Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To view current City contract opportunity solicitations and receive notices as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: procure.portlandoregon.gov/bso/

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Boones Ferry Culvert E08682 $6,441,000.00 Local 10/24/18 Brennecke, Eric 503-823-7651 Retrofit/replace the Boones Ferry Culvert on Tryon Creek to increase capacity and provide fish passage. The project will include channel enhancement work to control the grade of the creek and protect streambanks and will protect an exposed 18-inch sewer line crossing the creek approximately 145 feet upstream of the culvert. 04/04/2016 12:04 10/01/2018 11:10
Capitol Hwy, Multnh to Texas Sewer Rehab E11049 $435,000.00 Local 10/15/18 Hjorten, Susan 503-823-7098 Rehabilitate/replace small diameter severely deteriorated public sewer, manholes and sewer laterals in SW Capitol Hwy between SW Multnomah Blvd and SW Texas. This work has been removed from the SW Hillsdale Sewer Rehab project E10681. It is being expedited to be completed with PBOT's project T00586. 03/06/2018 15:03 10/01/2018 11:10
CBWTP Dig 9&10 Transfer Pumps REPL E11113 $608,000.00 Local 01/18/19 McKenna, Heather 503-823-6900 Replace existing sludge transfer pumps at CBWTP Digesters 9 and 10 with centrifugal pumps. 09/11/2018 14:09 10/01/2018 11:10
CBWTP DWCL Wear Strip Replacement E11050 $648,229.00 Local 08/23/18 Lawler, Aaron 503-823-2476 This project would replace the chain, sprockets, and wear strips in each of the four DWCLs at CBWTP. 05/07/2018 08:05 10/01/2018 11:10
CBWTP Hypo Bldg Ventilation Upgrade E10914 $111,200.00 Local 09/22/18 Suto, Paul 503-823-2436 Evaluate, design, and install adequate ventilation to remove harmful sodium hypochlorite fumes from the Hypo Receiving Building transfer pump room. 03/06/2018 16:03 10/01/2018 11:10
CBWTP Organic Waste Receiving Facility E10804 $4,838,000.00 Local 09/12/18 Maag, Jeff 503-823-2634 Construct a facility to accept organic waste (commercial food wastes, fats, oils and grease) and process the waste in the anaerobic digesters to produce biogas at the Columbia Boulevard Wastewater Treatment Plant (CBWTP). The biogas can be converted to renewable energy-electricity, heat, or vehicle fuel. 04/02/2018 10:04 10/01/2018 11:10
CBWTP WWCL 5 & 6 Wear Strip Replacement E11047 $372,782.57 Local 01/30/19 Lawler, Aaron 503-823-2476 This project would replace the wear strips in CBWTP WWCLs 5 & 6 from UHMW material to 316 SS, to restore the asset and maximize longevity. 07/02/2018 13:07 10/01/2018 11:10
Cherry Park PS Grinder REPL E11077 $198,690.00 Local 11/26/18 Nguyen, Huong 503-823-2625 To replace an existing failing grinder at Cherry Park PS. 05/07/2018 09:05 10/01/2018 11:10
Columbia Slough Outfall 57 E10918 $4,123,500.00 Local 02/06/19 Young, Henry 503-823-7278 This project will address the implementation of DEQ priority outfall (OF) 57. The goal of this project is to design and construct stormwater facilities that treat runoff from the high traffic public roadways within Outfall Basin 57. 09/11/2018 14:09 10/01/2018 11:10
Digester 3 Dome Repair E11101 $423,000.00 Local 09/05/18 Hammond, David 503-823-9686 Stabilize and fix in place the Dome of Digester 3 which is beginning to fail and rotate in to the Digester. 08/01/2018 11:08 10/01/2018 11:10
E Lents Striping Piles - Reedway Site E10855 $435,000.00 local 06/15/18 Short, Emily 503-823-2067 Remove and dispose of the remaining East Lents stripping pile material located at the SE Reedway Street site 04/02/2018 10:04 10/01/2018 11:10
Errol Heights Stormwater LID E10917 $2,332,583.00 Local 04/13/19 Wilson, Brandon 503-823-7786 LID in Errol Heights to improve streets and add stormwater infrastructure. 08/01/2018 11:08 10/01/2018 11:10
Guilds Lake PS 30-inch Pig Launcher E11096 $355,840.00 Local 10/30/18 Wood, Kelly 503-823-2657 Construct a pig launch facility for a 30-inch force main. 07/02/2018 13:07 10/01/2018 11:10
Hillsdale Crest RDII E10941 $6,800,000.00 Local 03/26/19 Young, Henry 503-823-7278 This project will address the implementation of sewer improvements to control the DeWitt SSO within the Burlingame Basin. 04/02/2018 10:04 10/01/2018 11:10
Inverness PS 20-inch FM Repairs E10979 $910,000.00 Local 01/18/19 Wood, Kelly 503-823-2657 Repair a 500 foot segment of force main and its abutment supports. Replace existing air and vacuum valves and improve maintenance access to the valves. 08/01/2018 12:08 10/01/2018 11:10
Johnson Cr Oxbow E08406 $335,564.33 Local 03/12/19 Sean, Bistoff, 503-823-7125 Determine improvements needed to increase flood storage and improve habitat at the Johnson creek Oxbow and implement those improvements. 02/14/2017 14:02 10/01/2018 11:10
Lombard FM Break Repair E11061 $30,715.00 Local 12/14/18 Lawler, Aaron 503-823-2476 Investigation and repair of a leak in the 30-inch Lombard Force Main approximately 250 downstream from Lombard PS. 03/07/2018 10:03 10/01/2018 11:10
Luther Rd. Restoration (FEMA) E10854 $ 1,570,816.00 Local 02/04/19 Lastomirsky, Chris 503-823-5489 Geomorphic & habitat assessment 09/11/2018 15:09 10/01/2018 11:10
N Alberta - Missouri EMERGENCY Sewer E11097 $434,000.00 Local 07/02/18 Hess, Randy 503-823-7658 Replacing 66-ft. of 24" combined sewer at a depth of 23-24 feet in a high traffic area 07/02/2018 14:07 10/01/2018 12:10
N Commercial and N Shaver Sewer Rehab E11092 $357,000.00 Local 03/13/19 Chan, Terence 503-823-7087 Rehabilitate the existing 12" sewer main and laterals 09/11/2018 15:09 10/01/2018 12:10
NE 12th/13th and Humboldt Sewer Rehab E11070 $581,000.00 Local 01/18/19 Chan, Terence 503-823-7087 Replace the existing combined sewer mains and laterals in NE 12th and NE 13th between NE Humboldt and Wygant and upsize the sewer mains to comply with current standard. 05/07/2018 09:05 10/01/2018 12:10
NE 20th and Tillamook Sewer Rehab E11094 $426,000.00 Local 01/14/19 Chan, Terence 503-823-7087 Replace or rehabilitate the existing 8" sewer main and laterals on NE 20th Ave. between NE Tillamook and NE Thompson St. Upsize the sewer main to comply with current standard if necessary. 08/02/2018 08:08 10/01/2018 12:10
NE Broadway & 94th PS Upgrade E10783 $2,024,400.00 Local 06/20/19 Nguyen, Huong 503-823-2625 The project is to upgrade the pump station to improve reliability and maintenance. 06/04/2018 09:06 10/01/2018 12:10
NE Cleveland / NE 10th Sewer Rehab E10997 $626,000.00 Local 12/06/18 Boatman, Daniel 503-823-7162 Rehabilitate or replace 445 lf of 10" and 465 lf of 14" combined sewer and all active laterals on NE 10th between NE Fremont and Beech and NE Cleveland between NE Mason and Skidmore respectively. The manholes may be replaced or rehabilitated depending on the conditions. 03/07/2018 10:03 10/01/2018 12:10
NE Everett and 26th SS Rehabilitation E10927 $310,000.00 12/12/18 Short, Emily 503-823-2067 Reconstruct approximately 350 ft of sewer main along NE Everett Street between NE 26th and 27th Avenues. The existing sewer main is 22" diameter and currently has two live laterals. Due to these conditions, the proposed replacement sewer main will be downsized to 12" diameter. 09/13/2017 13:09 10/01/2018 12:10
Reed College Manhole Rehabilitation E10618 $35,000.00 Local 02/05/19 Chan, Terence 503-823-7087 Investigate and research the options for resolving infiltration problem in manhole ACN310. 09/11/2018 15:09 10/01/2018 12:10
S Portland - Burlingame Sewer Rehab Ph1 E10680 $3,518,266.40 Local 02/27/19 Boatman, Daniel 503-823-7162 Rehabilitate / replace of small diameter severely deteriorated public sewer, some manhole replacement, and some public lateral replacement, in the Hillsdale area of SW Portland. 09/11/2018 15:09 10/01/2018 12:10
SE 43rd/Belmont Capacity Improvements E10942 $840,000.00 Local 07/03/18 Gualotunia, Melanie 503-823-7189 Upsize pipe(s) and/or modify combined sewer system flows to fully resolve significant recurrent basement sewer backup risk in the project area. 03/07/2018 10:03 10/01/2018 12:10
SICSO PS Power Feed Reliability Imp E10711 $215,000.00 Local 10/30/18 Thompson, Clarence II. 503-823-2623 This project will rectify power distribution deficiencies within the pump station. 08/02/2018 10:08 10/01/2018 12:10
Slough Outfall 100 E10689 $2,487,600.00 Local 03/07/19 Leis, Patrick 503-823-7377 This project is for the design and construction of stormwater treatment facilities to treat stormwater runoff from City ROW in outfall basin 100. The basin contains 25 acres of COP ROW. 09/11/2018 15:09 10/01/2018 12:10
SLRT Monitoring Upgrades FY 16 & 17 E10743 $347,000.00 Local 12/14/18 Thompson, Clarence II. 503-823-2623 Scope: Replace the existing SLRT Monitoring Panels at nine locations with new SLRT panels. Add a radar flow sensor at one of the nine locations. Replace existing retaining wall surrounding a SLRT panel at a tenth location. Objective: to modernize HYDRA data collection for the City sewer system in order to prevent CSO events. 03/07/2018 10:03 10/02/2018 13:10
Sunnyside North Recon/Green Street E10367 $6,250,000.00 Local 10/12/18 Wilson, Brandon 503-823-7786 Construct improvements to rehabilitate pipe segments in poor condition, upsize pipe segments and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 37th, Taylor, and 20th. 12/17/2015 14:12 10/02/2018 13:10
SW Capitol Hwy Stormwater Improvements E10939 $10,586,800.00 Local 01/14/19 Gonzalez, Ruben 503-823-0547 BES is partnering with PBOT to address public infrastructure deficiencies along a 1-mile stretch of SW Capitol Highway between Multnomah & Barbur Blvd.'s, and within surrounding stormwater basin areas. Project work will include new roadway cross-sections which seek to integrate traffic, public access, and stormwater management needs, as well as additional stormwater management solutions for several local drainage basins in which drainage & conveyance deficiencies, along with nuisance flooding issues have been identified. 03/06/2018 14:03 10/02/2018 13:10
TCWTP Disinfection Improvements Phase 1 E11112 $1,137,175.05 Local 03/25/19 McKenna, Heather 503-823-6900 Improve disinfection treatment process at TCWTP. 10/02/2018 13:10 10/02/2018 13:10
Water Pollution Control Lab Site Work E10902 $3,257,146.00 Local 12/31/18 Raymor, Sharon 503-823-6982 The facility has outgrown the secure fleet parking lot, storage building, main parking lot and accessibility needs to be brought up to the current ADA design standards. 08/02/2018 11:08 10/02/2018 13:10
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Mt. Tabor Yard Maintenance Facility & Bike/Pedestrian Path Construction Project P30075 & P10472 $4,500,000.00 Bond 06/01/18 Meamber, Susan 503-823-9709 Construct new shop space per 2008 Master Plan. Design and construct bike/pedestrian trail improvements. 03/16/2017 10:03 08/09/2017 10:08
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
"Fixing Our Streets - High Crash Corridors" - Sandy and Glisan T00568 $250,000.00 Local 08/15/18 Adre, Norberto 503-823-4818 Curb extensions and flashing beacons 02/05/2018 15:02 07/02/2018 11:07
"Fixing Our Streets - Sidewalk Infill 148th Ave: Glisan to Halsey T00596 $750,000 FOS 11/15/18 Joe, Jimi Sidewalk infill, signing, striping, ADA ramps. 07/02/2018 12:07 08/21/2018 15:08
47th Ave: Columbia Blvd-Cornfoot Rd, NE T00539 $4,000,000 - $5,000,000 LID 10/15/18 Blanchard, Nicole 503-823-5474 Grading, Paving, Concrete Flatwork, Concrete Pavement, Drainage, Signing, Striping, Signals, Roadside Development 10/18/2017 16:10 08/21/2018 15:08
Beaverton Hillsdale Hwy: 30th-39th, SW T00570 $375,000 FOS 09/15/18 Roske, Kim Streetscape improvements and ADA ramps. 07/02/2018 12:07 08/21/2018 15:08
Columbia Blvd at MLK Jr. Blvd, NE T00024 $1,500,000 - $2,000,000 Federal 10/15/18 Shepard, Jason 503-823-3776 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 04/04/2016 09:04 08/21/2018 15:08
Fixing Our Streets Paving Denver -Lombard-Watts T00583 $700,000.00 Local 12/15/18 Adre, Norberto 503-823-4818 Paving 02/05/2018 16:02 07/02/2018 12:07
HSIP 2016 Bike/Ped Improvements T00463 $850,000 - $1,000,000 Federal 10/15/18 Bennett, Ruthanne 503-823-3436 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 10/18/2017 12:10 08/21/2018 15:08
Marine Drive Path: 112th Ave-185th Ave Sec., NE T00437 $345,000.00 Federal 10/15/18 Williams, Linda 5038237154 Multiuse bikepath 06/05/2018 13:06 08/21/2018 15:08
St. Johns Truck Strategy, Phase II: T00453 $1,500,000 MTIP, FOS 10/15/18 Newlands, Rich Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 07/02/2018 12:07 08/21/2018 15:08
Taylors Ferry Rockslide Abatement, SW T00508 $250,000 - $500,000 Local 10/15/18 Heinle, Cedar 503-823-7998 Rockslide Abatement 04/04/2016 09:04 03/05/2018 10:03
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Corrosion Control Improvements Project W02190 $tbd Local 11/12/18 Cheek, Michelle 503-823-4790 The project is to design and construct a corrosion control treatment facility at Water Bureau's Lusted Hill Facility. The project includes a new building to house the new corrosion control treatment system, a new utility water pump station, and associated piping and support systems. 03/27/2018 12:03 10/17/2018 10:10
Gilbert Pump Station and Tank Demolition 8WABS0000697 $tbd Local 11/07/18 Robinson, Bryan 503-823-6518 Key milestones of the project are the demolition of the Gilbert Pump Station and Tank, disposal of all debris and restoration of the project site. 03/15/2018 12:03 08/06/2018 16:08
Gresham Conduit No. 2 Trestle Upgrade W02006 $600,000 Local 02/01/19 Collins, Tim 503-823-5033 Work includes replacement of the existing concrete bents to assure they are below the maximum scour depth in no-liquefiable soils, prevent bents from overturning or sliding, seal leaky weld rivets, strap pipes to new support bents, spot weld repair existing damaged portions of the steel water conduit and apply anti-corrosion wax tape. 10/16/2018 16:10 10/16/2018 16:10
N Jantzen West Of Pavilion Water Main Installation W01842 $1,010,000 Local 04/29/19 Mackinnon, David 503-823-7489 To replace transit water main, install new fire hydrants, and replace water services. 09/04/2018 10:09 09/04/2018 10:09
Road 10R MP 28.77 - 31.85 W01874 $1,540,000 Local 03/28/19 Ackerman, Ken 503-823-7613 Rehabilitation and improvements of segment of main road to facilities in Bull Run Watershed. 08/28/2018 15:08 10/16/2018 16:10
Willamette Shoreline Railroad Crossing W01358 $220,000.00 Local 11/05/18 Ross, M. 503-823-7408 Update pedestrian crossing over railroad track including sidewalk, hand railing, signage installation and rail track renovation. 05/01/2018 14:05 09/11/2018 09:09