The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To receive notices about City contract opportunities as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: www.ebidexchange.com/cityofportland

To view current City contract opportunity solicitations, please go to: www.ebidexchange.com/cityofportland

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Albina PS FM E10439 $250,000.00 local 04/28/14 Wood, Kelly 503.823.2657 Rehabilitate the existing force main. 10/16/2012 10:10 04/14/2014 10:04
SW Stephenson/Hamilton Drainage E10131 $600,000.00 local 09/01/14 Wilson, Brandon 503.823.7786 Improve storm sewer infrastructure and road shoulders on SW Stephenson between 35th and Boones Ferry. Improvements will include ditch-to-swale features and other stormwater treatment facilities. 01/11/2012 10:01 03/10/2014 16:03
SE 9th & Sandy Green Street E10358 $448,000.00 local 02/19/14 Stevens, Henry 503.823.7867 Remove approximated 8,500 s.f. of asphalt and construct stormwater treatment facilities. 12/19/2012 13:12 02/19/2014 16:02
Riverview PS Force Main Repair E08866 $500,000.00 local 10/14/14 Sherwood, Brenda 503.823.2632 Repairs to the Riverview PS force main. 01/11/2012 09:01 04/14/2014 11:04
BCC Support E09017 $1,300,000.00 local 07/01/14 Robinson, Kurt 503.823.7133 Construct improvements to replace pipes in poor structural condition; relieve street flooding and basement sewer backups. Located in NW Portland, the project area is generally bound by Yeon, 29th, Nicolai, and St. Helens Road. 11/19/2012 13:11 04/14/2014 10:04
I-5 & SW 26th WQF E08679 $2,130,000.00 local 03/01/14 Richards, Joe 503.823.3517 Construct water quality and detention facilities between I-5 and Barbur Blvd. 11/19/2012 13:11 02/19/2014 16:02
Luther Road Habitat Restoration E06947 $3,495,000.00 local 03/03/14 Richards, Joe 503.823.5315 Stabilize the Johnson Creek channel to limit excessive erosion around the sewer pipe, create fish habitat; create constructed wetlands and enhance existing wetlands for flood storage and water quality benefits; and protect an existing bridge. 07/16/2012 13:07 02/19/2014 16:02
SE Clinton - Caruthers System Improvements E08662 $2,800,000.00 local 04/03/14 Owen, Bill 503.823.2629 Improvements to relieve sewer backups. Located in SE Portland, the project area is bound by Caruthers and Woodward between 20th and 40th. Project includes 25 green street facilities, two blocks of pervious pavement, and approximately 3,000 feet of pipe replacement, all within the right-of-way. 11/01/2010 16:11 03/10/2014 16:03
Lower Slough Refugia E10176 $1,500,000.00 local 07/15/14 MacGregor, Fred 503.823.4981 Enhance off-channel refugia for salmonids in the Lower Slough and improve channel function by adding in-water large wood structures. Project will also improve riparian vegetation cover. 04/05/2011 13:04 10/21/2013 12:10
Fanno/Tryon Outfalls E08677 $145,000 local 03/03/14 MacGregor, Fred 503.823.4981 Rehab/replace 2 degraded stormwater outfalls on Fanno Creek and 1 stormwater outfall on Tryon Creek in SW Portland. Stabilize eroding stream banks and protect downstream spawning gravels. 12/16/2013 15:12 02/28/2014 14:02
Cured in Place Pipe 2014 E10482 $2,700,000.00 local 03/14/14 Hutchinson, Jill 503.823.7236 Rehabilitate approximately 20,000 linear feet of sewer pipe, located in all areas of the city, using the Cured-In-Place-Pipe construction method. 11/19/2013 15:11 02/05/2014 09:02
SW Terwilliger Blvd & Powers Ct Sanitary Swr Ext E10413 $2,250,000.00 local 01/05/16 Houle, John 503.823.7216 Construct approximately 7,000 linear feet of 8-inch sewer pipe along Terwilliger Blvd. from the Powers Court pump station site to the 30-inch Tryon Interceptor sewer located in Hwy 43. 07/16/2012 13:07 04/14/2014 11:04
Middle Hillsdale RDII Pilot Project E10512 $3,000,000.00 local 05/23/14 Hjorten, Susan 503.823.7098 Rehab approximately 9,400 feet of mainline sewer and 170 service laterals including the private portion of the lateral. The project is located in SW Portland in the Burlingame Sanitary Sewer Basin. 08/19/2013 11:08 04/14/2014 11:04
Area 5 - Sanitary Sewer Extension E10205 $1,089,000.00 local 03/01/14 Hickey, Matt 503.823.7928 Construct approximately 20 blocks of sanitary sewer to provide 58 properties with access to sewer service. Work will include open trench excavation, PVC pipe and manholes, and trench restoration. Located in NE Portland, AREA 5 is bounded by Mason, Alberta, Grand, and 17th. 04/05/2011 11:04 02/27/2014 14:02
SW Ventilation & Capacity Improvements E10121 $2,100,000 local 05/30/14 Hebert, Dan 503.823.2689 Construct an air treatment system with sufficient capacity and odor removal capabilities to treat odors likely to be generated from the Southwest Parallel Intercepter and Burlingame Trunk once the upsized system begins to carry flows from the Fanno Basin Pump Station. 06/10/2009 10:06 04/14/2014 11:04
Grant Park Sewer Rehab E10346 $3,570,000.00 local 02/18/14 Harold, Colleen 503.823.5227 Rehabilitate sewers in 20 block of the Grant Park neighborhood. Manholes and inlets will be replaced. Service branches will be replaced from the sewer main to the curb line. 09/23/2013 11:09 02/19/2014 16:02
CBWTP Digester Mixing Compressors E10118 $190,000.00 local 06/25/14 Gueissaz-Teufel, Muriel 503.823.2498 Replace the existing CBWTP Digester 1 & 2 Mixing Compressors with compressors of the same design as the original. 11/01/2010 15:11 03/10/2014 16:03
NW Northrup & 19th Sewer Rehab E10531 $245,000.00 local 03/17/14 Chan, Terence 503.823.7087 Replace 504' of 10" VSP pipe and 22 laterals with RCP, PVC or HDPE pipes. 11/19/2013 15:11 03/10/2014 16:03
Kenton Sewer Rehab E10357 $2,410,000.00 local 04/24/14 Burger, Steven 503.823.5346 Sewer rehabilitation in the Kenton neighborhood in over 15 blocks scattered throughout the neighborhood. Most of the work is within the public ROW. 11/19/2013 15:11 04/14/2014 10:04
Sellwood-Moreland Sewer Rehab E10333 $6,200,000.00 local 05/30/14 Burger, Steven 503.823.5346 Rehabilitate sewers in 20 blocks of the Sellwood and Moreland neighborhoods. Most of the work is within the right-of-way. Manholes and inlets will be replaced. Service branches will be replaced from the sewer main to the curb line. 09/23/2013 11:09 04/14/2014 11:04
South Ash Creek Stream Enhancements E09105 $200,000.00 local 04/29/14 Brennecke, Eric 503.823.7651 Stabilize channel and improve conditions, protect sanitary sewer at stream crossings, mitigate impacts of high flows, to improve downstream conditions. 11/19/2012 13:11 04/14/2014 11:04
SW Pendleton & 45th RDII Pilot E10532 and EZ0005 $400,000.00 local 07/10/14 Brenes-Morua, Wrandoll 503.823.4505 Rehabilitate private laterals in order to determine the effectiveness of this method of RDII reduction. 07/09/2013 11:07 03/10/2014 16:03
City of Portland - OMF - BIBS - Facilities
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Deconstruct Warehouse, 2500 NW Front $400,000 04/14/14 Tessmer, Bob 503.823.8130 Dismantle & recycle warehouse 02/13/2014 12:02 02/13/2014 12:02
Justice Center 11th & 12th Floor Tenant Improvements $TBD 09/01/14 Michael, Riscica, 503.823.5060 Tenant Improvements. Estimated bid date is summer 2014. 02/13/2014 12:02 02/13/2014 12:02
Justice Center Restroom Upgrade $TBD 12/01/14 Michael, Riscica, 503.823.5060 Upgrade restrooms. Estimated bid date is winter 2014. 02/13/2014 12:02 02/13/2014 12:02
The Portland Building CM/GC Unknown 09/01/14 Cresswell, Marina 503.823.6940 Release Date is estimated and is unknown. 01/10/2013 10:01 02/13/2014 12:02
Terminal One Catwalk Repairs $210,000 02/17/14 Bob, Tessmer, 503.823.8130 Catwalk repairs 02/13/2014 12:02 02/13/2014 12:02
Removal of Improvements, 7127 SE 122nd $30,000 02/24/14 Bob, Tessmer, 503.823.8130 Dismantle & remove debris 02/13/2014 12:02 02/13/2014 12:02
Removal of Improvements, 6340 SE 159th Drive $30,000 02/24/14 Bob, Tessmer, 503.823.8130 Dismantle & remove debris 02/13/2014 12:02 02/13/2014 12:02
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
East Portland Community Center Roof Replacement P20419 $400,000 04/01/14 Verhoef, Gerry 503-823-1607 Replace Standing Seam Roof in two areas and repair defective underlayment found. 08/27/2013 14:08 08/27/2013 14:08
Charles Jordan Community Center Roof Replacement P20420 $350,000 04/01/14 Verhoef, Gerry 503-823-1607 Replace the Ribbed-Panel Roof system and repair defective underlayment found. 08/27/2013 14:08 08/27/2013 14:08
Sellwood Park Kitchen Roof Replacement P00341 $110,000 04/27/14 Verhoef, Gerry 503-823-1607 Replace the roof system and perform seismic upgrades to interior columns. 08/27/2013 14:08 08/27/2013 14:08
Ed Benedict Skate Park Guardrail $47,000 11/27/13 Verhoef, Gerry 503-823-1607 Install an ODOT-approved CASS Cable Guardrail system. 08/27/2013 14:08 08/27/2013 14:08
Portland Tennis Center P10433 $250,000 01/01/14 Meamber, Susan 503-823-9709 Concrete work to build an ADA ramp and a footing for the air supported tennis structure, some fence removal, and some electrical. 01/04/2013 12:01 08/20/2013 14:08
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
122nd Ave: Ramona - Holgate, SE T00278 $900,000 - $1,150,000 Federal 03/13/14 Chisek, Kyle 503-823-7041 09/24/2013 12:09 02/10/2014 12:02
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Raymond Tank Supply Improvements W01651 $300,000 Local 09/22/14 Mai, Vu 503-823-3788 The project supports construction improvements to reduce energy demands by replacing pumping system from Gilbert Pump Station to Raymond Tank with a gravity fed connection from the Washington County Supply Line at the intersection of SE Holgate and SE 136th Ave. The work consist of the installing 12" flow meter vault, 8" regulator vault, 12" check valve vault and various appurtenances; and performing all of the required testing. Determined as a project for Energy Trust of Oregon Incentive. 10/05/2012 10:10 04/18/2014 20:04
Alder Creek Fish Passage Diversion Dam W01794 $265,000 Local 05/12/14 Larson, Kevin 503-823-7210 This project will install a fish ladder adjacent to a water diversion dam used by the City of Sandy for water supply. The project is in Alder Creek, a tributary to the Sandy River. 04/03/2014 13:04 04/03/2014 13:04
Fulton Pump Station Improvement W01358 $10,800,000 Local 07/02/14 Evonuk, Dave 503-823-1566 This project will construct a new pump station in Willamette Park to replace the existing Fulton Pump Station. The project also includes 800 feet each of 24-inch and 30-inch main to connect the new station to the piping network. 05/19/2011 09:05 04/18/2014 20:04
Groundwater Electrical Supply Improvements W01371 $1,810,000 Local 06/05/14 Easley, Patrick 503-823-7005 This project constructs a new 115kV/4160V transformer and other components to complete a double-ended electrical substation at the Groundwater Pump Station. It will also construct a 5kV main breaker replacement and purchase selected spare components. 10/05/2012 10:10 04/18/2014 20:04
Tabor Reservoir Adjustments W01524 $2,900,000 Local 10/01/14 Easley, Patrick 503-823-7005 This project includes new 42" and 48" steel pipe and adjustments to piping, structures and other features at Mt. Tabor in order to move storage elsewhere and physically disconnect the open reservoirs from the public water system for compliance with the Environmental Protection Agencies (EPA) Long Term 2 Enhanced Surface Water Treatment Rule (LT2) requirements. 05/16/2013 16:05 08/26/2013 07:08
Road 10 MP 0.6-1.8 W01670 $715,000 Local 05/21/14 Bryan, Scott 503-823-7245 Construction of retaining walls, road widening, culvert improvements and repaving of approximately 1.2 miles of road in the Bull Run Watershed. 09/12/2013 16:09 04/18/2014 20:04
Page Views: 1088000

 


Heartbleed Security Notice

A serious security vulnerability known as "Heartbleed" was recently discovered in OpenSSL, a popular software library commonly used by many websites on the internet to encrypt communication between a user's computer and a web server.

PortlandOregon.gov is NOT affected by this vulnerability as it does not use the OpenSSL software library. Please rest assured we are dedicated to protecting your security on this website.