View More

Downtown Traffic Impacts

Last Update: Aug. 30th, 2016

 

Downtown Construction Projects

The following projects are permitted long term use of the street and sidewalk to facilitate construction on private property.

 

   

  • SW 3rd & Taylor: Hotel construction closes sidewalks and parking  and intermittent lane closures on the north side of Taylor and east side of 3rd. Projected project completion Oct 2016. Contact is Mortenson construction 971.202.4107
  • NW 4th, Burnside, 5th: Remodel and new hotel construction on 1/2 block site.  Sidewalks and parking removed, intermittent lane closures on NW 4th for concrete and crane work. Projected completion May 2017.  Howard S Wright Constructors, Jamey Shaw at 503-220-0895.
  • SW 4th & Stark: interior building demolition. Project closes sidewalks on east side of SW 4th between Stark - Washington and south side of SW Stark between 3rd - 4th, as well as the turn lane on SW Stark.
  • SW 6th, Harrison, Broadway, Montgomery: PSU building remodel and addition, sidewalks and parking fenced.  Intermittent street closures on SW Montgomery.  Project contact is Skanska USA Building at 503-382-0900..
  • NW 11th & Hoyt: 1/4 block project, demo and new construction.  Projected completion October 2017.  Bremik Construction, Todd Smith, 503-220-0895.
  • SW 14th, 15th, Yamhill and Taylor St: Interior remodel.  Project closes sidewalks and park on the East side of 15th between Taylor-Yamhill and south side of Yamhill 14th-15th.  Intermittent lane closures. Projected project completion July 2016.  contact Eric Newby 503.459.4477.
  • SW 17th, Taylor-Yamhill: May 17th, 9am-3pm, Lane & sidewalk closure.
  • NW Couch, 9th, Davis: 1/2 block demo and new construction.  Sidewalks and parking closed, intermittent lane closures for concrete pours and utility connections.  Projected completion July 2017.  Walsh Construction, Nick Leeding at 503-222-4375.
  • NW Davis, 1st, Couch, Naito: Demo of existing parking lot and new construction on 3/4 of the block.  Sidewalks closed around site perimeter.  Contact is Tom Hammons at Andersen Construction, 503-283-6712.
  • SW Jefferson, 2nd, Columbia: New construction on a half-block site.  Sidewalk and parking removal adjacent to site, intermittent lane closures on SW Jefferson and SW 2nd during utility work and concrete pours.   
  • NW Naito, 9th-15th: East side lane and sidewalk closures during building.
  • NW Overton, 12th, Pettygrove, 13th: full block project.  Sidewalk and parking closures all around, intermittent street and lane closures on NW 12th, NW Pettygrove, and NW Overton. Project completion date is Sept. 2016. Contact is Brian Anthony at 503-283-6712. 
  • NW 13th, 14th Quimby, Pettygrove: Closes traffic lanes, bike lanes and sidewalks during construction at 1420 NW 14th
  • SW Jefferson, 11th, & 12th: Demo of existing building and new construction of 15-story apartment building.  Sidewalk and parking on three sides, lane closures on Jefferson and 12th.   
  • SW Moody, Abernethy, Bond:  Project completion 2016. All Hours. Lanes and sidewalks. Fenced job site.
  • SW Taylor, 15th-16th, Sidewalk closure & intermittent lane and street closures, Fenced job site.
  • SW Washington, 4-5 and SW 4th, Alder-Washington: 2016 completetion, All Hours, Remodel of building.
  • SW 15th and SW Morrison: New construction, sidewalk and parking closed adjacent to site, intermittent lane closure on SW 15th
  • SW Curry, River Pkwy, Bond, & Whitaker: New construction, sidewalk, parking, and lanes closed adjacent to site at 3410 & 3485 SW Bond Ave
  • NW Flanders, 9th, Everett, Park: New construction on 3/4 block site.  Parking and sidewalk closures, intermittent lane and street closures for concrete pours and crane lifts.
  • SW Columbia, Broadway, and Clay: New construction of 20-story tower.  Parking, sidewalk, and travel lane closures.  Projected completion date late summer 2018. Project contact: Howard S Wright Construction, 503-220-0895. 
  • NW 9th & Glisan: New construction of 11-story hotel.  Parking, sidewalk, and intermittent travel lane closures.  Projected completion date March 2018.  Project contact: Bremik Construction, 503-688-1000.

 

Utility Work, Crane Lifts, & Other Use Resulting in Lane or Street Closures

The following streets are expected to have impacts from private construction, utility work, crane lifts: 

 

  • SW 1st, Taylor-Yamhill: Aug. 30th, 9am-3pm, Lane closed for crane lift
  • SW 2nd, Oak-Stark: Sept. 1st-7th, Lane closure, Utility work, 7am-6pm
  • SW 4th, Oak-Stark: Aug. 22nd-Sept 2nd, Lane closure, 7am-4pm
  • SW 4th, Oak-Pine: Aug 22nd-30th, Lane closure, 7am-4pm
  • SW 9th, Couch-Davis: Sept 1st-Nov 16th, Lane closure, All Days, 7am-5pm
  • SW 10th, Oak-Washington: Aug. 31st- Sept. 9th, 9am-3pm, Lane closed for utility work
  • NW 13th, Flanders-Glisan: Aug. 31st-Sept. 6th, 9am-3pm, Lane closed for utility work
  • NW 14th, Pettygrove-Quimby: Aug. 24th- Sept. 2nd, 9am-3pm, Lane closed for utility work
  • NW 19th, NW Overton-NW Pettygrove: July 14th - Sept 14th, Lane Closure, All Hours
  • SW Broadway, SW Market-SW Mill: September 10th, Lane closure & sidewalk closure, 6am-5pm Saturday
  • SW Broadway, Salmon-Taylor: Sept 1st, left lane closed for crane work 9am-3pm
  • W Burnside, 4th-6th: Aug.31st-Sept. 9th, Lane closed for utility work
  • W Burnside, 12th-13th: Aug. 26th-Sept. 2nd, 9am-3pm, Lane closed for Building maintenance
  • SW Clay, SW Broadway-SW Park: Lane Closure, August 29th-Sept. 13th, 8:30am-3pm, Monday-Saturday
  • SW Columbia, Broadway-Park: Lane & sidewalk closure, Aug. 29th - Sept. 1st, 7am-5pm
  • SW Gaines, SW River Pkwy-Dead End: Street closure, August 25th-October 7th All Hours, All Days
  • NW Glisan, 12th-13th: Aug.31st-Sept. 6th, 9am-3pm, Lane closed for utility work
  • NW Glisan, 13th-14th: Sept. 7th-13th, 9am-3pm, Lane closed for utility work
  • NW Hoyt, 13th-14th: Sept 1st, Street, South side sidewalk & block face parking for Crane work, 6am-10pm
  • SW Jefferson, 4th-5th: Lane Closure, Aug 24th-Sept 16th, 9am - 3pm Mon-Fri
  • NW Johnson, 12th-13th; July 11th-Sept. 2nd, intermittent street & lane closure, 8am-3:30pm
  • NW Johnson, 12th-13th: Sept. 9th, Street closed, 8am-4pm.
  • NW Kearney, 12th-13th: July 11th-Sept 2nd, Intermittent lane closure, 8am-3:30pm
  • SW Market, 2nd-4th: Aug 23-29, 9am-3pm, lane closure for sewer inspection.
  • NW Quimby, 14th-15th: Aug. 29th-31st, 7:30am-3:30pm, Lane closed for utility work
  • SW Stark, Broadway-Park: Aug. 31st-Sept 9th, Alternating lane closure, 9am-3pm, Tue-Sat
  • SW Stark, 6th-Broadway: Aug. 31st- Sept. 9th, 9am-3pm, Lane closed for utility work
  • SW Stark, 11th-12th: Aug. 31st-Sept. 8th, 9am-3pm, Lane closed for utility work
  • SW Taylor, 15th-16th: Sept 1st-Sept 30th, Lane closure, 7am-5pm, Mon-Sat

 

 

Multnomah County Bridges - Use link for bridge closures & updates

Portland5's Centers for the Arts

Arlene Schnitzer Concert Hall & Keller Auditorium School Buses for Performances

  • Schnitzer: Nothing scheduled 
  • Keller: Nothing scheduled

SW Main Street (gates), SW Broadway to Park: closures for performances & events

 

Click here for Community Event Calendar

Click here for Citywide fairs and events

Click here for Special Events such as runs, parades & other moving events 

To receive automated notices about large special events that will have traffic impacts, simply use the Portland "subscribe" option and subscribe to Transportation.

 

The above information from the Portland Bureau of Transportation on expected traffic conditions was prepared based on known construction traffic control plans at the time of writing. The information is subject to change as new information becomes available.