Part 00300
| Part 00300 |
|
Roadwork |
||
| Section | Description | Effective Date |
| 00310 | Removal of Structures and Obstructions | 06-24-09 |
| 00320 | Clearing and Grubbing | 05-14-08 |
| 00330 | Earthwork (May require 00235) | 09-03-08 |
| 00331 | Subgrade Stabilization (Requires 02320) | 01-21-08 |
| 00332 | Surfacing Stabilization (Requires 02320) | 01-21-08 |
| 00333 | Aggregate Ditch Lining | 01-02-03 |
| 00334 | Preparation of Shoulders | 01-02-03 |
| 00335 | Blasting Methods and Protection of Excavation Backslopes | 01-21-08 |
| 00340 | Watering | 01-21-08 |
| 00344 | Treated Subgrade | 01-02-03 |
| 00350 | Geosynthetic Installation (Requires 02320) | 11-24-08 |
| 00360 | Drainage Blanket | 01-21-08 |
| 00370 | Finishing Roadbeds | 01-02-03 |
| 00380 | Roadwork, Hourly Rate Basis | 01-02-03 |
| 00390 | Riprap Protection (Requires 02320 with riprap geotextile. Requires 02690 with grouted riprap item. May require 00350) | 01-21-08 |
| 00396 | Shotcrete Slope Stablization | 01-02-03 |