Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To view current City contract opportunity solicitations and receive notices as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: procure.portlandoregon.gov/bso/

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Middle Hillsdale RDII Laterals E10617 $2,100,000.00 local 10/15/16 Brenes-Morua, Wrandoll 503.823.4504 Rehabilitated approximately 200 sewer service laterals from the mainline to the house, including the portion of the lateral in the private property. The project is located in SW Portland in the Burlingame Sanitary Sewer Basin. 08/19/2013 11:08 07/20/2016 10:07
CBWTP Digester Improvements E10616 $354,000.00 Local 10/16/16 Gueissaz-Teufel, Muriel 503-823-2498 Improvements to the Digesters at CBWTP. 11/17/2014 14:11 07/20/2016 10:07
Safeway Pump Station Remodel E10292 $850,000.00 Local 09/14/16 Hebert, Dan 503-823-2689 Remodel pump station to improve reliability and maintenance. Remodel includes enlarged wet well, submersible pumps, odor treatment, on site generator and electrical controls building 12/11/2014 11:12 07/20/2016 13:07
Humboldt Sewer Rehabilitation E10564 $2,800,000.00 Local 08/01/16 Harold, Colleen 503-823-5227 The Humboldt Sewer Rehabilitation project will design and construct public sewer pipe replacement (or rehabilitation) for severly deteriorated pipe in Portland's Humbolt neighborhood. 09/21/2015 14:09 07/20/2016 14:07
Woodlawn-King Alley Sewer Rehab E10698 $2,800,000.00 Local 08/07/16 Robinson, Kurt 503-823-7133 Sewer Rehab in Woodlawn King neighborhood in alleyways behind residences. 11/04/2015 08:11 02/25/2016 11:02
Tryon Storm Sewer Protection E10251 $1,900,000.00 Local 01/15/18 Brenes-Morua, Wrandoll 503-823-4504 Upgrade the Tryon Creek Sanitary Sewer from the Tryon Creek wastewater treatment plant approximately 1867 feet upstream into Tryon Creek State Park 11/04/2015 08:11 02/25/2016 12:02
Alder Pump Station Upgrade E10359 $2,800,000.00 Local 09/15/16 Hebert, Dan 503-823-2689 The project is to upgrade the pump station for projected future flows, and to integrate the PS operation into the eastside CSO system operation. 11/04/2015 08:11 07/20/2016 13:07
Sunnyside East Recon/Green Street E10370 $2,550,000.00 Local 10/13/16 Gonzalez-Baird, Ruben 503-823-0547 Construct improvements to upsize pipe segments, and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 45th, Taylor, and 37th. 11/04/2015 09:11 04/04/2016 11:04
Slabtown Sewer Replacement E10663 $5,870,000.00 Local 11/14/16 Gonzalez-Baird, Ruben 503-823-0547 Increase pipe capacity to address risk of sewer backups to 67 properties in NW Portland in the area between 13th and 21st and Pettygrove and Savier. 11/04/2015 09:11 07/20/2016 10:07
CBWTP WWCL Skimmers Replacement Ph1 E10792 $2,530,000.00 Local 10/25/16 Gueissaz-Teufel, Muriel 503-823-2498 This phase I of the project would replace the eight existing scum skimmers, and restore the spray water functionality over the skimmers. 11/04/2015 09:11 02/25/2016 12:02
Airport Way 1 Pump Station Upgrades E10529 $700,000.00 Local 09/04/16 Jaramillo, Dennis 503-823-2630 Replace obsolete equipment with current/latest generation BES and industry standard equipment. 11/04/2015 09:11 02/25/2016 11:02
SW 45th Ave Culvert Replacement E08676 $780,000.00 Local 10/05/16 Brenneke, Eric 503-823-7651 Construct a replacement for the 45th Ave culvert on Fanno Creek to increase capacity and provide fish passage. 11/04/2015 09:11 07/20/2016 13:07
Woodlawn-King Streets Sewer Rehab E10331 $9,856,000.00 Local 02/01/17 Robinson, Kurt 503-823-7133 Rehabilitate 23,000 lf of pipe, perform 140 spot repairs, upsize 5,700 lf of pipe to reduce the risk of basement sewer backup to 139 properties and the risk of street flooding at 32 locations, and install 2,300 lf of new pipe to re-route flow. Located in N/NE, the area is generally bound by Lombard Place, 17th, Going, and Williams. 11/04/2015 09:11 07/20/2016 14:07
CBWTP Biogas Utilization E10033 $6,540,000.00 Local 07/06/17 Han, Vu 503-823-2635 Construct an addition to the existing cogeneration facility to beneficially reuse most of the methane gas that is a bi-product of the treatment process. 11/04/2015 09:11 04/04/2016 11:04
Fanno Beaverton Hillsdale Hwy E08675 $570,000.00 Local 04/23/17 Huntington, Lisa 503-823-7205 Construct stormwater treatment facilities to control flow and pollutants flowing into Fanno Creek from the 2.6 mile section of Beaverton-Hillsdale Hwy between SW Sunset and 65th Ave. 11/04/2015 09:11 01/14/2016 09:01
CSO Pressure Relief E10490 $2,331,000.00 Local 09/13/16 Robinson, Kurt 503-823-7133 This project consists of design and construction of transient relief structures at the two remaining susceptible locations in Willamette CSO System. 12/17/2015 14:12 07/20/2016 10:07
Southeast Interceptor Rehab E10030 $4,200,000.00 Local 10/07/16 Robinson, Kurt 503-823-7133 Rehabilitate two sections of the SE Interceptor: 2,038 linear feet of 72-in by 74-in horseshoe monolithic concrete sewer constructed in 1954, from the intersection of SE Grand and Pine north to NE Davis and west in NE Davis to NE 3rd; and 1,330 lineal feet of 66 x 54 inches located between SE Caruthers and SE 12th. 12/17/2015 14:12 04/04/2016 15:04
Fremont Pump Station Upgrade E10543 $800,000.00 Local 01/11/17 Hebert, Dan 503-823-2689 Remodel pump station to improve reliability and maintenance. Remodel includes upgrading mechanical, electrical, and controls systems. 12/17/2015 14:12 04/04/2016 11:04
Sunnyside North Recon/Green Street E10367 $6,250,000.00 Local 06/21/17 Gonzalez-Baird, Ruben 503-823-0547 Construct improvements to rehabilitate pipe segments in poor condition, upsize pipe segments and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 37th, Taylor, and 20th. 12/17/2015 14:12 01/12/2016 14:01
NW Industrial St east of 28th Ave E10782 $500,000.00 Local 09/01/16 Chan, Terence 503-823-7087 582 LF of 15" and 18" VSP sewer main and one lateral by open trench method. 04/04/2016 12:04 07/20/2016 10:07
City-wide 2016 Sewer Rehab E10562 $7,750,000.00 Local 11/17/16 Sterling, Claudia 503-823-4962 The City-wide Sewer Rehabilitation Project will construct public sewer pipe rehabilitation and/or replacement of deteriorated pipe outside of Phase 2 Rehab project geographical project boundaries. 04/04/2016 12:04 04/04/2016 12:04
Boones Ferry Culvert E08682 $1,925,000.00 Local 12/27/16 Brennecke, Eric 503-823-7651 Retrofit/replace the Boones Ferry Culvert on Tryon Creek to increase capacity and provide fish passage. The project will include channel enhancement work to control the grade of the creek and protect streambanks and will protect an exposed 18-inch sewer line crossing the creek approximately 145 feet upstream of the culvert. 04/04/2016 12:04 04/04/2016 12:04
CBWTP WWCL Skimmers Repl Phase I E10792 $2,748,000.00 Local 10/26/16 Selker, Chris 503-823-2482 The CBWTP has eight wet weather clarifiers (WWCLs) that are used to treat peak storm events. This phase I of the project would replace the eight existing scum skimmers, and restore the spray water functionality over the skimmers. 04/04/2016 12:04 04/04/2016 12:04
SW Terwilliger Blvd & Powers Ct Sanitary Swr Ext E10413 $2,250,000.00 local 08/10/16 Houle, John 503.823.7216 Construct approximately 7,000 linear feet of 8-inch sewer pipe along Terwilliger Blvd. from the Powers Court pump station site to the 30-inch Tryon Interceptor sewer located in Hwy 43. 07/16/2012 13:07 07/20/2016 10:07
City of Portland - OMF - BIBS - Facilities
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
The Portland Building Renovation $DBR= $153,000,000.00 Local 06/27/16 Kristen, Wells, 503.823.1181 Renovation 01/27/2016 10:01 01/27/2016 10:01
City Hall Exterior $3,000,000.00 Local 03/27/17 Randi, Selleck, 503.823.5060 Exterior (cleaning, restoration/repair), Roofing, and HVAC 01/27/2016 10:01 01/27/2016 10:01
1st & Jefferson Garage Lighting Project $32,000.00 Local 03/27/16 Sara, Grady, Danny 503.823.3919 LED installation 01/27/2016 10:01 01/27/2016 10:01
Justice Center $760,000 Local 02/11/17 Sharon, Raymor, 503.823.6982 Restroom Renovations 02/11/2016 15:02 02/11/2016 15:02
Portland Communications Center $4,000,000.00 Local 04/04/16 Sharon, Raymor, 503.823.6982 Roofing, HVAC, Seismic 10/08/2015 11:10 01/27/2016 10:01
Replacement of City Fuel Facilities $6,000,000 Local 06/02/17 Sharon, Raymor, 503.823.6982 Replace fueling stations at up to six sites & develop fuel facility at a new site to be acquired. 10/08/2015 11:10 01/27/2016 10:01
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Sellwood Park Roof Construction Project P30112 $585,000 2014 Parks Replacement Bond 06/01/16 Johnson, Connie 503-823-5571 Construction administration to replace bathhouse roof at Sellwood Park. 01/12/2016 16:01 04/04/2016 16:04
Mt. Tabor Restroom P30108 $270,000 2014 Parks Replacement Bond 10/01/16 Johnson, Connie 503-823-5571 Restore functionality, improve accessibility and safety by reconfiguring the existing interior layout with two new unisex restrooms with more durable fixtures and improved lighting. 04/04/2016 16:04 04/04/2016 16:04
Urban Forestry Facilities Site Work P30075&P30076 $50,000 2014 Parks Replacement Bond 10/01/16 Meamber, Susan 503-823-9709 Site work to add staffing trailers for Urban Forestry 01/28/2016 16:01 04/04/2016 16:04
North Park Blocks Playground Upgrade P30006 $1,100,000 2014 Parks Replacement Bond 11/01/16 Laughlin, Robin 503-823-5588 Renovate the existing playground at the North Park Blocks by removing the existing structure and surfacing, providing new surfacing and play features, and making accessibility improvements to the SW and NE corners of the park block. 04/04/2016 16:04 04/04/2016 16:04
Washington Park Rose Garden ADA P30126 $1,400,000 2014 Parks Replacement Bond 09/15/16 Laughlin, Robin 503-823-5588 Improvement areas include relocating two ADA parking spaces, making improvements to the path of travel between the ADA parking spaces and the garden entry, and along the walkways leading to the amphitheater. 04/04/2016 16:04 04/04/2016 16:04
Glenwood/Bloomington Parks Restroom Updates P30101 & P30105 $541,000 2014 Parks Replacement Bond 08/01/16 Johnson, Connie 503-823-5571 Renovation of the building’s exterior and interior including the regarding of the approach to the restroom. 04/04/2016 16:04 04/04/2016 16:04
Lents Park Playground Upgrade P30004 $1,100,000 2014 Parks Replacement Bond 09/01/16 Datka, Gary 503-823-5574 Remove and replace existing playground equipment, update play opportunities, improve safety surfacing in the play area, and increase circulation between the upper and lower play areas while improving accessibility and universal access within the play area. 04/04/2016 16:04 04/04/2016 16:04
Mt. Scott HVAC P00713 $500,000 General Fund 09/01/16 Verhoef, Gerry 503-823-1607 Replace HVAC system 04/04/2016 16:04 04/04/2016 16:04
Springwater Corridor Sellwood Gap Trail P10231 $860,000 Local/Federal 05/01/16 Lozovoy, George 503-823-5595 Construct 2,250 feet of multi-modal paved trail from SE Umatilla St. to SE 13th Ave 01/28/2016 16:01 04/04/2016 16:04
Willamette Park P00703 $900,000 SDC Funding 09/01/16 Swanson, Ross 503-823-3577 Trails, dog-off-leash area, entry 04/04/2016 16:04 04/04/2016 16:04
Spring Garden P10468 $2,000,000 SDC Funds 10/01/16 Ruybal, Travis 503-823-5487 SW Spring Garden St. - develop playground and sitting area, ADA accessible connection. Improve hillside with native grasses and plantings. 04/04/2016 16:04 04/04/2016 16:04
Halprin Sequence CM/GC P00721 $4,000,000 Voluntary LID 10/01/16 Burtzos, Sandra 503-823-5594 Restoration of the four Halprin Parks - Source Fountain, Lovejoy, Pettygrove, Ira Keller. 05/21/2015 14:05 04/04/2016 15:04
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Burgard @ North Time Oil Road Intersection T00386 $1,000,000 to $1,500,000 Federal 07/06/16 Shepard, Jason (503) 823-3776 Grading, Drainage, Paving, Striping, Signing, Illumination, Signals & Roadside Development 02/16/2016 09:02 06/01/2016 12:06
Marine Drive Path: 112th-185th Ave, NE T00437 $500,000 to $750,000 Federal 11/07/16 Williams, Linda 503-823-7054 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals 04/01/2016 16:04 04/01/2016 16:04
East Portland Active Transportation to Transit T00383 $1,500,000 to $2,000,000 Federal 11/14/16 Williams, Linda 503-823-7054 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals 04/01/2016 16:04 04/06/2016 08:04
Columbia Blvd at MLK Jr. Blvd, NE T00024 $1,500,000 - $2,000,000 Federal 11/07/16 Shepard, Jason 503-823-3776 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 04/04/2016 09:04 04/04/2016 09:04
Foster Rd: SE Powell Blvd-90th Ave Ped/Bike Safety Ph. 2 T00382 $2.5 million - $3.0 million Federal 01/04/17 Haou, Raphael 503-823-7143 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals 05/31/2016 15:05 05/31/2016 15:05
Taylors Ferry Rockslide Abatement, SW T00508 $250,000 - $500,000 Local 01/04/17 Glasgow, Cameron 503-823-9726 Rockslide Abatement 04/04/2016 09:04 05/31/2016 15:05
Bond Ave: Porter - Marquam Bridge, SW T00461 $1,500,000 - $2,000,000 Local 07/25/16 Williams, Linda 503-823-7054 Embankment and Surcharge 03/01/2016 16:03 05/31/2016 14:05
Halsey Streetscape: 103rd-112th, NE T00456 $1,500,000 - $2,000,000 Local 10/03/16 Shepard, Jason 503-823-3776 Grading, Paving, Concrete Flatwork, Signing, Striping, Signals 03/02/2016 08:03 04/01/2016 15:04
2016 Traffic Signal Rebuilds T00514, T00515 $250,000 - $500,000 Local 08/15/16 Elbert, Lisa 503-823-5128 Signal and Electrical work, Concrete Flatwork, Paving 03/02/2016 10:03 06/14/2016 16:06
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
SW Bancroft Terr near Terwilliger Blvd W01841 $250,000.00 Local 10/28/16 Jahangiri, Shahram 503-823-4738 This project will replace 360 ft of 2-inch galvanized main with 6-inch main and replace 280 ft of 2-inch galvanized main with 4-inch main. Install 60 ft of 6-inch main and install 160 ft of 4-inch main. Renew 2 3/4-inch services and relocate 2 3/4-inch services and 1 1-inch service and potentially kill 1 1-inch service. Install 2 hydrants. 03/03/2016 17:03 07/13/2016 17:07
Rockwood PUD Meter Vault Relocation W01489 $280,000 Local 09/01/16 Bryan, Robinson, 503-823-6518 This project will relocate the existing 8-inch wholesale meter, vault, and appurtenances supplying the Rockwood Public Utility District (PUD) at the intersection of SE 182nd and Division Street to a location that is safe for maintaining. The project will require construction during the night to minimize traffic impacts. Two new utility vaults will be installed in the sidewalk to house an 8-inch protectus fire service meter and a pressure reducing valve. A new remote terminal unit cabinet will be upgraded to bring it up to code and move it out of the existing ADA Sidewalk Ramp. 05/28/2015 11:05 07/08/2016 13:07
NW Saltzman Rd Main Replacement W01796 $335,000 Local 08/30/16 Ward, Dan 503-823-2799 This project will design and construct a replacement for the existing 1570 feet of 2- to 2½-inch galvanized water main in NW Saltzman Road. The project will use 2-inch HDPE pipe for the water main. Three ¾-inch services will be renewed, and two 1-inch services will be transferred. No hydrants. 10/26/2015 15:10 06/07/2016 11:06
Cornell Road Services - Macleay Park W01682 $525,000 Local 10/03/16 Chambers, Chris 503-823-4635 This project will bore approximately 7200 feet of 3-inch HDPE main in Cornell Road from the existing 8-inch main east of Skyline Boulevard (Greenleaf 1250 pressure zone) east to the Cornell Road services. This alternative will require up to three 2x2-inch regulators to keep the Cornell Road services supplied at the current HGL of 731 feet. 12/11/2015 13:12 07/07/2016 16:07
Council Crest Tank Roof Replacement W01848 $700,000 Local 03/01/17 Ngai, Stephen 503-823-7968 This project will replace the Council Crest Tank roof and upper wall shell. 12/11/2015 15:12 05/24/2016 15:05
Groundwater Electrical Supply Improvements W01371 $1,810,000 Local 09/14/16 Easley, Patrick 503-823-7005 This project constructs a new 115kV/4160V transformer and other components to complete a double-ended electrical substation at the Groundwater Pump Station. It will also construct a 5kV main breaker replacement and purchase selected spare components. 10/05/2012 10:10 07/06/2016 15:07