Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To view current City contract opportunity solicitations and receive notices as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: procure.portlandoregon.gov/bso/

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Balch Creek Trash Rack Retrofit E10583 $1,475,800.00 Local 02/19/20 LastoMirsky, Chris 503-823-5489 Capital maintenance of existing trash racks adjacent to the Lower Macleay trail in Forest Park. These large structures and bays keep the majority of sediment, rock, and floating debris from entering the low pressure storm sewer that conveys Balch Creek from Forest Park (near NW 30th & Thurman) to the Willamette River at Outfall 17. 11/09/2018 09:11 01/08/2019 09:01
Capitol Hwy, Multnh to Texas Sewer Rehab E11049 $435,000.00 Local 11/28/18 Hjorten, Susan 503-823-7098 Rehabilitate/replace small diameter severely deteriorated public sewer, manholes and sewer laterals in SW Capitol Hwy between SW Multnomah Blvd and SW Texas. This work has been removed from the SW Hillsdale Sewer Rehab project E10681. It is being expedited to be completed with PBOT's project T00586. 03/06/2018 15:03 01/08/2019 09:01
CBWTP Dig 9&10 Transfer Pumps REPL E11113 $608,000.00 Local 05/28/19 McKenna, Heather 503-823-6900 Replace existing sludge transfer pumps at CBWTP Digesters 9 and 10 with centrifugal pumps. 09/11/2018 14:09 01/08/2019 09:01
CBWTP DWCL Wear Strip Replacement E11050 $648,229.00 Local 01/30/19 Lawler, Aaron 503-823-2476 This project would replace the chain, sprockets, and wear strips in each of the four DWCLs at CBWTP. 05/07/2018 08:05 01/08/2019 09:01
CBWTP Effluent PS VFD Cooling Project E11051 $751,143.37 Local 02/21/19 Coker, Jenny 503-823-2689 Effluent Pump Station VFD Cooling Improvements 01/08/2019 09:01 01/08/2019 09:01
CBWTP WWCL 5 & 6 Wear Strip Replacement E11047 $372,782.57 Local 01/30/19 Lawler, Aaron 503-823-2476 This project would replace the wear strips in CBWTP WWCLs 5 & 6 from UHMW material to 316 SS, to restore the asset and maximize longevity. 07/02/2018 13:07 01/08/2019 09:01
CBWTP WWCL Structural Rehab E11118 $4,759,463.70 Local 04/02/19 Wilson, Derek 503-823-2499 The goal of this project is to assess the nature and extent of the damage to the tanks and rehabilitate the concrete surface to ensure continued operation and prevent future outages and repairs. 11/09/2018 13:11 01/08/2019 09:01
Cherry Park PS Grinder REPL E11077 $198,690.00 Local 12/14/18 Nguyen, Huong 503-823-2625 To replace an existing failing grinder at Cherry Park PS. 05/07/2018 09:05 01/08/2019 09:01
Columbia Slough Outfall 57 E10918 $4,123,500.00 Local 02/06/19 Young, Henry 503-823-7278 This project will address the implementation of DEQ priority outfall (OF) 57. The goal of this project is to design and construct stormwater facilities that treat runoff from the high traffic public roadways within Outfall Basin 57. 09/11/2018 14:09 01/08/2019 09:01
DTOT Salmon-Taylor Sewer Rehab E10999 $6,691,200.00 Local 03/13/19 Hjorten, Susan 503-823-7098 Downtown-Old Town Salmon-Taylor Sewer Rehab from SW Naito to I-405 01/08/2019 09:01 01/08/2019 09:01
Errol Heights Stormwater LID E10917 $2,332,583.00 Local 05/22/19 Wilson, Brandon 503-823-7786 LID in Errol Heights to improve streets and add stormwater infrastructure. 08/01/2018 11:08 01/08/2019 09:01
Fiber Expansion for Inverness PS E11158 $1,861,000.00 Local 07/01/19 Chadburn, Roland 503-823-2846 This project request will install additional components to make that network more complete and robust. 01/08/2019 09:01 01/08/2019 09:01
Hillsdale Crest RDII E10941 $6,800,000.00 Local 03/26/19 Young, Henry 503-823-7278 This project will address the implementation of sewer improvements to control the DeWitt SSO within the Burlingame Basin. 04/02/2018 10:04 01/08/2019 10:01
Inverness PS 20-inch FM Repairs E10979 $910,000.00 Local 01/31/19 Wood, Kelly 503-823-2657 Repair a 500 foot segment of force main and its abutment supports. Replace existing air and vacuum valves and improve maintenance access to the valves. 08/01/2018 12:08 01/08/2019 10:01
Johnson Cr Oxbow E08406 $335,564.33 Local 02/10/19 Sean, Bistoff, 503-823-7125 Determine improvements needed to increase flood storage and improve habitat at the Johnson creek Oxbow and implement those improvements. 02/14/2017 14:02 01/08/2019 10:01
Joint PBOT SE Mill Sewer Rehab E11142 $1,000,000.00 Local 02/04/19 Zhang, Yang 503-823-7633 Design and Construction of Sewer Main Replacement in SE Mill St 01/08/2019 10:01 01/08/2019 10:01
Ladd's Addition South Recon/GRST E10369 $4,383,100.00 Local 07/08/19 Word, Tressie 503-823-2926 Construct improvements to rehabilitate pipe segments that are in poor condition, upsize pipe segments and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Market, 20th, Division, and 12th. 01/08/2019 10:01 01/08/2019 10:01
Lombard FM Break Repair E11061 $30,715.00 Local 12/14/18 Lawler, Aaron 503-823-2476 Investigation and repair of a leak in the 30-inch Lombard Force Main approximately 250 downstream from Lombard PS. 03/07/2018 10:03 01/08/2019 10:01
Luther Rd. Restoration (FEMA) E10854 $ 1,570,816.00 Local 02/27/19 Lastomirsky, Chris 503-823-5489 Geomorphic & habitat assessment 09/11/2018 15:09 01/08/2019 10:01
N Commercial and N Shaver Sewer Rehab E11092 $357,000.00 Local 02/28/19 Chan, Terence 503-823-7087 Rehabilitate the existing 12" sewer main and laterals 09/11/2018 15:09 01/08/2019 10:01
NE 12th/13th and Humboldt Sewer Rehab E11070 $581,000.00 Local 02/14/19 Chan, Terence 503-823-7087 Replace the existing combined sewer mains and laterals in NE 12th and NE 13th between NE Humboldt and Wygant and upsize the sewer mains to comply with current standard. 05/07/2018 09:05 01/08/2019 10:01
NE 20th and Tillamook Sewer Rehab E11094 $426,000.00 Local 02/15/19 Chan, Terence 503-823-7087 Replace or rehabilitate the existing 8" sewer main and laterals on NE 20th Ave. between NE Tillamook and NE Thompson St. Upsize the sewer main to comply with current standard if necessary. 08/02/2018 08:08 01/08/2019 10:01
NE 29th NE Hancock SW Barbur Sewer Rehab E11120 $1,219,300.00 Local 05/21/19 Chan, Terence 503-823-7087 Sewer rehab for three separate pipe segments 12/03/2018 10:12 01/08/2019 10:01
NE Broadway & 94th PS Upgrade E10783 $2,024,400.00 Local 04/29/19 Nguyen, Huong 503-823-2625 The project is to upgrade the pump station to improve reliability and maintenance. 06/04/2018 09:06 01/08/2019 10:01
NE Cleveland / NE 10th Sewer Rehab E10997 $626,000.00 Local 01/17/19 Boatman, Daniel 503-823-7162 Rehabilitate or replace 445 lf of 10" and 465 lf of 14" combined sewer and all active laterals on NE 10th between NE Fremont and Beech and NE Cleveland between NE Mason and Skidmore respectively. The manholes may be replaced or rehabilitated depending on the conditions. 03/07/2018 10:03 01/08/2019 10:01
NW Northrup Sewer Rehabilitation E11127 $952,886.96 Local 05/22/19 Boatman, Daniel 503-823-7162 Rehab approx 100 ft of 16" VSP along NW Northrup from 21st to 23rd Ave next to street car tracks and hospital buildings. Construct lateral cleanouts and line or burst defective laterals. 12/03/2018 10:12 01/08/2019 10:01
Portsmouth FM Valve Vault Level Mntrng E10735 $327,708.00 Local 02/22/19 Thompson, Clarence II. 503-823-2623 Rehabilitate and downsize the existing combined sewer main. 11/09/2018 15:11 01/08/2019 12:01
Reed College Manhole Rehabilitation E10618 $35,000.00 Local 02/05/19 Chan, Terence 503-823-7087 Investigate and research the options for resolving infiltration problem in manhole ACN310. 09/11/2018 15:09 01/08/2019 12:01
S Portland - Burlingame Sewer Rehab Ph1 E10680 $3,518,266.40 Local 04/01/19 Boatman, Daniel 503-823-7162 Rehabilitate / replace of small diameter severely deteriorated public sewer, some manhole replacement, and some public lateral replacement, in the Hillsdale area of SW Portland. 09/11/2018 15:09 01/08/2019 12:01
Slough Outfall 100 E10689 $2,487,600.00 Local 04/09/19 Leis, Patrick 503-823-7377 This project is for the design and construction of stormwater treatment facilities to treat stormwater runoff from City ROW in outfall basin 100. The basin contains 25 acres of COP ROW. 09/11/2018 15:09 01/08/2019 13:01
SLRT Monitoring Upgrades FY 16 & 17 E10743 $347,000.00 Local 04/10/19 Thompson, Clarence II. 503-823-2623 Scope: Replace the existing SLRT Monitoring Panels at nine locations with new SLRT panels. Add a radar flow sensor at one of the nine locations. Replace existing retaining wall surrounding a SLRT panel at a tenth location. Objective: to modernize HYDRA data collection for the City sewer system in order to prevent CSO events. 03/07/2018 10:03 01/08/2019 13:01
Sunnyside North Recon/Green Street E10367 $6,250,000.00 Local 12/06/18 Wilson, Brandon 503-823-7786 Construct improvements to rehabilitate pipe segments in poor condition, upsize pipe segments and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 37th, Taylor, and 20th. 12/17/2015 14:12 01/08/2019 13:01
SW Capitol Hwy Stormwater Improvements E10939 $10,586,800.00 Local 01/14/19 Gonzalez, Ruben 503-823-0547 BES is partnering with PBOT to address public infrastructure deficiencies along a 1-mile stretch of SW Capitol Highway between Multnomah & Barbur Blvd.'s, and within surrounding stormwater basin areas. Project work will include new roadway cross-sections which seek to integrate traffic, public access, and stormwater management needs, as well as additional stormwater management solutions for several local drainage basins in which drainage & conveyance deficiencies, along with nuisance flooding issues have been identified. 03/06/2018 14:03 01/08/2019 13:01
SW Hamilton Terr Sewer Reconstruction E10951 $231,253.05 Local 02/13/19 Boatman, Daniel 503-823-7162 Reconstruct 158' of 8" sewer mainline via pipe bursting, reconstruct lateral crossing through multiple property lines to conform to standards, abandon an existing, inaccessible lateral, and re-plumbing of property to provide a new lateral. 01/08/2019 13:01 01/08/2019 13:01
SW Woods W of SW 2nd E11124 $210,300.00 Local 05/22/19 Russell, Margaret 503-823-5327 Evaluate, rehabilitate and possibly upsize 145FT of 85yr old VSP combined sewer. 12/03/2018 11:12 01/08/2019 13:01
SW Yamhill/Morrison Phase 3 E11148 $702,000.00 Local 04/30/19 Hjorten, Susan 503-823-7098 CIPP 5 mains and 6 laterals 01/08/2019 13:01 01/08/2019 13:01
TCWTP Disinfection Improvements Phase 1 E11112 $1,137,175.05 Local 08/27/19 McKenna, Heather 503-823-6900 Improve disinfection treatment process at TCWTP. 10/02/2018 13:10 01/08/2019 13:01
TCWTP Headworks Improvements E10582 $57,022,419.00 Local 08/13/19 Coker, Jenny 503-823-2689 The TCWTP Facilities Plan Update is nearly complete and has identified key improvements. These improvements are driven by a need to bring the headworks process up to current treatment and efficiency standards, increase peak flow hydraulic capacity, community needs, and an opportunity to improve the plant hydraulic profile. 12/03/2018 11:12 01/08/2019 13:01
Water Pollution Control Lab Site Work E10902 $3,257,146.00 Local 12/31/18 Raymor, Sharon 503-823-6982 The facility has outgrown the secure fleet parking lot, storage building, main parking lot and accessibility needs to be brought up to the current ADA design standards. 08/02/2018 11:08 01/08/2019 13:01
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
"Fixing Our Streets - Neighborhood Greenways T00632 $500,000.00 FOS 02/15/19 Adre, Norberto 503-823-4818 Grading and paving 01/09/2019 11:01 01/10/2019 09:01
"Fixing Our Streets - Sidewalk Infill 148th Ave: Glisan to Halsey T00596 $750,000 FOS 02/15/19 Joe, Jimi 503-823-7564 Sidewalk infill, signing, striping, ADA ramps. 07/02/2018 12:07 01/09/2019 12:01
47th Ave: Columbia Blvd-Cornfoot Rd, NE T00539 $6,100,000 LID 02/15/19 Blanchard, Nicole 503-823-5474 Grading, Paving, Concrete Flatwork, Concrete Pavement, Drainage, Signing, Striping, Roadside Development 10/18/2017 16:10 01/09/2019 10:01
BH Hwy 30th-39th T00570 $350,000.00 01/09/19 Roske, Kim 503-823-5183 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Roadside Development 01/09/2019 10:01 01/09/2019 10:01
Capitol Hwy: Multnomah to Texas T00586 $2,100,000.00 FOS 02/15/19 Adre, Norberto 503-823-4818 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Roadside Development 01/09/2019 11:01 01/10/2019 09:01
Connected Cully T00460 $1,800,000.00 04/08/19 Roske, Kim 503-823-5183 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Roadside Development 01/08/2019 16:01 01/09/2019 10:01
Downtown I405 Ped Safety T00457 $1,500,000.00 02/15/19 Williams, Linda 503-823-7154 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 01/09/2019 10:01 01/09/2019 12:01
Greeley Multi-Use Path T00696 $1,200,000.00 03/15/19 Roske, Kim 503-823-5183 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Roadside Development 01/09/2019 10:01 01/09/2019 10:01
Guilds Lake Paving 7tres0002211 $500,000.00 01/15/19 Roske, Kim 503-823-5183 Grading and Paving project. 01/08/2019 16:01 01/09/2019 10:01
Hop Greenway T00647 $800,000.00 02/15/19 Roske, Kim 503-823-5183 Grading, Paving, Concrete Flatwork, Concrete Pavement, Drainage, Signing, Striping, Roadside Development 01/09/2019 10:01 01/09/2019 10:01
N Burlington and N Edison T00686 $600,000.00 LID 04/09/19 Joe, Jimi 503-823-7564 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Roadside Development 01/09/2019 11:01 01/09/2019 11:01
N Denver Ave: Lombard to Watts T00583 $1,300,000.00 FOS 01/10/19 Knighton, Tim 503-823-4818 Grading and paving 01/10/2019 09:01 01/10/2019 09:01
NE 27th Ave:LID T00683 $400,000.00 02/15/19 Joe, Jimi 503-823-7564 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Roadside Development 01/09/2019 10:01 01/09/2019 12:01
SE 80th Ave and SE Mill St T00728 $1,600,000.00 LID 03/09/19 Joe, Jimi 503-823-7564 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Roadside Development 01/09/2019 11:01 01/09/2019 11:01
SW 47th Ave - Lauradel - LID T00656 $250,000.00 LID 03/09/19 Joe, Jimi 503-823-7564 Street improvements and stormwater sewers. 01/09/2019 12:01 01/10/2019 09:01