Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To view current City contract opportunity solicitations and receive notices as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: procure.portlandoregon.gov/bso/

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Boones Ferry Culvert E08682 $6,441,000.00 Local 10/24/18 Brennecke, Eric 503-823-7651 Retrofit/replace the Boones Ferry Culvert on Tryon Creek to increase capacity and provide fish passage. The project will include channel enhancement work to control the grade of the creek and protect streambanks and will protect an exposed 18-inch sewer line crossing the creek approximately 145 feet upstream of the culvert. 04/04/2016 12:04 08/01/2018 11:08
Capitol Hwy, Multnh to Texas Sewer Rehab E11049 $435,000.00 Local 07/19/18 Hjorten, Susan 503-823-7098 Rehabilitate/replace small diameter severely deteriorated public sewer, manholes and sewer laterals in SW Capitol Hwy between SW Multnomah Blvd and SW Texas. This work has been removed from the SW Hillsdale Sewer Rehab project E10681. It is being expedited to be completed with PBOT's project T00586. 03/06/2018 15:03 08/01/2018 11:08
CBWTP DWCL Wear Strip Replacement E11050 $648,229.00 Local 08/23/18 Lawler, Aaron 503-823-2476 This project would replace the chain, sprockets, and wear strips in each of the four DWCLs at CBWTP. 05/07/2018 08:05 08/01/2018 11:08
CBWTP Hypo Bldg Ventilation Upgrade E10914 $111,200.00 Local 09/22/18 Suto, Paul 503-823-2436 Evaluate, design, and install adequate ventilation to remove harmful sodium hypochlorite fumes from the Hypo Receiving Building transfer pump room. 03/06/2018 16:03 08/01/2018 11:08
CBWTP Organic Waste Receiving Facility E10804 $4,838,000.00 Local 09/12/18 Maag, Jeff 503-823-2634 Construct a facility to accept organic waste (commercial food wastes, fats, oils and grease) and process the waste in the anaerobic digesters to produce biogas at the Columbia Boulevard Wastewater Treatment Plant (CBWTP). The biogas can be converted to renewable energy-electricity, heat, or vehicle fuel. 04/02/2018 10:04 08/01/2018 11:08
CBWTP WWCL 5 & 6 Wear Strip Replacement E11047 $372,782.57 Local 07/31/18 Lawler, Aaron 503-823-2476 This project would replace the wear strips in CBWTP WWCLs 5 & 6 from UHMW material to 316 SS, to restore the asset and maximize longevity. 07/02/2018 13:07 08/01/2018 11:08
Cherry Park PS Grinder REPL E11077 $198,690.00 Local 11/09/18 Nguyen, Huong 503-823-2625 To replace an existing failing grinder at Cherry Park PS. 05/07/2018 09:05 07/02/2018 13:07
Digester 3 Dome Repair E11101 $423,000.00 Local 09/05/18 Hammond, David 503-823-9686 Stabilize and fix in place the Dome of Digester 3 which is beginning to fail and rotate in to the Digester. 08/01/2018 11:08 08/01/2018 11:08
DTOT Caruthers-Mill Sewer Rehab E10986 $6,500,000.00 Local 09/06/18 Hjorten, Susan 503-823-7098 Design and construction of sewer rehab in DTOT area south of SW Mill Street. 03/06/2018 16:03 08/01/2018 11:08
E Lents Striping Piles - Reedway Site E10855 $435,000.00 local 06/15/18 Short, Emily 503-823-2067 Remove and dispose of the remaining East Lents stripping pile material located at the SE Reedway Street site 04/02/2018 10:04 08/01/2018 11:08
Errol Heights Stormwater LID E10917 $2,332,583.00 Local 01/17/19 Wilson, Brandon 503-823-7786 LID in Errol Heights to improve streets and add stormwater infrastructure. 08/01/2018 11:08 08/01/2018 11:08
Guilds Lake PS 30-inch Pig Launcher E11096 $355,840.00 Local 10/30/18 Wood, Kelly 503-823-2657 Construct a pig launch facility for a 30-inch force main. 07/02/2018 13:07 08/01/2018 11:08
Hillsdale Crest RDII E10941 $6,800,000.00 Local 09/06/18 Young, Henry 503-823-7278 This project will address the implementation of sewer improvements to control the DeWitt SSO within the Burlingame Basin. 04/02/2018 10:04 08/01/2018 11:08
Inverness PS 20-inch FM Repairs E10979 $910,000.00 Local 01/18/19 Wood, Kelly 503-823-2657 Repair a 500 foot segment of force main and its abutment supports. Replace existing air and vacuum valves and improve maintenance access to the valves. 08/01/2018 12:08 08/01/2018 12:08
JC Oxbow Permanent Scour Repair E10996 $335,564.33 Local 04/13/18 Bistoff, Sean 503-823-7125 The oxbow is a high energy reach of Johnson Creek with significant bank erosion near the apex of the meander, on the NE side. This erosion occurs along the right bank, where the oxbow begins turning toward the west. Large wood deposited in this area directed flow toward the right bank, causing scour and bank failure on BES property. The bank has receded roughly 30' over the past several winters, threatening the private residence at 4330 SE Tenino St. and the BES ACZ290 outfall structure. The scope of the project is for Greenworks to complete design of the preferred alternative from a Pre-Design report produced by ESA Vigil-Agrmis. This alternative lays back the over-steepened eroding bank, installs large wood barbs, and lowers the bank elevation at the tip of the oxbow meander. Greenworks will also provide engineering during construction, which will occur in Summer 2018. 04/02/2018 10:04 08/01/2018 12:08
Johnson Cr Oxbow E08406 $335,564.33 Local 01/29/19 Sean, Bistoff, 503-823-7125 Determine improvements needed to increase flood storage and improve habitat at the Johnson creek Oxbow and implement those improvements. 02/14/2017 14:02 08/01/2018 12:08
Lombard FM Break Repair E11061 $30,715.00 Local 08/08/18 Lawler, Aaron 503-823-2476 Investigation and repair of a leak in the 30-inch Lombard Force Main approximately 250 downstream from Lombard PS. 03/07/2018 10:03 08/01/2018 12:08
N Alberta - Missouri EMERGENCY Sewer E11097 $434,000.00 Local 07/02/18 Hess, Randy 503-823-7658 Replacing 66-ft. of 24" combined sewer at a depth of 23-24 feet in a high traffic area 07/02/2018 14:07 08/02/2018 08:08
NE 12th/13th and Humboldt Sewer Rehab E11070 $581,000.00 Local 01/18/19 Chan, Terence 503-823-7087 Replace the existing combined sewer mains and laterals in NE 12th and NE 13th between NE Humboldt and Wygant and upsize the sewer mains to comply with current standard. 05/07/2018 09:05 08/01/2018 12:08
NE 20th and Tillamook Sewer Rehab E11094 $426,000.00 Local 01/07/19 Chan, Terence 503-823-7087 Replace or rehabilitate the existing 8" sewer main and laterals on NE 20th Ave. between NE Tillamook and NE Thompson St. Upsize the sewer main to comply with current standard if necessary. 08/02/2018 08:08 08/02/2018 08:08
NE Broadway & 94th PS Upgrade E10783 $2,024,400.00 Local 05/03/19 Nguyen, Huong 503-823-2625 The project is to upgrade the pump station to improve reliability and maintenance. 06/04/2018 09:06 08/02/2018 08:08
NE Cleveland / NE 10th Sewer Rehab E10997 $626,000.00 Local 10/01/18 Boatman, Daniel 503-823-7162 Rehabilitate or replace 445 lf of 10" and 465 lf of 14" combined sewer and all active laterals on NE 10th between NE Fremont and Beech and NE Cleveland between NE Mason and Skidmore respectively. The manholes may be replaced or rehabilitated depending on the conditions. 03/07/2018 10:03 08/02/2018 08:08
NE Everett and 26th SS Rehabilitation E10927 $310,000.00 10/25/18 Short, Emily 503-823-2067 Reconstruct approximately 350 ft of sewer main along NE Everett Street between NE 26th and 27th Avenues. The existing sewer main is 22" diameter and currently has two live laterals. Due to these conditions, the proposed replacement sewer main will be downsized to 12" diameter. 09/13/2017 13:09 08/02/2018 08:08
Portsmouth FM Valve Vault Level Mntrng E10735 $327,708.00 10/04/18 Thompson, Clarence II. 503-823-2623 Install permanent wireless liquid level alarm monitors for three air/vacuum valve vaults on the Portsmouth Force Main. 09/13/2017 14:09 08/02/2018 08:08
SE 43rd/Belmont Capacity Improvements E10942 $840,000.00 Local 07/03/18 Gualotunia, Melanie 503-823-7189 Upsize pipe(s) and/or modify combined sewer system flows to fully resolve significant recurrent basement sewer backup risk in the project area. 03/07/2018 10:03 08/02/2018 10:08
SICSO PS Power Feed Reliability Imp E10711 $215,000.00 Local 08/02/18 Thompson, Clarence II. 503-823-2623 This project will rectify power distribution deficiencies within the pump station. 08/02/2018 10:08 08/02/2018 10:08
SLRT 2017 Panel Build E10921 $178,000.00 Local 04/10/18 Thompson, Clarence II. 503-823-2623 Build ten new sewer level remote telemetry (SLRT) panels in support of upcoming SLRT replacement and installation projects throughout the City. The panels would be built by a panel fabrication shop within the greater Portland/Wilsonville area. They will be installed under other projects. This project is just to release funds so that the panel builder can build the panels. 04/02/2018 11:04 08/02/2018 11:08
SLRT Monitoring Upgrades FY 16 & 17 E10743 $347,000.00 Local 08/23/18 Thompson, Clarence II. 503-823-2623 Scope: Replace the existing SLRT Monitoring Panels at nine locations with new SLRT panels. Add a radar flow sensor at one of the nine locations. Replace existing retaining wall surrounding a SLRT panel at a tenth location. Objective: to modernize HYDRA data collection for the City sewer system in order to prevent CSO events. 03/07/2018 10:03 08/02/2018 11:08
Structural Rehabilitation Taggart OF 30 E10220 $14,805,000.00 Local 04/30/18 Cleys, Tammy 503-823-7641 Structural rehabilitation of the Taggart outfall, a 1906 combined sewer. The sewer ranges in size from 64 to 118 inches in diameter at depths of 20 to 65 feet. 04/02/2018 11:04 08/02/2018 11:08
Sunnyside North Recon/Green Street E10367 $6,250,000.00 Local 07/28/18 Wilson, Brandon 503-823-7786 Construct improvements to rehabilitate pipe segments in poor condition, upsize pipe segments and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 37th, Taylor, and 20th. 12/17/2015 14:12 08/02/2018 11:08
SW Capitol Hwy Stormwater Improvements E10939 $10,586,800.00 Local 01/14/19 Gonzalez, Ruben 503-823-0547 BES is partnering with PBOT to address public infrastructure deficiencies along a 1-mile stretch of SW Capitol Highway between Multnomah & Barbur Blvd.'s, and within surrounding stormwater basin areas. Project work will include new roadway cross-sections which seek to integrate traffic, public access, and stormwater management needs, as well as additional stormwater management solutions for several local drainage basins in which drainage & conveyance deficiencies, along with nuisance flooding issues have been identified. 03/06/2018 14:03 08/02/2018 11:08
TCWTP Headworks Improvements E10582 $57,022,419.00 Local 11/08/18 Coker, Jenny 503-823-2689 The TCWTP Facilities Plan Update is nearly complete and has identified key improvements. These improvements are driven by a need to bring the headworks process up to current treatment and efficiency standards, increase peak flow hydraulic capacity, community needs, and an opportunity to improve the plant hydraulic profile. 06/04/2018 09:06 08/02/2018 11:08
Water Pollution Control Lab Site Work E10902 $3,257,146.00 Local 12/31/18 Raymor, Sharon 503-823-6982 The facility has outgrown the secure fleet parking lot, storage building, main parking lot and accessibility needs to be brought up to the current ADA design standards. 08/02/2018 11:08 08/02/2018 11:08
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Mt. Tabor Yard Maintenance Facility & Bike/Pedestrian Path Construction Project P30075 & P10472 $4,500,000.00 Bond 06/01/18 Meamber, Susan 503-823-9709 Construct new shop space per 2008 Master Plan. Design and construct bike/pedestrian trail improvements. 03/16/2017 10:03 08/09/2017 10:08
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
"Fixing Our Streets - High Crash Corridors" - Sandy and Glisan T00568 $250,000.00 Local 08/15/18 Adre, Norberto 503-823-4818 Curb extensions and flashing beacons 02/05/2018 15:02 07/02/2018 11:07
"Fixing Our Streets - Sidewalk Infill 148th Ave: Glisan to Halsey T00596 $750,000 FOS 09/15/18 Joe, Jimi Sidewalk infill, signing, striping, ADA ramps. 07/02/2018 12:07 07/02/2018 12:07
47th Ave: Columbia Blvd-Cornfoot Rd, NE T00539 $4,000,000 - $5,000,000 LID 09/15/18 Blanchard, Nicole 503-823-5474 Grading, Paving, Concrete Flatwork, Concrete Pavement, Drainage, Signing, Striping, Signals, Roadside Development 10/18/2017 16:10 07/02/2018 11:07
Beaverton Hillsdale Hwy: 30th-39th, SW T00570 $375,000 FOS 08/15/18 Roske, Kim Streetscape improvements and ADA ramps. 07/02/2018 12:07 07/02/2018 12:07
Columbia Blvd at MLK Jr. Blvd, NE T00024 $1,500,000 - $2,000,000 Federal 08/15/18 Shepard, Jason 503-823-3776 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 04/04/2016 09:04 07/02/2018 12:07
Fixing Our Streets Paving Denver -Lombard-Watts T00583 $700,000.00 Local 12/15/18 Adre, Norberto 503-823-4818 Paving 02/05/2018 16:02 07/02/2018 12:07
Heavy Vehicle Use Tax - Paving - Marine Dr, Lombard St, Going St T00674-T00676 $2,000,000 - $3,000,000 Local 06/15/18 Adre, Norberto 503-823-4818 Paving, Concrete Flatwork, Signing, Striping, Drainage, Signals 10/19/2017 14:10 07/02/2018 12:07
HSIP 2016 Bike/Ped Improvements T00463 $850,000 - $1,000,000 Federal 08/15/18 Bennett, Ruthanne 503-823-3436 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 10/18/2017 12:10 07/02/2018 12:07
Marine Drive Path: 112th Ave-185th Ave Sec., NE T00437 $345,000.00 Federal 08/15/18 Williams, Linda 5038237154 Multiuse bikepath 06/05/2018 13:06 06/05/2018 13:06
St. Johns Truck Strategy, Phase II: T00453 $1,500,000 MTIP, FOS 08/15/18 Newlands, Rich Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 07/02/2018 12:07 07/02/2018 12:07
Taylors Ferry Rockslide Abatement, SW T00508 $250,000 - $500,000 Local 10/15/18 Heinle, Cedar 503-823-7998 Rockslide Abatement 04/04/2016 09:04 03/05/2018 10:03
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Corrosion Control Improvements Project W02190 $tbd Local 10/17/18 Cheek, Michelle 503-823-4790 The goal of the Corrosion Control Improvements Project is to design and construct a corrosion control treatment facility at Water Bureau's Lusted Hill Facility. The Project will include a new building to house the new corrosion control treatment system, a new utility water pump station, and associated piping and support systems. 03/27/2018 12:03 07/18/2018 13:07
Gilbert Pump Station and Tank Demolition 8WABS0000697 $tbd Local 11/07/18 Robinson, Bryan 503-823-6518 Key milestones of the project are the demolition of the Gilbert Pump Station and Tank, disposal of all debris and restoration of the project site. 03/15/2018 12:03 08/06/2018 16:08
Hazelwood Roof Replacement 8WABS0000595 $40,000 Local 03/12/19 Ngai, S. 503-823-7968 Replace roof on Hazelwood Facility. 05/09/2018 14:05 06/11/2018 16:06
SW Jerald Way W02146 $310,000 Local 09/03/18 Smith, Deborah 503-823-2906 Project will replace a 4-inch cast iron main with a new 6” ductile iron main. 12/05/2017 11:12 07/31/2018 08:07
Willamette Shoreline Railroad Crossing W01358 $220,000.00 Local 10/03/18 Ross, M. 503-823-7408 Update pedestrian crossing over railroad track including sidewalk, hand railing, signage installation and rail track renovation. 05/01/2018 14:05 07/23/2018 09:07