upstream end of culvert with trash rack

Environmental Services is designing the project and expects to begin construction in 2017.

Project Goals

The project will replace the Boones Ferry Road culvert to allow fish to access Upper Tryon Creek and Arnold Creek upstream of SW Boones Ferry Road. The existing culvert blocks all upstream fish passage and restricts stream flow.

  1. Replace culvert for fish passage and conveyance

  2. Stream restoration to protect habitat, minimize erosion, and improve water quality

  3. Protect exposed sewer pipe on Tryon Creek, upstream of existing culvert.

  4. downstream end of culvertRemove barriers for fish passage and improve stream connectivity for fish population productivity

  5. Design and install channel enhancements for fish habitat such as large wood and rock

  6. Install equipment to monitor fish before and after project construction

  7. Provide pedestrian and wildlife passage through the culvert structure.

  8. Provide trail connectivity to the Tryon Creek State Natural Area North Creek Trailhead. Trail enhancements may include the undercrossing through the culvert, stairs to roadway, sidewalk to trailhead, and an interpretive area.