Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To view current City contract opportunity solicitations and receive notices as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at:


From   To 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Airport Way 1 Pump Station Upgrades E10529 $560,000.00 Local 03/15/16 Hebert, Dan 503-823-2689 Replace obsolete equipment with current/latest generation BES and industry standard equipment. 11/17/2014 14:11 09/21/2015 12:09
Airport Way 1 Pump Station Upgrades E10529 $700,000.00 Local 04/08/16 Jaramillo, Dennis 503-823-2630 Replace obsolete equipment with current/latest generation BES and industry standard equipment. 11/04/2015 09:11 11/04/2015 09:11
Alder Pump Station Upgrade E10359 $2,800,000.00 Local 03/18/16 Hebert, Dan 503-823-2689 The project is to upgrade the pump station for projected future flows, and to integrate the PS operation into the eastside CSO system operation. 11/04/2015 08:11 11/04/2015 09:11
Cast-In-Place Pipe Sewer Rehab Southeast E10682 $2,070,000.00 Local 03/23/16 Harold, Colleen 503-823-5227 Rehabilitate by CIPP lining yet undetermined linear feet of small diameter severely deteriorated public sewer, some manhole replacement, and some public lateral replacement, in the East Willamette area. 11/04/2015 09:11 11/04/2015 09:11
CBWTP Admin Bldg E10539 $1,300,000.00 Local 03/26/16 Gibson, Scott 503-823-7615 Re-roof existing approximate 8,000 SF roof area, replace existing mechanical system, upgrade building envelope to increase performance and minimize mechanical system load for energy efficiency and operation cost purposes, and remodel interior spaces where required due to other work. 11/04/2015 09:11 11/04/2015 09:11
CBWTP Biogas Utilization E10033 $6,540,000.00 Local 05/06/16 Han, Vu 503-823-2635 Construct an addition to the existing cogeneration facility to beneficially reuse most of the methane gas that is a bi-product of the treatment process. 11/04/2015 09:11 11/04/2015 09:11
CBWTP Digester Improvements E10616 $354,000.00 Local 02/17/16 Gueissaz-Teufel, Muriel 503-823-2498 Improvements to the Digesters at CBWTP. 11/17/2014 14:11 09/21/2015 14:09
CBWTP Stormwater Pump Station E10726 $508,000.00 Local 10/21/15 Gueissaz-Teufel, Muriel 503-823-2498 A new 500 gpm stormwater pump station to direct collected stormwater to the main plant secondary process for treatment. 09/21/2015 14:09 09/21/2015 14:09
CBWTP WWCL Skimmers Replacement Ph1 E10792 $2,530,000.00 Local 04/01/16 Gueissaz-Teufel, Muriel 503-823-2498 This phase I of the project would replace the eight existing scum skimmers, and restore the spray water functionality over the skimmers. 11/04/2015 09:11 11/04/2015 09:11
Fanno Beaverton Hillsdale Hwy E08675 $570,000.00 Local 04/23/16 Huntington, Lisa 503-823-7205 Construct stormwater treatment facilities to control flow and pollutants flowing into Fanno Creek from the 2.6 mile section of Beaverton-Hillsdale Hwy between SW Sunset and 65th Ave. 11/04/2015 09:11 11/04/2015 09:11
Fanno PS Pressure Line System Upgrade E10599 $1,252,000.00 Local 12/01/15 Hebert, Dan 503-823-2689 Upgrade to access riser assemblies and pressure monitoring and recording stations. 09/21/2015 14:09 11/04/2015 08:11
Far North Nicolai E08401 $3,645,000.00 Local 12/22/15 Wilson, Brandon 503.823.7786 Construct approximately 8,000 LF of pipe ranging in size from 8" to 30" to relieve basement sewer back ups and address pipe condition and hydraulic capacity problems. Located in NW Portland, the project area is generally bound by Reed, Hwy 30, Thurman, and 28th. 09/15/2014 13:09 09/21/2015 12:09
Humboldt Sewer Rehabilitation E10564 $2,800,000.00 Local 06/23/16 Harold, Colleen 503-823-5227 The Humboldt Sewer Rehabilitation project will design and construct public sewer pipe replacement (or rehabilitation) for severly deteriorated pipe in Portland's Humbolt neighborhood. 09/21/2015 14:09 11/04/2015 08:11
Middle Hillsdale RDII Laterals E10617 $2,100,000.00 local 01/11/16 Brenes-Morua, Wrandoll 503.823.4504 Rehabilitated approximately 200 sewer service laterals from the mainline to the house, including the portion of the lateral in the private property. The project is located in SW Portland in the Burlingame Sanitary Sewer Basin. 08/19/2013 11:08 11/04/2015 08:11
NW Industrial St E of 28th E10782 $475,000.00 Local 03/21/16 Chan, Terence 503-823-7087 Replace the deteriorating pipe segments to extend the service life for providing gravity sewer service to the public. 11/04/2015 09:11 11/04/2015 09:11
Powell Ph I Sewer Rehab E10475 $10,272,000.00 Local 11/24/15 Hjorten, Susan 503.823.7098 The Tabor-Powell Phase1 project in SE & NE Portland will replace or rehabilitate approximately 29,000 ft of 8" to 36" combination and sanitary sewer using Clay pipe (VCP). 09/15/2014 13:09 11/04/2015 08:11
Safeway Pump Station Remodel E10292 $850,000.00 Local 02/22/16 Hebert, Dan 503-823-2689 Remodel pump station to improve reliability and maintenance. Remodel includes enlarged wet well, submersible pumps, odor treatment, on site generator and electrical controls building 12/11/2014 11:12 09/21/2015 12:09
Schmeer Pump Station E07448 $800,000.00 local 12/08/15 Jaramillo, Dennis 503.823.2630 Expand the Schmeer Pump Station, 1421 N. Schmeer Road, from its current pumping capacity of approximately 1,800 gpm to 4,400 gpm. 06/25/2014 09:06 11/04/2015 08:11
SE Bybee/Glenwood Culvert Replacement E10480 $1,750,000.00 Local 11/15/15 Nelson, Patty 503.823.5271 Replace remaining culverts in Crystal Springs Creek at SE Bybee and SE Glenwood Streets. 08/15/2014 11:08 11/04/2015 09:11
SE Hemlock & Harrison Alley Rehab E10659 $750,000.00 Local 12/04/15 Chan, Terence 503-823-7087 Rehabilitate or replace 570 lf of 8" sewer pipe, replace 8 laterals, 3 manholes, and 2 inlets and inlet leads. 11/04/2015 08:11 11/04/2015 08:11
SE Powell Sewer Rehab & Greenstreets E08659 $3,000,000.00 local 11/17/15 Wilson, Brandon 503.823.7786 Reconstruct 5,300 linear feet of pipe and 365 LF of sewer extensions. Also construct 50 vegetated stormwater infiltration facilities. 06/25/2014 09:06 11/04/2015 08:11
Slabtown Sewer Replacement E10663 $7,035,000.00 Local 03/28/16 Gonzalez-Baird, Ruben 503-823-0547 Increase pipe capacity to address risk of sewer backups to 67 properties in NW Portland in the area between 13th and 21st and Pettygrove and Savier. 11/04/2015 09:11 11/04/2015 09:11
Sunnyside East Recon/Green Street E10370 $2,550,000.00 Local 03/23/16 Gonzalez-Baird, Ruben 503-823-0547 Construct improvements to upsize pipe segments, and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 45th, Taylor, and 37th. 11/04/2015 09:11 11/04/2015 09:11
SW 45th Ave Culvert Replacement E08676 $780,000.00 Local 04/11/16 Brenneke, Eric 503-823-7651 Construct a replacement for the 45th Ave culvert on Fanno Creek to increase capacity and provide fish passage. 11/04/2015 09:11 11/04/2015 09:11
SW Terwilliger Blvd & Powers Ct Sanitary Swr Ext E10413 $2,250,000.00 local 04/23/16 Brenes-Morua, Wrandoll 503.823.4504 Construct approximately 7,000 linear feet of 8-inch sewer pipe along Terwilliger Blvd. from the Powers Court pump station site to the 30-inch Tryon Interceptor sewer located in Hwy 43. 07/16/2012 13:07 11/04/2015 08:11
Tabor Rehab Ph1 E10712 $5,500,000.00 Local 12/22/15 Hjorten, Susan 503-823-7098 Repair or replace approximately 12.000 ft of 6" to 27" combination and sanitary sewer. The project area is bounded by NE 44th to the west, NE 66th to the east, NE Hassalo to the north and NE Stark to the south. 01/15/2015 14:01 11/04/2015 08:11
Tryon Sanitary Sewer Protection: 1A TCWTP to Hwy 43 E10251 $2,000,000.00 Local 03/15/16 Robinson, Kurt 503.823.7133 Upgrade the Tryon Creek Sewer from the Tryon Creek wastewater treatment plant approximately 1867 feet upstream into Tryon Creek State Park 08/15/2014 11:08 09/21/2015 14:09
Tryon Storm Sewer Protection E10251 $1,900,000.00 Local 03/10/16 Brenes-Morua, Wrandoll 503-823-4504 Upgrade the Tryon Creek Sanitary Sewer from the Tryon Creek wastewater treatment plant approximately 1867 feet upstream into Tryon Creek State Park 11/04/2015 08:11 11/04/2015 08:11
Woodlawn-King Alley Sewer Rehab E10698 $2,800,000.00 Local 03/07/16 Robinson, Kurt 503-823-7133 Sewer Rehab in Woodlawn King neighborhood in alleyways behind residences. 11/04/2015 08:11 11/04/2015 08:11
Woodlawn-King Streets Sewer Rehab E10331 $9,856,000.00 Local 04/22/16 Robinson, Kurt 503-823-7133 Rehabilitate 23,000 lf of pipe, perform 140 spot repairs, upsize 5,700 lf of pipe to reduce the risk of basement sewer backup to 139 properties and the risk of street flooding at 32 locations, and install 2,300 lf of new pipe to re-route flow. Located in N/NE, the area is generally bound by Lombard Place, 17th, Going, and Williams. 11/04/2015 09:11 11/04/2015 09:11
City of Portland - OMF - BIBS - Facilities
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Portland Communications Center $2,000,000 Local 04/04/16 Kristen, Wells, 503.823.1181 Roofing, HVAC, Seismic 10/08/2015 11:10 10/08/2015 11:10
Replacement of City Fuel Facilities $6,000,000 Local 04/02/16 TBD Replace fueling stations at up to six sites & develop fuel facility at a new site to be acquired. 10/08/2015 11:10 10/08/2015 11:10
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
April HIll Park Improvement and Restoration Project P10445 $250-$300K Local 12/15/15 Tyler, Lisa 503-823-5116 Improve access to park natural area and protect wetland through improved trail access and construction of boardwalk and bridges through wetland and across Wood Creek. Restoration planting within the wetlands and surrounding area. 02/09/2015 15:02 10/27/2015 09:10
Halprin Sequence CM/GC P00721 Unknown Voluntary LID 03/02/16 Burtzos, Sandra 503-823-5594 Restoration of the four Halprin Parks - Source Fountain, Lovejoy, Pettygrove, Ira Keller. 05/21/2015 14:05 11/23/2015 14:11
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Groundwater Electrical Supply Improvements W01371 $1,810,000 Local 01/15/16 Easley, Patrick 503-823-7005 This project constructs a new 115kV/4160V transformer and other components to complete a double-ended electrical substation at the Groundwater Pump Station. It will also construct a 5kV main breaker replacement and purchase selected spare components. 10/05/2012 10:10 11/09/2015 16:11
NW Saltzman Rd Main Replacement W01796 $150,000 Local 08/01/16 Ward, Dan 503-823-2799 This project will design and construct a replacement for the existing 1570 feet of 2- to 2½-inch galvanized water main in NW Saltzman Road. The project will use 2-inch HDPE pipe for the water main. Three ¾-inch services will be renewed, and two 1-inch services will be transferred. No hydrants. 10/26/2015 15:10 10/26/2015 15:10
SW Commonwealth Ave East of Cross W01867 $215,000 Local 12/22/15 Wilde, Jamie 503-823-9083 This project will replace 634ft of 2-inch galvanized main with 4-inch main and 6-inch main and replace 9 1-inch services and install 2 hydrants. 10/27/2015 12:10 10/27/2015 12:10