Inner Southeast Portland (SEUL)

1314 NE Grand Ave

Construction - Roof demo from 11/10/16 through 3/31/17

16 Intersections on US 26 (see attached)

Construction - Upgrading Signal Heads between 6/1/16 through 5/31/17

3032 SE Powell Blvd

Construction - Staging Yard for BES Project from 11/14/2016 through 10/14/2017

419 NE 9th Ave

Party with DJ and dancing 2/24

4262 SE Belmont St.

Construction - Roofing for 2 Sundays between 2/12 and 3/4

6035 SE Reed College Pl

Film shoot 1/27 - 1/28

Lower Powell Green Street & Sewer Project

Construction (Revised) - sewer repair and bioswale additions 10/3/15 - 2/27/17

Mt. Tabor

5k / 10k Fun Run 5/14

Mt. Tabor Park

Construction - Mt. Tabor Adjustment Project from 11/3/16 to 4/28/17

Mt. Tabor Park

Tabor Trot and Community Walk 5/27

ROW - from 1205 SE 82nd to 8555 SE 82nd

Construction (Revised) - Remove and replace abandoned driveways from 3/15 through 5/15

ROW - Inner SE Portland

Construction - Installing LED lights on street lights from 2/6 to 12/31

ROW - Intersection of SE 72nd Ave and SE Raymond St.; Intersection of SE Foster Rd and SE 72nd Ave

Construction - Relocate poles for PBOT Street Improvements for up to 1 week between 2/21 and 4/28

ROW - NE 26th Ave between NE Couch and NE Burnside

Construction - Replace transformer for up to 1 week between 2/15 and 4/28

ROW - NE Glisan between I-84 and NE 60th; SE 47th; SE Powell; Holgate; McLoughlin Blvd

Construction - Sewer Repair for 7 nights between 9/7/2017 and 9/21/2018

ROW - NE Grand Ave between E Burnside / NE Couch / Dr. MLK Jr. Blvd

Construction - Installing new storm and sanitary pipes from 1/16 - 2/3

ROW - SE 11th Ave between SE Pine and SE Stark

Construction - Pole and anchor set for up to one week between 12/6/16 and 3/31/17

ROW - SE 18th / SE McLoughlin

Construction - Sewer repair work on SE Interceptor between 5/1/17 and 5/30/18

ROW - SE 50th Ave / SE Ramona / SE Reedway / SE 82nd Ave

Construction - CIPPwork between 6/1/17 and 9/30/18

ROW - SE 52nd Ave between SE Division and SE Ivon

Construction - Moving wire and install service for up to 1 week between 1/30 and 4/28

ROW - SE 6th Ave between SE Ash and SE Pine

Construction - Installating overhead service for up to one week between 12/8/16 and 3/31/17

ROW - SE 7th Ave between SE Morrison and SE Belmont

Construction - Electrical utility work for up to one week between 2/6 and 4/28

ROW - SE 9th between SE Hawthorne and SE Madison

Worst Day of the Year Ride - 2/12

ROW - SE Division St. between SE 14th and SE 15th

Construction - Install service pole for clearance for up to 1 week between 2/13 and 4/28

ROW - SE Oak / SE Stark / SE 9th / SE 10th

Beer tasting event with music 1/28

ROW - SE Powell / SE 28th Ave / SE 28th Place

Construction - Demo sawing, excavation, set concrete between 2/6 and 4/30

ROW - SE Woodward St. between SE 7th and SE 10th Aves

Construction - Replace Poles for up to 1 week between 2/26 and 4/28

SE Powell Sewer Project

Construction - Sewer Repair 12/1/15 - 7/31/17

SE Powell- 47th- 52nd, SE Foster btwn Boise & Cora

Construction - Sewer Repair Work - 12/1/15- 7/31/17

Sellwood Riverfront Park

5k walk / run fundraiser 5/20/17

Various Eastside Locations - see attached

Construction - CIPP 2016 Sewer Repair 9/1/16 - 10/31/17

Various Orange Line MAX station platforms in SE Portland

Mural Painting and Installation of Transit Shelters from 7/13/16 through 8/31/17