BOP Project Clearinghouse
PTE | Construction | Technology  
 
Project Forecast Calendar: Construction

The following project calendar represents formal City of Portland construction projects expected to be released during the next 3-6 months. While efforts will be made to keep information on this page current, please note that not all City construction projects may be displayed on this page prior to issuing a solicitation and changes may be made to project plans at any time. For project specific questions, call the project contact person listed below.

To view current City contract opportunity solicitations and receive notices as solicitations are issued, please make sure to register as a vendor with the City's online solicitation system at: procure.portlandoregon.gov/bso/

 

From   To 
View 
Click column header to sort by that column
City of Portland - Environmental Services  
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Wheeler WHE-04 E10219 $6,952,000.00 Local 03/23/17 Wilson, Brandon 503-823-7786 Construction of improvements that will relieve street flooding and basement sewer backups in an area generally bound by NE Brazee, NE 7th, NE San Rafael, and the Willamette River. 10/18/2016 14:10 01/25/2017 13:01
SW Alder, Oak and Taylor Sewer Rehabilitation E10888 $1,283,000.00 Local 06/12/17 Terence, Chan, 503-823-7087 Rehabilitate deteriorating sewers in downtown area. Rehabilitate or replace 263 lf of 16" VSP, 272 lf of 12" VSP and 262 lf of 21" VSP sewer main and laterals connected to these mains. 01/31/2017 09:01 02/14/2017 14:02
SE 20th and Oak Sewer Rehabilitation E10766 $665,000.00 Local 05/12/17 Terence, Chan, 503-823-1087 Replace 243 LF of 24" VSP sewer main by open cut excavation. Objective: Replace the deteriorating pipe segments to extend the service life for providing gravity sewer service to the public. Background: This sewer main was constructed in 1901. CCTV inspection shows that there is significant cracking for the stretches in various spots throughout the pipe. It's recommended to replace the pipe segment entirely. 02/14/2017 14:02 02/14/2017 14:02
City-wide 2017 Sewer Rehab E10562 $7,750,000.00 Local 04/21/17 Sterling, Claudia 503-823-4962 The City-wide Sewer Rehabilitation Project will construct public sewer pipe rehabilitation and/or replacement of deteriorated pipe outside of Phase 2 Rehab project geographical project boundaries. 04/04/2016 12:04 10/18/2016 10:10
CBWTP WWCL Skimmers Repl Phase I E10792 $3,100,000.00 Local 03/06/17 Selker, Chris 503-823-2482 The CBWTP has eight wet weather clarifiers (WWCLs) that are used to treat peak storm events. This phase I of the project would replace the eight existing scum skimmers, and restore the spray water functionality over the skimmers. 04/04/2016 12:04 02/14/2017 14:02
Johnson Cr Oxbow E08406 $1,228,722.00 Local 11/22/17 Sean, Bistoff, 503-823-7125 Determine improvements needed to increase flood storage and improve habitat at the Johnson creek Oxbow and implement those improvements. 02/14/2017 14:02 02/14/2017 14:02
Ankeny PS Ventilation Facility Upgrade E10744 $618,000.00 Local 07/19/17 Nguyen, Huong 503-823-2625 Restore the odor treatment facility to reliable operation 10/18/2016 15:10 01/25/2017 13:01
Mt Scott-Arleta Sewer Rehabilitation Project E10678 $2,391,000.00 Local 02/28/17 Margaret, Russell, 503-823-5327 Rehabilitate / replace approximately 5,500 feet (19 manhole-to-manhole segments) of small diameter severely deteriorated public sewer in the Mt Scott and Arleta neighborhoods. Construction will involve cured-in-place lining, pipe bursting and open-cut pipe laying. Some manholes and some service laterals will be replaced based on condition 12/02/2016 11:12 01/25/2017 11:01
Slough Outfall 104b E10625 $2,155,000.00 Local 04/14/17 MacGregor, Fred 503-823-4981 Green Street facilities and filter vaults for the purpose of Stormwater Enhancement in the Columbia Slough Watershed 10/18/2016 15:10 01/25/2017 13:01
Fanno Beaverton Hillsdale Hwy E08675 $570,000.00 Local 03/22/17 Huntington, Lisa 503-823-7205 Construct stormwater treatment facilities to control flow and pollutants flowing into Fanno Creek from the 2.6 mile section of Beaverton-Hillsdale Hwy between SW Sunset and 65th Ave. 11/04/2015 09:11 02/14/2017 14:02
Fremont Pump Station Upgrade E10543 $800,000.00 Local 07/24/17 Hebert, Dan 503-823-2689 Remodel pump station to improve reliability and maintenance. Remodel includes upgrading mechanical, electrical, and controls systems. 12/17/2015 14:12 02/14/2017 14:02
Alder Pump Station Upgrade E10359 $2,800,000.00 Local 03/01/17 Hebert, Dan 503-823-2689 The project is to upgrade the pump station for projected future flows, and to integrate the PS operation into the eastside CSO system operation. 11/04/2015 08:11 02/14/2017 14:02
Richmond-South Tabor E10383 $3,676,000.00 Local 03/17/17 Harold, Colleen 503-823-5227 This project will design and construct public sewer rehabilitation in the Foster-Powell neighborhood. 10/18/2016 14:10 11/14/2016 15:11
Tabor-Powell Phase II E10382 $2,636,000.00 Local 05/18/17 Harold, Colleen 503-823-5227 Construct public sewers in the North Tabor and Mt Tabor neighborhoods. The project involves work in over 40 different City blocks scattered throughout the two neighborhoods...with most of the work occurring within the street. 10/18/2016 14:10 11/14/2016 16:11
CBWTP Biogas Utilization E10033 $6,540,000.00 Local 04/21/17 Han, Vu 503-823-2635 Construct an addition to the existing cogeneration facility to beneficially reuse most of the methane gas that is a bi-product of the treatment process. 11/04/2015 09:11 01/25/2017 13:01
Montavilla North E10385 $2,327,000 Local 10/03/17 Hammond, David 503-823-9686 This project will design and construct public sewer rehabilitation in the Montavilla neighborhood. The project involves work in over 20 different City blocks scattered throughout the three neighborhood...with most of the work occurring within the street. 01/25/2017 13:01 01/25/2017 13:01
CBWTP Digester Improvements E10616 $500,000.00 Local 03/14/17 Gueissaz-Teufel, Muriel 503-823-2498 Improvements to the Digesters at CBWTP. 11/17/2014 14:11 01/25/2017 12:01
Sunnyside East Recon/Green Street E10370 $3,200,000.00 Local 06/10/17 Gonzalez-Baird, Ruben 503-823-0547 Construct improvements to upsize pipe segments, and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 45th, Taylor, and 37th. 11/04/2015 09:11 02/14/2017 14:02
Slabtown Sewer Replacement E10663 $9,600,000.00 Local 06/13/17 Gonzalez-Baird, Ruben 503-823-0547 Increase pipe capacity to address risk of sewer backups to 67 properties in NW Portland in the area between 13th and 21st and Pettygrove and Savier. 11/04/2015 09:11 02/14/2017 14:02
Sunnyside North Recon/Green Street E10367 $6,250,000.00 Local 10/31/17 Gonzalez-Baird, Ruben 503-823-0547 Construct improvements to rehabilitate pipe segments in poor condition, upsize pipe segments and install street, roof and parking stormwater controls to relieve street flooding and basement sewer backups. Located in SE Portland, the project area is generally bound by Stark, 37th, Taylor, and 20th. 12/17/2015 14:12 02/14/2017 14:02
Montavilla South E10386 $2,875,000.00 Local 10/17/17 David, Hammond, 503-823-9686 This project will design and construct public sewer rehabilitation in the Montavilla neighborhood. The project involves work in over 20 different City blocks scattered throughout the three neighborhood...with most of the work occurring within the street. 01/31/2017 09:01 01/31/2017 09:01
N. Argyle and N. Marine Sewer Rehab E10909 $840,000.00 Local 08/21/17 Colleen, Cunningham, 503-823-2664 This project will replace 6 manholes and CIPP line 3 pipe mains that are severely corroded due to direct connections to force mains. 01/31/2017 09:01 02/14/2017 14:02
N Schmeer and N Vancouver Sewer Rehab E10825 $626,000.00 Local 04/26/17 Colleen, Cunningham, 503-823-2664 Replace a severely deteriorated manhole, and CIPP line approximately 360' of severely deteriorated CSP sewer main. The manhole will be replaced with a design that is not as subject to corrosion as standard concrete. 02/14/2017 14:02 02/14/2017 14:02
Tryon Storm Sewer Protection E10251 $1,900,000.00 Local 01/08/18 Cleys, Tammy 503-823-7641 Upgrade the Tryon Creek Sanitary Sewer from the Tryon Creek wastewater treatment plant approximately 1867 feet upstream into Tryon Creek State Park 11/04/2015 08:11 08/15/2016 14:08
NW Industrial St east of 28th Ave E10782 $2,060,000.00 Local 04/28/17 Chan, Terence 503-823-7087 Replace the deteriorating pipe segments to extend the service life for providing gravity sewer service to the public. Background: The sewer mains were constructed in 1924, . Video inspection shows long sections with longitudinal cracks and some ovalling. There is about 100 lf section with no inspection due to a pipe sag that the camera is under water. 01/25/2017 13:01 02/14/2017 14:02
SW 45th Ave Culvert Replacement E08676 $780,000.00 Local 03/10/17 Brenneke, Eric 503-823-7651 Construct a replacement for the 45th Ave culvert on Fanno Creek to increase capacity and provide fish passage. 11/04/2015 09:11 02/14/2017 14:02
Boones Ferry Culvert E08682 $1,925,000.00 Local 09/01/17 Brennecke, Eric 503-823-7651 Retrofit/replace the Boones Ferry Culvert on Tryon Creek to increase capacity and provide fish passage. The project will include channel enhancement work to control the grade of the creek and protect streambanks and will protect an exposed 18-inch sewer line crossing the creek approximately 145 feet upstream of the culvert. 04/04/2016 12:04 02/14/2017 14:02
City of Portland - OMF - BIBS - Facilities
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Replacement of City Fuel Facilities $6,000,000 Local 06/02/17 Sharon, Raymor, 503.823.6982 Replace fueling stations at up to six sites & develop fuel facility at a new site to be acquired. 10/08/2015 11:10 01/27/2016 10:01
Justice Center $760,000 Local 02/11/17 Sharon, Raymor, 503.823.6982 Restroom Renovations 02/11/2016 15:02 02/11/2016 15:02
City Hall Exterior $3,000,000.00 Local 03/27/17 Randi, Selleck, 503.823.5060 Exterior (cleaning, restoration/repair), Roofing, and HVAC 01/27/2016 10:01 01/27/2016 10:01
City of Portland - Parks
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Gateway Green Phase II Construction P10498 $2,300,000.00 SDC 02/01/18 Swanson, Ross 503-823-3577 Design and construct various path and nature play improvements. 03/16/2017 10:03 03/16/2017 10:03
Mt. Tabor Yard Maintenance Facility & Bike/Pedestrian Path Construction Project P30075 & P10472 $4,500,000.00 Bond 11/01/17 Meamber, Susan 503-823-9709 Construct new shop space per 2008 Master Plan. Design and construct bike/pedestrian trail improvements. 03/16/2017 10:03 03/16/2017 10:03
Mt. Scott Community Center Roof Repair Project P00741 $1,250,000.00 Major Maintenance 11/15/17 Meamber, Susan 503-823-9709 Make various repairs to community center roof. 03/16/2017 10:03 03/16/2017 10:03
Couch Park Play Area Renovation and Loo Installation P30001 $1,200,000.00 Bond 01/15/18 Datka, Gary 503-823-5574 Replace play equipment and correct adjacent ADA deficiencies. Add a Portland Loo. 03/16/2017 10:03 03/16/2017 10:03
Halprin Sequence CM/GC P00721 $TBD Local 05/01/17 Burtzos, Sandra 503-823-5594 CM/GC for design and construction of Halprin Sequence Restoration Project. 12/13/2016 09:12 03/16/2017 10:03
City of Portland - Transportation
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Marine Drive Path: 112th-185th Ave, NE T00437 $500,000 to $750,000 Federal 10/16/17 Williams, Linda 503-823-7054 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals 04/01/2016 16:04 02/27/2017 14:02
Columbia Blvd at MLK Jr. Blvd, NE T00024 $1,500,000 - $2,000,000 Federal 06/05/17 Shepard, Jason 503-823-3776 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 04/04/2016 09:04 02/27/2017 14:02
Burgard @ North Time Oil Road Intersection T00386 $1,000,000 to $1,500,000 Federal 03/20/17 Shepard, Jason (503) 823-3776 Grading, Drainage, Paving, Striping, Signing, Illumination, Signals & Roadside Development 02/16/2016 09:02 03/08/2017 15:03
Halsey Streetscape: 103rd-112th, NE T00456 $1,500,000 - $2,000,000 Local 03/20/17 Shepard, Jason 503-823-3776 Grading, Paving, Concrete Flatwork, Signing, Striping, Signals 03/02/2016 08:03 03/08/2017 15:03
Taylors Ferry Rockslide Abatement, SW T00508 $250,000 - $500,000 Local 11/13/17 Heinle, Cedar 503-823-9726 Rockslide Abatement 04/04/2016 09:04 02/27/2017 15:02
Foster Rd: 82nd-91st, SE T00582 $2,500,000 - $3,000,000 Local 03/13/17 Haou, Raphael 503-823-7143 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals 05/31/2016 15:05 02/27/2017 14:02
Front Ave: 9th-19th LID, SW T00619 $1,000,000 - $1,500,000 Local 04/24/17 Haou, Raphael 503-823-7143 Grading, Paving, Concrete Flatwork, Drainage, Signing, Striping, Signals, Roadside Development 02/27/2017 14:02 02/27/2017 14:02
Vermont St: Capitol-Oleson, SW T00588 $1,500,000 - $2,000,000 Local 05/08/17 Adre, Norberto 503-823-4818 Grinding, Paving, Concrete Flatwork, Striping, Signal Loops 02/27/2017 15:02 02/27/2017 15:02
City of Portland - Water Bureau
Project Title/Description WBS Bureau Element Project Estimate Funding Source Est. Project Release Date Contact Person Phone Scope Entry Created Entry Updated
Headworks Septic System Replacement Project W02003 $265,000.00 Local 06/29/17 Seright, Rich 503-823-7532 This project will replace the existing septic system (tank and drain field) at Headworks with a new subsurface sewage disposal system including a pump station, force main and drain field at Kaiser Park. 03/16/2017 10:03 03/16/2017 14:03
Council Crest Tank Roof Replacement W01848 $550,000 Local 01/31/18 Ngai, Stephen 503-823-7968 Replace the Council Crest Tank roof and upper wall shell. 12/11/2015 15:12 03/08/2017 17:03
Greenleaf Pump Station Project W01446 $1,275,000 Local 04/01/17 Larson, Kevin 503-823-7210 Construct a replacement of the Greenleaf pump station at the existing site. The new pump station will pump directly to the distribution system. 09/12/2016 11:09 03/13/2017 13:03
Groundwater Electrical Supply Improvements W01371 $820,000 Local 05/01/17 Easley, Patrick 503-823-7005 Construct the replacement, installation, integration, and testing of the main power transformer at the Groundwater Pumping Station, the main medium-voltage circuit breaker, and other key components. 10/05/2012 10:10 03/16/2017 13:03
Willamette River Crossing W01590 $40,000,000 Local 05/31/17 Collins, Tim 503-823-5033 This is the request for qualification for the Design-Build procurement. 02/15/2017 09:02 03/16/2017 16:03
Road 10H MP 10.95 – 12.56 W01875 $789,000 Local 01/18/18 Bryan, Scott 503-823-7245 This project will grind existing pavement, restore road subgrade, pave, and stripe 1.61 miles of Road 10. The road condition assessment indicates the average width of this road meets the design standard, however isolated widening may be required. Current condition ratings indicate one culvert will be replaced with Aluminum Alloy Pipe. Culvert inspection during design may indicate a need to replace more. 01/04/2017 12:01 03/16/2017 13:03