Determine what your fees will be

If your project meets all the prescriptive requirements of the OSISC, the fee for the building permit portion will be $263.15. If your project does not follow the prescriptive path and structural calculations are required, the fee for the building permit portion will be $553.74.

The trade permit fees are based on the system size or fixture count, as indicated on the current trade permit applications.

Examples (through June 30, 2015):   

  Building Electrical Total
The fees for a prescriptive, 3.5kW solar system $263.15 $153.44 $416.59
The fees for a non-prescriptive, 3.5 kW solar system $553.74 $153.44 $707.18
The fees for a prescriptive, 5.5kW solar system $263.15 $218.40 $481.55
The fees for a non-prescriptive, 5.5 kW solar system $553.74 $218.40 $772.14 
The fees for a prescriptive, solar water heating system $263.15 $106.40 $369.55
The fees for a non-prescriptive, solar water heating system $553.74 $106.40 $660.14