26.06.070 Electrical Reconnections.
When a building has been vacant and the power has been off for 6 months, the Director shall inspect the building prior to reconnection of power. A reconnection permit fee shall be paid prior to the inspection.
GENERAL INFORMATION: 503-823-4000
EMAIL: cityinfo@portlandoregon.gov