-7368 or find information online.