This analysis developed alternatives for how natural resource lands could be managed over the long term, including proposals for long term ownership, and strategies to pay for land management activities.
The appendices include background information used to develop the Concept Plan Report
Prepared through a partnership between the Multnomah County Health Department, Upstream Public Health, Oregon Public Health Institute and the Bureau of Planning and Sustainability
This analysis considers the current uses and development along the Portland and Vancouver Harbor and conducted a feasibility analysis of consolidation or expansion of existing properties to provide future large site development opportunities.
Reports on noise, air quality and transportation, which provide technical information for the Health Assessment Report
This analysis developed alternatives for how natural resource lands could be managed over the long term, including proposals for long term ownership, and strategies to pay for land management activities.
This analysis reviewed previous rail and freight studies with an emphasis on revieiwing congestion issues within the rail corridor in North Portland, Vancouver and the bridge, and summarized the recommendations from these reports for improving efficiency.
This report reviewed innovations around the world at other ports, with an analysis of why these strategies may or may not work in Portland.
This analysis considers the public costs and benefits associated with the development parameters laid out in the Council resolution and in the Base Concept Plan
UPDATED: This work reviewed different rail access scenarios that can be accommodated within a 300 acre footprint.
This document summarizes key technical consultant and staff reports produced for the West Hayden Island Project
This report analyzes roadway and intersection conditions with increased vehicle and truck traffic from a potential future Port facility.
First phase
DRAFT: This report identifies federal, state, and local regulatory requirements, as well as guiding goals and policies.
This memo, produced by David Evans and Associates responds to a series of questions from the WHI Advisory Committee about a West Hayden Island Bridge
The purpose of this memorandum is to provide an overview of the costs estimates for development of West Hayden Island
Preliminary Draft
City-developed tool to assess forest mitigation actions and determine how much mitigation is need to fully compensate for development impacts
This report identifies recreational needs and opportunities to meet those needs on West Hayden Island.