Skip to Main Content View Text-Only

The City of Portland, Oregon

Portland Parks & Recreation

Healthy Parks, Healthy Portland

Phone: 503-823-7529

1120 SW Fifth Avenue, Portland, OR 97204

More Contact Info

Project List

Argay Park – NE 141st Ave & Failing
Installed a new drinking fountain near the dog off-leash area, and three new park benches.

Cherry Park – SE 110th Ave & Stephens
Installed a soft-surface path and two new park benches.

East Portland Community Center & Pool – 740 SE 106th Ave
Built a new playground featuring play equipment for children age 2-12: a six-seat swing, synchro-spinners, a climbing wall, and spring toys which are fully fenced in for safety.

East Holladay Park – 12999 NE Holladay
Built a new soft-surface playground featuring play equipment for children age 2-12: a giant ladybug climbing shell, slide, a six-seat swing and infant swings, climbing structures, and a jungle gym.

Ed Benedict Park – SE 100th Ave & Powell Blvd
Installed a new, 40-plot community garden (SE 104th & Bush), plus a new drinking fountain near the skate park plaza.

Glenfair Park – NE 154th Ave & Davis
Installed a soft-surface trail and two new park benches, plus picnic tables with concrete pads near the adjacent ballfield.

Gilbert Primary Park – SE 134th Ave & Foster Rd
Installed trail distance markers on a new ½-mile soft-surface trail and new benches, and resurfaced the playground.

Lynchwood Park – SE 170th Ave & Haig
Installed soft-surface walking and jogging paths, a fenced dog off-leash area, park benches, and a drinking fountain.

Midland Park – SE 122nd & Morrison
Installed additional lighting, replaced benches, and added plants known to attract birds and butterflies.

Parklane Park – SE 155th & Main
Installed new picnic tables and benches, two drinking fountains, playground, and concrete pathway.

Ventura Park – SE 115th & Stark
In partnership with the NW Trail Alliance, installed a pair of circular off-road bicycle tracks (pump tracks), as well as gravel pathways, kiosk signage, and additional plantings.

West Powellhurst Park – SE 115th & Division
Installed four new park benches and improved the surface of the walking/jogging path to make the trail ADA-accessible.