Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To receive notices about City contract opportunities as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: www.ebidexchange.com/cityofportland

To view current City contract opportunity solicitations, please go to: www.ebidexchange.com/cityofportland

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
SW Pendleton & 45th RDII Pilot E10532 $300,000.00 local 09/16/14 Brenes-Morua, Wrandoll 503.823.4505 Rehabilitate private laterals in order to determine the effectiveness of this method of RDII reduction. 07/09/2013 11:07 08/15/2014 10:08
South Ash Creek Stream Enhancements E09105 $200,000.00 local 11/23/14 Brennecke, Eric 503.823.7651 Stabilize channel and improve conditions, protect sanitary sewer at stream crossings, mitigate impacts of high flows, to improve downstream conditions. 11/19/2012 13:11 10/21/2014 15:10
NW Hermosa Blvd Sewer Rehab E10619 $300,000.00 Local 02/06/15 Chan, Terence 503.823.7087 Replace 563 lf of 8" VSP pipe with 12" PVC pipe. Replace all live laterals (about 10), inlet and inlet pipes. 08/15/2014 11:08 10/21/2014 08:10
CBWTP Digester Mixing Compressors E10118 $504,000.00 local 11/07/14 Gueissaz-Teufel, Muriel 503.823.2498 Replace the existing CBWTP Digester 1 & 2 Mixing Compressors with compressors of the same design as the original. 11/01/2010 15:11 10/21/2014 08:10
FABA Pressure Line System Upgrade E10599 $950,000.00 Local 03/22/15 Hebert, Dan 503.823.2689 Evaluate the Fanno Basin (FABA) pressure line system, and implement required upgrade modificaions to access riser assemblies and pressure monitoring and recording stations. 08/15/2014 11:08 10/21/2014 08:10
Middle Hillsdale RDII Laterals E10617 $2,100,000.00 local 02/24/15 Hjorten, Susan 503.823.7098 Rehabilitated approximately 200 sewer service laterals from the mainline to the house, including the portion of the lateral in the private property. The project is located in SW Portland in the Burlingame Sanitary Sewer Basin. 08/19/2013 11:08 10/21/2014 08:10
SW Terwilliger Blvd & Powers Ct Sanitary Swr Ext E10413 $2,250,000.00 local 01/05/16 Houle, John 503.823.7216 Construct approximately 7,000 linear feet of 8-inch sewer pipe along Terwilliger Blvd. from the Powers Court pump station site to the 30-inch Tryon Interceptor sewer located in Hwy 43. 07/16/2012 13:07 04/14/2014 11:04
Piedmont Sewer Rehab E10332 $3,750,000.00 Local 04/07/15 Houle, John 503.823.7216 Construct approximately 7,000 linear feet of 8-inch sewer pipe along Terwilliger Blvd. from the Powers Court pump station site to the 30-inch Tryon Interceptor sewer located in Hwy 43. 09/15/2014 13:09 10/21/2014 08:10
Tabor-Powell Ph I Sewer Rehab E10475 $10,272,000.00 Local 07/08/15 Hutchinson, Jill 503.823.7236 The Tabor-Powell Phase1 project in SE & NE Portland will replace or rehabilitate approximately 29,000 ft of 8" to 36" combination and sanitary sewer using Clay pipe (VCP). 09/15/2014 13:09 10/21/2014 08:10
Schmeer Pump Station E07448 $800,000.00 local 02/03/15 Jaramillo, Dennis 503.823.2630 Expand the Schmeer Pump Station, 1421 N. Schmeer Road, from its current pumping capacity of approximately 1,800 gpm to 4,400 gpm. 06/25/2014 09:06 10/21/2014 08:10
Airport 3 Pump Station Upgrades E10550 $500,000.00 local 10/15/14 Jaramillo, Dennis 503.823.2630 Replace inadequate wetwell HVAC system and construct improvements to wetwell to alleviate moisture and condensation issues. 07/14/2014 11:07 10/21/2014 08:10
Lower Slough Refugia E10176 $1,500,000.00 local 08/15/14 MacGregor, Fred 503.823.4981 Enhance off-channel refugia for salmonids in the Lower Slough and improve channel function by adding in-water large wood structures. Project will also improve riparian vegetation cover. 04/05/2011 13:04 09/15/2014 13:09
SE Bybee/Glenwood Culvert Replacement E10480 $1,800,000.00 Local 01/15/15 Nelson, Patty 503.823.5271 Replace remaining culverts in Crystal Springs Creek at SE Bybee and SE Glenwood Streets. 08/15/2014 11:08 08/15/2014 11:08
SE Hawthorne-Salmon Recon Green Street E08668 $3,500,000.00 Local 01/12/15 Owen, Bill 503.823.2629 Construct stormwater infiltration facilities, plant street trees and rehab or upsize approx 2,500 linear feet of pipe. Located in SE Portland, the project area is generally bound by Madison, 41st, Clay, and 50th. 08/15/2014 11:08 10/21/2014 08:10
BCC Support E09017 $1,300,000.00 local 03/15/15 Robinson, Kurt 503.823.7133 Construct improvements to replace pipes in poor structural condition; relieve street flooding and basement sewer backups. Located in NW Portland, the project area is generally bound by Yeon, 29th, Nicolai, and St. Helens Road. 11/19/2012 13:11 10/21/2014 08:10
Tryon Sanitary Sewer Protection: 1A TCWTP to Hwy 43 E10251 $2,000,000.00 Local 12/15/14 Robinson, Kurt 503.823.7133 Upgrade the Tryon Creek Sewer from the Tryon Creek wastewater treatment plant approximately 1867 feet upstream into Tryon Creek State Park 08/15/2014 11:08 08/15/2014 11:08
Riverview PS Force Main Repair E08866 $500,000.00 local 12/21/14 Sherwood, Brenda 503.823.2632 Repairs to the Riverview PS force main. 01/11/2012 09:01 08/15/2014 10:08
Crystal Springs Green Streets E10161 $300,000.00 Local 01/16/15 Stevens, Henry 503.823.7867 Construct green street facilities on or near SE 21st from Tacoma to Nehalem in order to treat stormwater that normally drains to Crystal Springs Creek. 08/15/2014 11:08 10/21/2014 08:10
SW Stephenson/Hamilton Drainage E10131 $500,000.00 local 01/08/15 Wilson, Brandon 503.823.7786 Improve storm sewer infrastructure and road shoulders on SW Stephenson between 35th and Boones Ferry. Improvements will include ditch-to-swale features and other stormwater treatment facilities. 01/11/2012 10:01 10/21/2014 08:10
SE Powell Sewer Rehab & Greenstreets E08659 $3,000,000.00 local 01/07/15 Wilson, Brandon 503.823.7786 Reconstruct 5,300 linear feet of pipe and 365 LF of sewer extensions. Also construct 50 vegetated stormwater infiltration facilities. 06/25/2014 09:06 10/21/2014 08:10
Far North Nicolai E08401 $3,645,000.00 Local 03/23/15 Wilson, Brandon 503.823.7786 Construct approximately 8,000 LF of pipe ranging in size from 8" to 30" to relieve basement sewer back ups and address pipe condition and hydraulic capacity problems. Located in NW Portland, the project area is generally bound by Reed, Hwy 30, Thurman, and 28th. 09/15/2014 13:09 09/15/2014 13:09
Skidmore Pump Station E10291 $700,000.00 local 02/07/15 Wood, Kelly 503.823.2657 Remodel pump station including new wet well, submersible pumps, odor treatment, on site generator and electrical controls building. 06/25/2014 09:06 10/21/2014 08:10
City of Portland - OMF - BIBS - Facilities
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Bureau of Development Services Tenant Improvements $65,000 Local 09/15/14 Johnson, Connie 503.823.5562 Tenant Improvements 09/10/2014 15:09 09/10/2014 15:09
The Portland Building Elevator AC Replacement $244,000 Local 08/01/15 Newvine, Ed 503.823.8461 Replace AC units serving the elevator machine room. 09/11/2014 10:09 09/11/2014 10:09
The Portland Building Generator Fuel Tank Replacement $420,000 Local 07/01/15 Newvine, Ed 503.823.8461 Replace underground fuel tank with above ground tank. 09/11/2014 10:09 09/11/2014 10:09
East Precinct - AC Replacement $35,000 07/01/15 Newvine, Ed 503.823.8461 Replace rooftop package AC unit. 09/11/2014 10:09 09/11/2014 10:09
911 AC Replacement and Structural Improvements $670,000 Local 07/01/15 Newvine, Ed 503.823.8461 09/11/2014 10:09 09/11/2014 10:09
North Precinct AC Replacement $300,000 08/30/15 Newvine, Ed 503.823.8461 Replace three AC rooftop units. 09/11/2014 10:09 09/11/2014 10:09
Police ADA Transition Work $TBD Local 04/01/15 Riscica, Michael 503.823.5060 ADA Transition 09/10/2014 15:09 09/10/2014 15:09
Smart Park Resurfacing $TBD Local 11/15/14 Riscica, Michael 503.823.5060 Resurfacing Parking Garage 09/10/2014 15:09 09/10/2014 15:09
Parks Bureau 1st Floor Reservation Center $TBD Local 11/15/14 Riscica, Michael 503.823.5060 09/10/2014 15:09 09/10/2014 15:09
Justice Center Restroom Upgrade $TBD Local 12/01/14 Riscica, Michael 503.823.5060 Upgrade restrooms. Estimated bid date is winter 2014. 02/13/2014 12:02 09/10/2014 15:09
Emergency Power Upgrade for The Portland Building $400,000 Local 01/01/15 Umali, Ron 503.823.8704 Emergency Power Upgrade 09/11/2014 10:09 09/11/2014 10:09
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Marshall Park Playground Replacement P10455 $290,000 08/10/14 Tyler, Lisa 503-823-5116 Replacement of playground at Marshall Park and ADA upgrades 04/29/2014 13:04 04/29/2014 13:04
Charles Jordan Community Center Roof Replacement P20420 $350,000 09/15/14 Verhoef, Gerry 503-823-1607 Replace the Ribbed-Panel Roof system and repair defective underlayment found. 08/27/2013 14:08 04/29/2014 13:04
Ed Benedict Skate Park Guardrail $47,000 06/01/14 Verhoef, Gerry 503-823-1607 Install an ODOT-approved CASS Cable Guardrail system. 08/27/2013 14:08 04/29/2014 13:04
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Tabor Reservoir Adjustments W01524 $4,100,000 Local 02/10/15 Easley, Patrick 503-823-7005 This project includes new 42" and 48" steel pipe and adjustments to piping, structures and other features at Mt. Tabor in order to move storage elsewhere and physically disconnect the open reservoirs from the public water system for compliance with the Environmental Protection Agencies (EPA) Long Term 2 Enhanced Surface Water Treatment Rule (LT2) requirements. 05/16/2013 16:05 10/02/2014 13:10
Groundwater Electrical Supply Improvements W01371 $1,810,000 Local 12/10/14 Easley, Patrick 503-823-7005 This project constructs a new 115kV/4160V transformer and other components to complete a double-ended electrical substation at the Groundwater Pump Station. It will also construct a 5kV main breaker replacement and purchase selected spare components. 10/05/2012 10:10 09/10/2014 18:09
DS - UPRR East Portland Connection Project W01823 $660,000 Local 12/01/14 Mackinnon, Dave (503) 823-7489 Work required to accommodate Union Pacific Railroad’s plans to construct a new railroad track overtop of an existing water main, the work requires installation of D.I. Water Main Installation in NE 2nd Avenue and also includes installation of hydrants and backside plumbing. 08/14/2014 12:08 10/29/2014 17:10
Well Site Improvements W01773 $750,000 Local 10/29/14 Ross, Mike 503-823-7408 This project will require a contractor to rehabilitate the pumps and motors, and conduct minor well improvements at 3 well sites (production wells PW-5, 6 and 13). In addition, modify PW-6 well casing and packing to reduce sand intrusion, install new flow meters and motor protection relays/power monitoring at various well sites, and provide protective recoating of metal components within vaults. 06/13/2014 17:06 10/28/2014 15:10