BOP Project Clearinghouse
PTE | Construction  
 
Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To receive notices about City contract opportunities as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: www.ebidexchange.com/cityofportland

To view current City contract opportunity solicitations, please go to: www.ebidexchange.com/cityofportland

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
NW Hermosa Blvd Sewer Rehab E10619 $300,000.00 Local 01/06/15 Chan, Terence 503.823.7087 Replace 563 lf of 8" VSP pipe with 12" PVC pipe. Replace all live laterals (about 10), inlet and inlet pipes. 08/15/2014 11:08 08/15/2014 11:08
Middle Hillsdale RDII Laterals E10617 $2,100,000.00 local 11/24/14 Hjorten, Susan 503.823.7098 Rehabilitated approximately 200 sewer service laterals from the mainline to the house, including the portion of the lateral in the private property. The project is located in SW Portland in the Burlingame Sanitary Sewer Basin. 08/19/2013 11:08 08/15/2014 10:08
SE 45th & Sherman Sewer Rehab E10606 $300,000.00 Local 11/15/14 Chan, Terence 503.823.7087 Replace 648 lf of 8" CSP pipe with 12" PVC pipes. Replace 13 laterals, 4 inlets and inlet leads. 08/15/2014 10:08 08/15/2014 10:08
FABA Pressure Line System Upgrade E10599 $950,000.00 Local 11/22/14 Hebert, Dan 503.823.2689 Evaluate the Fanno Basin (FABA) pressure line system, and implement required upgrade modificaions to access riser assemblies and pressure monitoring and recording stations. 08/15/2014 11:08 08/15/2014 11:08
UIC Retrofit E10570 $850,000.00 Local 09/05/14 Lastomirsky, Chris 503.823.5489 Retrofit existing UICs with pretreatment system, mostly sedimentation manholes. 08/15/2014 10:08 08/15/2014 10:08
SE 20th & Haig Sewer Rehab E10555 $600,000.00 local 09/15/14 Chan, Terence 503.823.7087 Rehabilitate or replace 642 lf of 8" CSP pipe and 520 lf of 10" CSP pipe. Replace or rehabilitate 35 laterals, replace 9 inlets and inlet leads. 07/14/2014 11:07 07/14/2014 11:07
Airport 3 Pump Station Upgrades E10550 $500,000.00 local 09/29/14 Jaramillo, Dennis 503.823.2630 Replace inadequate wetwell HVAC system and construct improvements to wetwell to alleviate moisture and condensation issues. 07/14/2014 11:07 08/15/2014 10:08
SW Pendleton & 45th RDII Pilot E10532 $300,000.00 local 09/16/14 Brenes-Morua, Wrandoll 503.823.4505 Rehabilitate private laterals in order to determine the effectiveness of this method of RDII reduction. 07/09/2013 11:07 08/15/2014 10:08
SE Bybee/Glenwood Culvert Replacement E10480 $1,800,000.00 Local 01/15/15 Nelson, Patty 503.823.5271 Replace remaining culverts in Crystal Springs Creek at SE Bybee and SE Glenwood Streets. 08/15/2014 11:08 08/15/2014 11:08
SW Terwilliger Blvd & Powers Ct Sanitary Swr Ext E10413 $2,250,000.00 local 01/05/16 Houle, John 503.823.7216 Construct approximately 7,000 linear feet of 8-inch sewer pipe along Terwilliger Blvd. from the Powers Court pump station site to the 30-inch Tryon Interceptor sewer located in Hwy 43. 07/16/2012 13:07 04/14/2014 11:04
Skidmore Pump Station E10291 $700,000.00 local 10/22/14 Wood, Kelly 503.823.2657 Remodel pump station including new wet well, submersible pumps, odor treatment, on site generator and electrical controls building. 06/25/2014 09:06 08/15/2014 10:08
Tryon Sanitary Sewer Protection: 1A TCWTP to Hwy 43 E10251 $2,000,000.00 Local 12/15/14 Robinson, Kurt 503.823.7133 Upgrade the Tryon Creek Sewer from the Tryon Creek wastewater treatment plant approximately 1867 feet upstream into Tryon Creek State Park 08/15/2014 11:08 08/15/2014 11:08
Lower Slough Refugia E10176 $1,500,000.00 local 09/20/14 MacGregor, Fred 503.823.4981 Enhance off-channel refugia for salmonids in the Lower Slough and improve channel function by adding in-water large wood structures. Project will also improve riparian vegetation cover. 04/05/2011 13:04 08/15/2014 10:08
Crystal Springs Green Streets E10161 $300,000.00 Local 12/15/14 Stevens, Henry 503.823.7867 Construct green street facilities on or near SE 21st from Tacoma to Nehalem in order to treat stormwater that normally drains to Crystal Springs Creek. 08/15/2014 11:08 08/15/2014 11:08
SW Stephenson/Hamilton Drainage E10131 $500,000.00 local 12/08/14 Wilson, Brandon 503.823.7786 Improve storm sewer infrastructure and road shoulders on SW Stephenson between 35th and Boones Ferry. Improvements will include ditch-to-swale features and other stormwater treatment facilities. 01/11/2012 10:01 08/15/2014 10:08
CBWTP Digester Mixing Compressors E10118 $190,000.00 local 11/06/14 Gueissaz-Teufel, Muriel 503.823.2498 Replace the existing CBWTP Digester 1 & 2 Mixing Compressors with compressors of the same design as the original. 11/01/2010 15:11 08/15/2014 10:08
South Ash Creek Stream Enhancements E09105 $200,000.00 local 11/08/14 Brennecke, Eric 503.823.7651 Stabilize channel and improve conditions, protect sanitary sewer at stream crossings, mitigate impacts of high flows, to improve downstream conditions. 11/19/2012 13:11 08/15/2014 10:08
BCC Support E09017 $1,300,000.00 local 09/20/14 Robinson, Kurt 503.823.7133 Construct improvements to replace pipes in poor structural condition; relieve street flooding and basement sewer backups. Located in NW Portland, the project area is generally bound by Yeon, 29th, Nicolai, and St. Helens Road. 11/19/2012 13:11 08/15/2014 10:08
Riverview PS Force Main Repair E08866 $500,000.00 local 12/21/14 Sherwood, Brenda 503.823.2632 Repairs to the Riverview PS force main. 01/11/2012 09:01 08/15/2014 10:08
SE Hawthorne-Salmon Recon Green Street E08668 $3,500,000.00 Local 01/22/15 Owen, Bill 503.823.2629 Construct stormwater infiltration facilities, plant street trees and rehab or upsize approx 2,500 linear feet of pipe. Located in SE Portland, the project area is generally bound by Madison, 41st, Clay, and 50th. 08/15/2014 11:08 08/15/2014 11:08
SE Powell Sewer Rehab & Greenstreets E08659 $3,000,000.00 local 11/07/14 Wilson, Brandon 503.823.7786 Reconstruct 5,300 linear feet of pipe and 365 LF of sewer extensions. Also construct 50 vegetated stormwater infiltration facilities. 06/25/2014 09:06 08/15/2014 10:08
Schmeer Pump Station E07448 $800,000.00 local 11/24/14 Jaramillo, Dennis 503.823.2630 Expand the Schmeer Pump Station, 1421 N. Schmeer Road, from its current pumping capacity of approximately 1,800 gpm to 4,400 gpm. 06/25/2014 09:06 08/15/2014 10:08
City of Portland - OMF - BIBS - Facilities
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
The Portland Building CM/GC Unknown 09/01/14 Cresswell, Marina 503.823.6940 Release Date is estimated and is unknown. 01/10/2013 10:01 02/13/2014 12:02
Removal of Improvements, 7127 SE 122nd $30,000 02/24/14 Bob, Tessmer, 503.823.8130 Dismantle & remove debris 02/13/2014 12:02 02/13/2014 12:02
Removal of Improvements, 6340 SE 159th Drive $30,000 02/24/14 Bob, Tessmer, 503.823.8130 Dismantle & remove debris 02/13/2014 12:02 02/13/2014 12:02
Deconstruct Warehouse, 2500 NW Front $400,000 04/14/14 Tessmer, Bob 503.823.8130 Dismantle & recycle warehouse 02/13/2014 12:02 02/13/2014 12:02
Justice Center 11th & 12th Floor Tenant Improvements $TBD 09/01/14 Michael, Riscica, 503.823.5060 Tenant Improvements. Estimated bid date is summer 2014. 02/13/2014 12:02 02/13/2014 12:02
Justice Center Restroom Upgrade $TBD 12/01/14 Michael, Riscica, 503.823.5060 Upgrade restrooms. Estimated bid date is winter 2014. 02/13/2014 12:02 02/13/2014 12:02
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Charles Jordan Community Center Roof Replacement P20420 $350,000 09/15/14 Verhoef, Gerry 503-823-1607 Replace the Ribbed-Panel Roof system and repair defective underlayment found. 08/27/2013 14:08 04/29/2014 13:04
Marshall Park Playground Replacement P10455 $290,000 08/10/14 Tyler, Lisa 503-823-5116 Replacement of playground at Marshall Park and ADA upgrades 04/29/2014 13:04 04/29/2014 13:04
Ed Benedict Skate Park Guardrail $47,000 06/01/14 Verhoef, Gerry 503-823-1607 Install an ODOT-approved CASS Cable Guardrail system. 08/27/2013 14:08 04/29/2014 13:04
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
122nd Ave: Ramona - Holgate, SE T00278 $900,000 - $1,150,000 Federal 03/13/14 Chisek, Kyle 503-823-7041 09/24/2013 12:09 02/10/2014 12:02
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
DS - UPRR East Portland Connection Project W01823 $660,000 Local 11/05/14 Mackinnon, Dave (503) 823-7489 Work required to accommodate Union Pacific Railroad’s plans to construct a new railroad track overtop of an existing water main, the work requires installation of D.I. Water Main Installation in NE 2nd Avenue and also includes installation of hydrants and backside plumbing. 08/14/2014 12:08 08/14/2014 12:08
Well Site Improvements W01773 $750,000 Local 10/08/14 Ross, Mike 503-823-7408 This project will require a contractor to rehabilitate the pumps and motors, and conduct minor well improvements at 3 well sites (production wells PW-5, 6 and 13). In addition, modify PW-6 well casing and packing to reduce sand intrusion, install new flow meters and motor protection relays/power monitoring at various well sites, and provide protective recoating of metal components within vaults. 06/13/2014 17:06 06/13/2014 17:06
Groundwater Electrical Supply Improvements W01371 $1,810,000 Local 09/03/14 Easley, Patrick 503-823-7005 This project constructs a new 115kV/4160V transformer and other components to complete a double-ended electrical substation at the Groundwater Pump Station. It will also construct a 5kV main breaker replacement and purchase selected spare components. 10/05/2012 10:10 08/14/2014 10:08
Fulton Pump Station Improvement W01358 $10,800,000 Local 09/10/14 Evonuk, Dave 503-823-1566 This project will construct a new pump station in Willamette Park to replace the existing Fulton Pump Station. The project also includes 800 feet each of 24-inch and 30-inch main to connect the new station to the piping network. 05/19/2011 09:05 08/20/2014 18:08