How do I submit Revisions & Deferred Submittals?

(When submitting Revisions & Deferred Submittals you must fill out an FPP Intake Form and specify what corresponding facilities permit number that is associated with your Revision or Deferred submittal.)

DFS:

  1. A copy of this application
  2. Three (3) sets of plans
  3. Two (2) set of calculations
  4. Two (2) sets of product information
  5. Drawings and calculations must be stamped and signed by an Engineer registered in Oregon and approved by the Architect/Engineer of record for the building.

REVISION:

  1. A copy of the revision application   
  2. Three (3) sets of plans that clearly reflect the proposed change(s). Drawings and calculations must be stamped and signed by the Architect and/or the Engineer of Record, if applicable.
  3. Two (2) sets of calculations, if applicable
  4. Inspector’s correction notice, if revision is due to an inspection correction