Phone: 503-823-7700
Fax: 503-823-7800
1900 SW 4th Ave, Suite 7100, Portland, OR 97201
Phone: 503-823-7700
Fax: 503-823-7800
1900 SW 4th Ave, Suite 7100, Portland, OR 97201
Oregon Transportation Commission Packet - Broadway/Weidler Interchange Improvements (11/20/12)
Materials for the OTC meeting on December 19, 2012, focused on the recommended Broadway/Weidler interchange improvements. The packet includes the staff report, findings, facility plan and City Council resolution expressing support for the recommendations.
N/NE Quadrant Plan - Recommended Draft (10/11/12)
Recommended Draft of the N/NE Quadrant Plan, with recommended goals, policies and action items for the Lloyd District and Lower Albina.
PSC Letter to Council on Recommended Draft Plans (10/11/12)
Planning and Sustainability Commission letter to City Council recommending adoption of the N/NE Quadrant and I-5 Broadway/Weidler Plans.
Recommended Draft I-5 Facility Plan (10/11/12)
Draft Facility Plan containing a detailed description and illustrations of the recommended freeway improvements to the Broadway/Weidler Interchange and surrounding area. 10/12 draft.
I-5 Broadway/Weidler Interchange Improvements Report (10/11/12)
Expanded background report with detailed information about the development of the I-5 Facility Plan Recommended Draft.
Staff Memos to Planning and Sustainability Commission (9/24/12)
Staff memos (9/11 and 9/20) with responses to Commission questions and proposed amendments to the Quadrant Plan.
NNE Quadrant SAC Recommendations Report (8/29/12)
Final report with final votes and recommendations of the N/NE Quadrant Stakeholder Advisory Committee.
N/NE Quadrant Plan Summary (8/23/12)
4-page handout summarizing the Recommended Draft of the N/NE Quadrant Plan.
N/NE Quadrant Plan - Proposed Draft (8/22/12)
Proposed Draft of the N/NE Quadrant Plan with proposed goals, policies and action items for the Lloyd District and Lower Albina.
Revised Draft I-5 Facility Plan (7/27/12)
Revised Draft Facility Plan containing a detailed description and illustrations of the recommended freeway improvements to the Broadway/Weidler Interchange and surrounding area. 8/21/12 draft.
Video Animation: N Williams Avenue between Weidler and Broadway (7/25/12)
The following video animation represents the improvements that would be constructed as part of the I-5 Broadway/Weidler Interchange Recommended Concept.
Draft N/NE Quadrant Plan - Revised SAC Draft (7/25/12)
Draft plan for the N/NE Quadrant revised to include feedback from SAC members and the public. 7/24/12 Draft.
Rose Quarter District Plan (6/20/12)
Summary of the extensive planning process and long term vision for the Rose Quarter District, located within the N/NE Quadrant planning area.
Draft N/NE Quadrant Plan - Stakeholder Advisory Committee Review Draft (6/18/12)
Draft Plan for the N/NE Quadrant of the Central City, with background information and draft goals, policies and implementation actions for the Lloyd District and Lower Albina.
Draft I-5 Interchange Report (6/12/12)
Draft report with detailed information about the Broadway/Weidler Interchange improvements. The report includes a process overview, existing conditions and a summary of alternative concepts and the recommended improvements.
Rose Quarter Map and Directions (5/25/12)
Directions to the Rose Quarter and Rose Room for the June 7th, 2012 SAC meeting and public comment session.
Draft I-5 Facility Plan (5/25/12)
Draft Facility Plan containing a detailed description and illustrations of the recommended freeway improvements to the Broadway/Weidler Interchange and surrounding area.
N/NE Quadrant Plan Draft Goals, Policies and Implementation Actions (4/13/12)
Draft goals, policies and implementation actions for the N/NE Quadrant.
Staff report summarizing the staff recommendations for improvements to the I-5 Broadway/Weidler Interchange, as of April 2012. Specifically focuses on the North of Broadway options.
Video Simulation of the Auxiliary Lanes and SB Braided Ramps (3/13/12)
Video describing some of the potential improvements to the I-5 Broadway Weidler Interchange
Recommended Elements of the I-5 Broadway/Weidler Interchange Plan Improvements - Staff Report (3/9/12)
Staff report summarizing the staff recommendations for improvements to the I-5 Broadway/Weidler Interchange, as of March 2012.
February 2012 Open House Boards (2/3/12)
Materials from the N/NE Quadrant open house held on 2/2/12. Content includes the Proposed Quadrant Concept for land use, urban design and local transportation and potential improvements to the I-5 freeway interchange at Broadway/Weidler.
Revised Proposed Quadrant Concept (2/2/12)
Revised draft proposed concept for land use, urban design and local transportation in the N/NE Quadrant. Updated 2/1/12.
N/NE Quadrant Open House (1/13/12)
N/NE Quadrant Plan Street and Development Character Concept (1/9/12)
The N/NE Quadrant street and development character concept presents a draft system of connections and public spaces that unites streetscape design with adjacent land uses and building forms. Updated 2/1/12.
Draft Proposed Concept (95%) (12/8/11)
Revised draft proposed concept for land use, urban design and local transportation in the N/NE Quadrant as presented to the N/NE Stakeholder Advisory Committee on 11/17/11.
Freeway/Local Transportation Interface: Refined Concept Maps (10/14/11)
Maps displaying refined freeway concepts that will be evaluated and discussed at the 10/27/11 SAC meeting.
Draft Proposed Concept (70% Draft) (10/13/11)
Draft proposed concept for land use, urban design and local transportation in the N/NE Quadrant as presented to the N/NE Stakeholder Advisory Committee on 9/29/11.
Concept Alternatives Outreach Summary and Survey Results Report (9/30/11)
Summary of outreach events related to the land use, urban design and local transportation concept alternatives and complete results of the surveys that closed in September, 2011.
Freeway/Local Transportation Interface: Phase 2 Screening Evaluation Methodology (8/11/11)
Summary and detailed information describing the methodology and results of the Phase 2 Screening of the interchange concepts.
Updated with 7.28.11 SAC actions. Draft recommendation for further refinements to freeway and local street improvement concepts. Includes concepts to move forward into Phase 3 and concepts for no further study.
Freeway/Local Transportation Interface Concepts for Further Study - Revised 7/13 (7/7/11)
Alternative concepts for improvements to the I-5 freeway interchange at Broadway/Weidler, as presented at the July 13, 2011 SAC subcommittee meeting.
Land Use, Urban Design and Local Transportation Concept Alternatives Workbook (6/30/11)
Draft workbook that contains quadrant-wide concept alternatives and subarea choices for the N/NE Quadrant.
Project boards displayed at the June, 2011 N/NE Quadrant Project open house (6/30/11)
Project boards displayed at the open house that present information about the land use and transportation concept alternatives.
Freeway/ Local Interface Transportation Charrette Summary (5/26/11)
Draft report including a summary of the outcomes of the charrette and a one page description of the 24 proposed concepts that include elements that are not recommended for futher study at this time.
Land Use, Urban Design and Local Transportation Charrette - Summary of Results (4/14/11)
Summary results of a charrette focusing on land use, urban design and local transportation in the N/NE quadrant held in February, 2011.
Project Scope of Work (3/3/11)
N/NE Quadrant Project scope of work adopted by the Stakeholder Advisory Committee on January 20, 2011.
Preliminary Issues, Opportunities and Constraints (3/3/11)
Summary and full list of issues, opportunities and constraints collected through public events, stakeholder interviews, individual comments and suggested by staff.
Project Goals (2/14/11)
N/NE Quadrant Project goals adopted by the Stakeholder Advisory Committee on January 20, 2011.
Lower Albina Survey Results (2/3/11)
From the October 2010 survey of businesses located within the Lower Albina Subdistrict.
N/NE Quadrant Open House Summary and Comments (12/13/10)
A pdf document with a detailed summary of the comments received at the November 15 N/NE Quadrant Project Open House, including each comment submitted
Draft Transportation Existing Conditions Report (11/24/10)
Transportation existing conditions report that includes data on bicycle and pedestrian facilities and counts, transit facilities and counts, motor vehicle facilities, counts and operations, freight activity and parking facilities within the N/NE Quadrant.
N/NE Quadrant Transportation Infrastructure Atlas (11/24/10)
Atlas with detailed information about the transportation infrastructure system in the N/NE Quadrant Project study area.
Project Boards from the N/NE Quadrant Project Open House (11/24/10)
Information presented at the 11/15 Joint Open House at Memorial Coliseum
2010 North of Broadway/Blanchard Site Development Study (11/22/10)
A N/NE Quadrant background report, published in October, 2010, that provides information about the development opportunities north of NE Broadway near the Portland Public Schools Blanchard site.
N/NE Quadrant Project One Pager (10/11/10)
A one page flyer about the N/NE Quadrant and I-5 Broadway/Weidler Plans
N/NE Quadrant and I-5 Broadway/Weidler Plans Map (10/5/10)
A map of the boundary of the N/NE Quadrant Project, including it's subdistricts (Lower Albina and Lloyd District) and study areas
N/NE Quadrant: Lower Albina Walk Handout (10/4/10)
Map and talking points used for the Lower Albina district community walk on September 29, 2010
N/NE Quadrant: Lloyd Community Walk Handout (9/28/10)
Map and talking points used for the Lloyd District community walk on September 29, 2010.
N/NE Quadrant Project Public Involvement Plan (8/18/10)
The public involvement strategy for the N/NE Quadrant planning process.