Skip to Main Content View Text-Only

Office of Management & Finance

Bureau of Revenue and Financial Services

Phone: 503-823-5288

Fax: 503-823-5384

1120 SW 5th Avenue, Rm 1250, Portland, OR 97204

BOP Project Clearinghouse
PTE | Construction | Technology  
 
Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To view current City contract opportunity solicitations and receive notices as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: procure.portlandoregon.gov/bso/

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
SW 45th Ave Culvert Replacement E08676 $780,000.00 Local 04/11/17 Brenneke, Eric 503-823-7651 Construct a replacement for the 45th Ave culvert on Fanno Creek to increase capacity and provide fish passage. 11/04/2015 09:11 01/19/2016 15:01
Middle Hillsdale RDII Laterals E10617 $2,100,000.00 local 04/26/16 Brenes-Morua, Wrandoll 503.823.4504 Rehabilitated approximately 200 sewer service laterals from the mainline to the house, including the portion of the lateral in the private property. The project is located in SW Portland in the Burlingame Sanitary Sewer Basin. 08/19/2013 11:08 01/19/2016 15:01
CBWTP Digester Improvements E10616 $354,000.00 Local 03/17/16 Gueissaz-Teufel, Muriel 503-823-2498 Improvements to the Digesters at CBWTP. 11/17/2014 14:11 01/19/2016 15:01
Tabor Rehab Ph1 E10712 $5,500,000.00 Local 02/22/16 Hjorten, Susan 503-823-7098 Repair or replace approximately 12.000 ft of 6" to 27" combination and sanitary sewer. The project area is bounded by NE 44th to the west, NE 66th to the east, NE Hassalo to the north and NE Stark to the south. 01/15/2015 14:01 01/19/2016 15:01
Fanno Beaverton Hillsdale Hwy E08675 $570,000.00 Local 04/23/17 Huntington, Lisa 503-823-7205 Construct stormwater treatment facilities to control flow and pollutants flowing into Fanno Creek from the 2.6 mile section of Beaverton-Hillsdale Hwy between SW Sunset and 65th Ave. 11/04/2015 09:11 01/14/2016 09:01
SE Hemlock & Harrison Alley Rehab E10659 $750,000.00 Local 03/29/16 Chan, Terence 503-823-7087 Rehabilitate or replace 570 lf of 8" sewer pipe, replace 8 laterals, 3 manholes, and 2 inlets and inlet leads. 11/04/2015 08:11 01/14/2016 09:01
Southeast Interceptor Rehab E10030 $10,200,000.00 Local 05/21/17 Robinson, Kurt 503-823-7133 Rehabilitate two sections of the SE Interceptor: 2,038 linear feet of 72-in by 74-in horseshoe monolithic concrete sewer constructed in 1954, from the intersection of SE Grand and Pine north to NE Davis and west in NE Davis to NE 3rd; and 1,330 lineal feet of 66 x 54 inches located between SE Caruthers and SE 12th. 12/17/2015 14:12 01/14/2016 09:01
Sunnyside North Recon/Green Street E10367 $6,250,000.00 Local 06/21/17 Gonzalez-Baird, Ruben 503-823-0547 Construct improvements to rehabilitate pipe segments in poor condition, upsize pipe segments and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 37th, Taylor, and 20th. 12/17/2015 14:12 01/12/2016 14:01
Sunnyside East Recon/Green Street E10370 $2,550,000.00 Local 06/22/16 Gonzalez-Baird, Ruben 503-823-0547 Construct improvements to upsize pipe segments, and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 45th, Taylor, and 37th. 11/04/2015 09:11 01/12/2016 14:01
Slabtown Sewer Replacement E10663 $5,870,000.00 Local 03/28/16 Gonzalez-Baird, Ruben 503-823-0547 Increase pipe capacity to address risk of sewer backups to 67 properties in NW Portland in the area between 13th and 21st and Pettygrove and Savier. 11/04/2015 09:11 01/12/2016 10:01
CBWTP Biogas Utilization E10033 $6,540,000.00 Local 07/06/16 Han, Vu 503-823-2635 Construct an addition to the existing cogeneration facility to beneficially reuse most of the methane gas that is a bi-product of the treatment process. 11/04/2015 09:11 01/12/2016 08:01
Fremont Pump Station Upgrade E10543 $800,000.00 Local 06/06/16 Hebert, Dan 503-823-2689 Remodel pump station to improve reliability and maintenance. Remodel includes upgrading mechanical, electrical, and controls systems. 12/17/2015 14:12 12/17/2015 14:12
CSO Pressure Relief E10490 $715,000.00 Local 07/06/16 Robinson, Kurt 503-823-7133 This project consists of design and construction of transient relief structures at the two remaining susceptible locations in Willamette CSO System. 12/17/2015 14:12 12/17/2015 14:12
CBWTP WWCL Skimmers Replacement Ph1 E10792 $2,530,000.00 Local 09/25/16 Gueissaz-Teufel, Muriel 503-823-2498 This phase I of the project would replace the eight existing scum skimmers, and restore the spray water functionality over the skimmers. 11/04/2015 09:11 12/17/2015 14:12
NW Industrial St E of 28th E10782 $475,000.00 Local 04/21/16 Chan, Terence 503-823-7087 Replace the deteriorating pipe segments to extend the service life for providing gravity sewer service to the public. 11/04/2015 09:11 12/17/2015 14:12
Fanno PS Pressure Line System Upgrade E10599 $1,252,000.00 Local 03/14/16 Hebert, Dan 503-823-2689 Upgrade to access riser assemblies and pressure monitoring and recording stations. 09/21/2015 14:09 12/17/2015 14:12
Tryon Storm Sewer Protection E10251 $1,900,000.00 Local 01/07/17 Brenes-Morua, Wrandoll 503-823-4504 Upgrade the Tryon Creek Sanitary Sewer from the Tryon Creek wastewater treatment plant approximately 1867 feet upstream into Tryon Creek State Park 11/04/2015 08:11 12/17/2015 14:12
Safeway Pump Station Remodel E10292 $850,000.00 Local 04/22/16 Hebert, Dan 503-823-2689 Remodel pump station to improve reliability and maintenance. Remodel includes enlarged wet well, submersible pumps, odor treatment, on site generator and electrical controls building 12/11/2014 11:12 12/17/2015 13:12
Schmeer Pump Station Expansion E07448 $1,775,000.00 Local 01/22/16 Hebert, Dan 503-823-2689 Expand the Schmeer Pump Station,1421 N. Schmeer Road, from its current pumping capacity of approximately 1,800 gpm to 4,400 gpm. 12/17/2015 13:12 12/17/2015 13:12
Far North Nicolai E08401 $3,645,000.00 Local 02/05/16 Wilson, Brandon 503.823.7786 Construct approximately 8,000 LF of pipe ranging in size from 8" to 30" to relieve basement sewer back ups and address pipe condition and hydraulic capacity problems. Located in NW Portland, the project area is generally bound by Reed, Hwy 30, Thurman, and 28th. 09/15/2014 13:09 12/17/2015 13:12
Powell Ph I Sewer Rehab E10475 $10,272,000.00 Local 12/22/15 Hjorten, Susan 503.823.7098 The Tabor-Powell Phase1 project in SE & NE Portland will replace or rehabilitate approximately 29,000 ft of 8" to 36" combination and sanitary sewer using Clay pipe (VCP). 09/15/2014 13:09 12/17/2015 13:12
SE Bybee/Glenwood Culvert Replacement E10480 $1,750,000.00 Local 01/15/16 Nelson, Patty 503.823.5271 Replace remaining culverts in Crystal Springs Creek at SE Bybee and SE Glenwood Streets. 08/15/2014 11:08 12/17/2015 13:12
Woodlawn-King Streets Sewer Rehab E10331 $9,856,000.00 Local 04/22/16 Robinson, Kurt 503-823-7133 Rehabilitate 23,000 lf of pipe, perform 140 spot repairs, upsize 5,700 lf of pipe to reduce the risk of basement sewer backup to 139 properties and the risk of street flooding at 32 locations, and install 2,300 lf of new pipe to re-route flow. Located in N/NE, the area is generally bound by Lombard Place, 17th, Going, and Williams. 11/04/2015 09:11 11/04/2015 09:11
Airport Way 1 Pump Station Upgrades E10529 $700,000.00 Local 04/08/16 Jaramillo, Dennis 503-823-2630 Replace obsolete equipment with current/latest generation BES and industry standard equipment. 11/04/2015 09:11 11/04/2015 09:11
Cast-In-Place Pipe Sewer Rehab Southeast E10682 $2,070,000.00 Local 03/23/16 Harold, Colleen 503-823-5227 Rehabilitate by CIPP lining yet undetermined linear feet of small diameter severely deteriorated public sewer, some manhole replacement, and some public lateral replacement, in the East Willamette area. 11/04/2015 09:11 11/04/2015 09:11
Alder Pump Station Upgrade E10359 $2,800,000.00 Local 03/18/16 Hebert, Dan 503-823-2689 The project is to upgrade the pump station for projected future flows, and to integrate the PS operation into the eastside CSO system operation. 11/04/2015 08:11 11/04/2015 09:11
Woodlawn-King Alley Sewer Rehab E10698 $2,800,000.00 Local 03/07/16 Robinson, Kurt 503-823-7133 Sewer Rehab in Woodlawn King neighborhood in alleyways behind residences. 11/04/2015 08:11 11/04/2015 08:11
SW Terwilliger Blvd & Powers Ct Sanitary Swr Ext E10413 $2,250,000.00 local 04/23/16 Brenes-Morua, Wrandoll 503.823.4504 Construct approximately 7,000 linear feet of 8-inch sewer pipe along Terwilliger Blvd. from the Powers Court pump station site to the 30-inch Tryon Interceptor sewer located in Hwy 43. 07/16/2012 13:07 11/04/2015 08:11
Humboldt Sewer Rehabilitation E10564 $2,800,000.00 Local 06/23/16 Harold, Colleen 503-823-5227 The Humboldt Sewer Rehabilitation project will design and construct public sewer pipe replacement (or rehabilitation) for severly deteriorated pipe in Portland's Humbolt neighborhood. 09/21/2015 14:09 11/04/2015 08:11
City of Portland - OMF - BIBS - Facilities
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Justice Center $760,000 Local 02/11/17 Sharon, Raymor, 503.823.6982 Restroom Renovations 02/11/2016 15:02 02/11/2016 15:02
Sears Building Fuel Facility $3,000,000,00. Local 03/27/17 Sharon, Raymor, 503.823.6982 Build a new fueling station at Sears building 01/27/2016 10:01 02/11/2016 15:02
SmartPark and North Precinct Garage repair resurface $1,567,355.00 Local 03/27/16 Laura, Pedersen, 503.823.5562 Repair and resurface (4) SmartPark garages and (1) North Precinct police facility 01/27/2016 16:01 01/27/2016 16:01
1st & Jefferson Garage Lighting Project $32,000.00 Local 03/27/16 Sara, Grady, Danny 503.823.3919 LED installation 01/27/2016 10:01 01/27/2016 10:01
City Hall Exterior $3,000,000.00 Local 03/27/17 Randi, Selleck, 503.823.5060 Exterior (cleaning, restoration/repair), Roofing, and HVAC 01/27/2016 10:01 01/27/2016 10:01
The Portland Building Renovation $DBR= $153,000,000.00 Local 06/27/16 Kristen, Wells, 503.823.1181 Renovation 01/27/2016 10:01 01/27/2016 10:01
Replacement of City Fuel Facilities $6,000,000 Local 06/02/17 Sharon, Raymor, 503.823.6982 Replace fueling stations at up to six sites & develop fuel facility at a new site to be acquired. 10/08/2015 11:10 01/27/2016 10:01
Portland Communications Center $4,000,000.00 Local 04/04/16 Sharon, Raymor, 503.823.6982 Roofing, HVAC, Seismic 10/08/2015 11:10 01/27/2016 10:01
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Colonel Summers Park Gates Project $TBD SDC 02/08/16 Medellin, Marlo 503-823-5581 Construction administration for Colonel Summers Park Gates Project. 01/12/2016 16:01 01/28/2016 16:01
Sellwood Park Roof Construction Project P30111&P30112 $TBD Bond 06/10/16 Johnson, Connie 503-823-5571 Construction administration to replace bathhouse roof at Sellwood Park. 01/12/2016 16:01 01/28/2016 16:01
St. Johns Community Center Construction Project P30113&P30114 $TBD Bond 04/11/16 Medellin, Marlo 503-823-5581 Construction administration for miscellaneous repairs at St. Johns Community Center. 01/12/2016 16:01 01/28/2016 16:01
Mt. Tabor/Urban Forestry Facilities P30075&P30076 $TBD Bond 06/01/16 Meamber, Susan 503-823-9709 Renovation of Mt. Tabor/Urban Forestry Facilities. 01/28/2016 16:01 01/28/2016 16:01
Wilkes Park Loo P30116 $TBD Bond 03/28/16 Datka, Gary 503-823-5574 Installation of new Portland Loo in Wilkes Park 01/28/2016 16:01 01/28/2016 16:01
Parklane Park Loo P30110 $TBD Bond 06/01/16 Datka, Gary 503-823-5574 Installation of new Portland in Parklane Park. 01/28/2016 16:01 01/28/2016 16:01
Matt Dishman CC Pool P30051 $TBD Bond 03/30/16 Hutchinson, Jill 503-823-5583 Renovation of Matt Dishman CC Pool 01/28/2016 16:01 01/28/2016 16:01
Walker Stadium Demolition $TBD Local 04/01/16 Cook, Dale 503-823-5766 PP&R Construction Bid 01/28/2016 16:01 01/28/2016 16:01
Beech Park $TBD Local 06/01/16 Herwig, Britta 503-823-5476 CM/GC project for PP&R CIP Team 01/28/2016 16:01 01/28/2016 16:01
Gateway Park $TBD Local 06/01/16 Lozovoy, George 503-823-5595 CM/GC project for PP&R CIP Team. 01/28/2016 16:01 01/28/2016 16:01
Springwater Corridor Sellwood Gap Trail $TBD Local 03/01/16 Lozovoy, George 503-823-5595 Construction bid for PP&R CIP Team. 01/28/2016 16:01 01/28/2016 16:01
Halprin Sequence CM/GC P00721 Unknown Voluntary LID 07/15/16 Burtzos, Sandra 503-823-5594 Restoration of the four Halprin Parks - Source Fountain, Lovejoy, Pettygrove, Ira Keller. 05/21/2015 14:05 01/14/2016 14:01
April HIll Park Improvement and Restoration Project P10445 $250-$300K Local 01/29/16 Tyler, Lisa 503-823-5116 Improve access to park natural area and protect wetland through improved trail access and construction of boardwalk and bridges through wetland and across Wood Creek. Restoration planting within the wetlands and surrounding area. 02/09/2015 15:02 12/22/2015 16:12
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
2015 Signal Rebuilds T00468, T00470 $800K - $900K Local 02/29/16 Adre, Norberto 503-823-5176 This is a Re-bid. Signal and Electrial work, Concrete flatwork, Paving 02/04/2016 13:02 02/04/2016 13:02
Twenties Bikeway: NE Lombard - SE Crystal Springs T00338 $1,700,000 to 2,100,000 Federal 02/22/16 Newlands, Rich 503-823-7780 Grading, Drainage, Paving, Striping, Signing, Signals & Roadside Development 02/04/2016 11:02 02/04/2016 11:02
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
SW Flower Terrace Water Main Improvement Project W01865 $450,000 Local 06/17/16 Mackinnon, David 503-823-7489 This project will replace 1490 feet of 4-inch CI main with 6-inch main and renew 35 1-inch services and install 2 hydrants and replace 1 hydrant. 01/12/2016 14:01 01/14/2016 16:01
SW Commonwealth Ave East of Cross W01867 $215,000 Local 03/01/16 Wilde, Jamie 503-823-9083 This project will replace 634ft of 2-inch galvanized main with 4-inch main and 6-inch main and replace 9 1-inch services and install 2 hydrants. 10/27/2015 12:10 01/13/2016 11:01
Groundwater Electrical Supply Improvements W01371 $1,810,000 Local 03/10/16 Easley, Patrick 503-823-7005 This project constructs a new 115kV/4160V transformer and other components to complete a double-ended electrical substation at the Groundwater Pump Station. It will also construct a 5kV main breaker replacement and purchase selected spare components. 10/05/2012 10:10 01/06/2016 16:01
NW Saltzman Rd Main Replacement W01796 $335,000 Local 08/01/16 Ward, Dan 503-823-2799 This project will design and construct a replacement for the existing 1570 feet of 2- to 2½-inch galvanized water main in NW Saltzman Road. The project will use 2-inch HDPE pipe for the water main. Three ¾-inch services will be renewed, and two 1-inch services will be transferred. No hydrants. 10/26/2015 15:10 12/11/2015 15:12
Rockwood PUD Meter Vault Relocation W01489 $280,000 Local 04/01/16 Bryan, Robinson, 503-823-6518 This project will relocate the existing 8-inch wholesale meter, vault, and appurtenances supplying the Rockwood Public Utility District (PUD) at the intersection of SE 182nd and Division Street to a location that is safe for maintaining. The project will require construction during the night to minimize traffic impacts. Two new utility vaults will be installed in the sidewalk to house an 8-inch protectus fire service meter and a pressure reducing valve. A new remote terminal unit cabinet will be upgraded to bring it up to code and move it out of the existing ADA Sidewalk Ramp. 05/28/2015 11:05 12/11/2015 15:12
Council Crest Tank Roof Replacement W01848 $700,000 Local 09/07/16 Foronda, Erna 503-823-7346 This project will replace the Council Crest Tank roof and upper wall shell. 12/11/2015 15:12 12/11/2015 15:12
Cornell Road Services - Macleay Park W01682 $525,000 Local 03/11/16 Chambers, Chris 503-823-4635 This project will bore approximately 7200 feet of 3-inch HDPE main in Cornell Road from the existing 8-inch main east of Skyline Boulevard (Greenleaf 1250 pressure zone) east to the Cornell Road services. This alternative will require up to three 2x2-inch regulators to keep the Cornell Road services supplied at the current HGL of 731 feet. 12/11/2015 13:12 12/11/2015 13:12
Page Views: 1386714