Downtown Traffic Impacts

Last Update: Feb 27th,  2017

 Downtown Construction Projects

The following projects are permitted long term use of the street and sidewalk to facilitate construction on private property. 

  • NW Irving, 6th, Hoyt: New construction on east half of block.  Sidewalk and parking closures, intermittent street closures on NW Hoyt. Project contact is JE Dunn Construction, projected completion December 2018. 
  • NW 4th, Burnside, 5th: Remodel and new hotel construction on 1/2 block site.  Sidewalks and parking removed, intermittent lane closures on NW 4th for concrete and crane work. Projected completion May 2017.  Howard S Wright Constructors, Jamey Shaw at 503-220-0895.
  • SW 4th & Stark: interior building demolition. Project closes sidewalks on east side of SW 4th between Stark - Washington and south side of SW Stark between 3rd - 4th, as well as the turn lane on SW Stark.
  • SW 6th, Harrison, Broadway, Montgomery: PSU building remodel and addition, sidewalks and parking fenced.  Intermittent street closures on SW Montgomery.  Project contact is Skanska USA Building at 503-382-0900..
  • NW 11th & Hoyt: 1/4 block project, demo and new construction.  Projected completion October 2017.  Howard S Wright, Todd Smith, 503-220-0895.
  • SW 14th, 15th, Yamhill and Taylor St: Interior remodel.  Project closes sidewalks and park on the East side of 15th between Taylor-Yamhill and south side of Yamhill 14th-15th.  Intermittent lane closures. Projected project completion July 2016.  contact Eric Newby 503.459.4477.
  • NW Couch, 9th, Davis: 1/2 block demo and new construction.  Sidewalks and parking closed, intermittent lane closures for concrete pours and utility connections.  Projected completion July 2017.  Walsh Construction, Nick Leeding at 503-222-4375.
  • NW Davis, 1st, Couch, Naito: Demo of existing parking lot and new construction on 3/4 of the block.  Sidewalks closed around site perimeter and Intermittent lane closures.   Contact is Tom Hammons at Andersen Construction, 503-283-6712.
  • SW Jefferson, 2nd, Columbia: New construction on a half-block site.  Sidewalk and parking removal adjacent to site, intermittent lane closures on SW Jefferson and SW 2nd during utility work and concrete pours.   . 
  • NW 13th, 14th Quimby, Pettygrove: Closes traffic lanes, bike lanes and sidewalks during construction at 1420 NW 14th
  • SW Jefferson, 11th, & 12th: Demo of existing building and new construction of 15-story apartment building.  Sidewalk and parking on three sides, lane closures on Jefferson and 12th.   
  • SW Moody, Abernethy, Bond:  Project completion 2016. All Hours. Lanes and sidewalks. Fenced job site.
  • SW Taylor, 15th-16th, Sidewalk closure & intermittent lane and street closures, Fenced job site.
  • SW Washington, 4-5 and SW 4th, Alder-Washington: 2016 completetion, All Hours, Remodel of building.
  • SW 15th and SW Morrison: New construction, sidewalk and parking closed adjacent to site, intermittent lane closure on SW 15th
  • SW Curry, River Pkwy, Bond, & Whitaker: New construction, sidewalk, parking, and lanes closed adjacent to site at 3410 & 3485 SW Bond Ave
  • NW Flanders, 9th, Everett, Park: New construction on 3/4 block site.  Parking and sidewalk closures, intermittent lane and street closures for concrete pours and crane lifts.
  • SW Columbia, Broadway, and Clay: New construction of 20-story tower.  Parking, sidewalk, and travel lane closures.  Projected completion date late summer 2018. Project contact: Howard S Wright Construction, 503-220-0895. 
  • NW 9th & Glisan: New construction of 11-story hotel.  Parking, sidewalk, and intermittent travel lane closures.  Projected completion date March 2018.  Project contact: Bremik Construction, 503-688-1000.
  • SW 12th & Morrison: New construction. 1/4 block.  Sidewalk and intermittent travel lane closures on SW 12th, no closures on SW Morrison.  Project contact: Turner Construction, 503-226-9825. 
  • NW 13th, Johnson, 12th, Kearney: New construction, full block.  Parking, sidewalk, and intermittent lane closures.  Contact is Andersen Construction, 503-841-6473.

 Utility Work, Crane Lifts, & Other Use Resulting in Lane or Street Closures

The following streets are expected to have impacts from private construction, utility work, crane lifts:  

  • SW 1st, Madison-Main: Feb 13th-Mar 3rd, Two east side lane closures, 8pm-6am, M-F (Sewer work by Moore Excavation)
  • SW 1st, Morrison-Yamhill: May 4th-9th, Street closure, 7am-5pm, All Days (Track repair by Stacy & Witbeck)
  • SW 2nd, Columbia-Jefferson: Feb 6th-May 6th, West side lane closure, 6am-4pm, M-S, (Const. by Skanska)
  • SW 2nd, Columbia-Jefferson: May 26th-May 28th, Street closure, Fri 7pm 5/26 to Sun Midnight 5/28 (Crane lift by Cascade Tower & Rigging)
  • SW 2nd, Taylor-Yamhill: Mar 2nd-10th, East side lane & sidewalk closure, Lane=7am-3pm, sidewalk=7am-6pm, M-F (Utility work by McKillip Excavation)
  • SW 3rd, Taylor-Yamhill: Feb 21st-27th, East side lane closure, 9am-3pm, M-F (Utility work by PGE)
  • NW 9th, Couch-Davis: Feb 7th-April 24th, West side lane closure, 9am-3pm, M-F (Excavation by Walsh Const.)
  • SW 9th, Taylor-Yamhill: Mar 1st-6th, 6am-4pm, street closure for concrete pour at Guild Theater. (Hoffman Construction)
  • SW 10th, Clay-Market: Apr 30th-May 13th, Street closure, All Hours/Days (Portland Streetcar turn back during construction by Trimet)
  • SW 10th, Alder-Washington: Feb 22nd-Mar 3rd, West side lane closure, 9am-3pm, M-S (Utility work by Standard Utility)
  • SW Market, 10th-11th: Apr 30th-May 13th, North side lane closure, All Hours/Days (Portland Streetcar turn back during construction by Trimet)
  • SW 11th, Morrison-Yamhill: Apr 30th-May 20th, Street & East side sidewalk closure, All Hours/Days (Track repair by Stacy & Witbeck)
  • SW 11th, Stark-Washington: Feb 22nd-Mar 3rd, Center lane closure, 9am-3pm, M-S (Utility work by Standard Utility)
  • NW 12th, Johnson-Kearney: Mar 1st-3rd & Mar 14th-16th, Street closure, 7am-4pm, W-F (Const. by Andersen Const.)
  • NW 12th, Johnson-Kearney: Feb 27th-Mar 1st, West side lane closure, 7am-4pm, Wed-Fri (Utility work by NWN)
  • NW 12th, Pettygrove-Quimby: Feb 27th, Street closure, 8am-3pm, Mon (Utility work by Loy Clark)
  • SW 12th, Stark-Washington: Mar 1st-10th, Both sides alternating lane closure, 9am-4pm, M-S (Utility work by Standard Utility)
  • SW 12th, Clay-Market: Feb 22nd-May 23rd, East side lane & sidewalk closure, All Hours/Days (New const. by Mortenson Const.)
  • SW 12th, Clay-Market: Mar 4th, Street closure, 7am-7pm Sat (Crane lift by Cascade Tower & Rigging)
  • SW 12th, Clay-Market: Mar 18th, Street closure, 12am-12pm, Sat (Crane lift by Cascade Tower & Rigging)
  • NW 12th, Quimby-Pettygrove: Feb 22nd-Mar 21st, 7am-4pm, M-F (Utility work by Loy Clark)
  • NW 13th, Johnson-Kearney: Feb 20th-Mar 19th, Street closure, All Hours/Days (Construction by Andersen Const.)
  • NW 14th, Flanders-Glisan: Feb 20th-24th, West side lane & sidewalk closure, 8pm-6am, M-F (Utility work by Moore Exc.)
  • NW 15th, Flanders-Glisan: Feb 20th-24th, East side lane & sidewalk closure, 8pm-6am, M-F (Utility work by Moore Exc.)
  • SW Alder, 1st-2nd: May 13th-15th, Street closure, Sat 5am-Mon 5am (Track repair by Stacy & Witbeck)
  • SW Alder, 9th-Broadway: Feb 20th-March 1st, intermittent lane closures, 9am-3pm, M-F (Utility work by C-2 Utility)
  • SW Broadway, Alder-Morrison: Feb 20th-Mar 1st, East side lane closure, 9am-3pm, M-F (Utility work by C-2 Utility)
  • SW Broadway, Alder-Morrison: Mar 2nd-7th, East side lane closure, 9am-3pm, M-F, (Utility work by NorthStar Electrical Contractors)
  • SW Broadway, Alder-Washington: Feb 27th-28th, East side lane closure, 9am-3pm, Mon-Tue (Utility work by NorthStar Electrical Contractors)
  • SW Broadway, Morrison-Yamhill: Jan 30th-April 30th, East side lane closure, 9am-3pm, Mon-Sat (Construction by Howard S Wright)
  • SW Clay, 14th-17th: Mar 2nd-May 26th, North side lane closure, 8am-3pm, M-F (Utility work by PGE)
  • SW Clay, Broadway-Park, Feb 27th-Mar 17th, Alternately close both sides traffic lanes, 8am-3pm, M-F (Const. by Howard S. Wright)
  • NW Couch, 9th-10th: Feb 6th-24th, North side lane closure, 9am-3pm, M-S (Pile driving by Walsh Const.)
  • NW Front, 15th-17th: Feb 16th-May 17th, West side lane closure, All Hours/Days (Const. by Lease Crutcher Lewis)
  • NW Glisan, 8th-Park: Feb 20th-Mar 10th, Alternately close North & South side traffic lanes, 8pm-6am, M-F, (Utility work by C-2 Utility)
  • NW Glisan, 14th-15th: Feb 20th-24th, South side lane & sidewalk closure, 8pm-6am, M-F (Utility work by Moore Exc.)
  • SW Harrison, 6th-Broadway: Feb 22nd-Mar 7th, North side lane closure, 9am-3pm, All Days (Exterior building work by Skanska)
  • NW Hoyt, 9th-Park: Mar 13th-24th, South side lane closure, 8am-5pm, M-F (Utility work by C-2 Utility)
  • SW Jefferson, 2nd-3rd: Feb 6th-May 6th, South side lane & sidewalk closure, All Hours/Days (Excavation/new const. by Skanska)
  • SW Jefferson, 2nd-3rd: May 26th-May 28th, Street closure, Fri 7pm 5/26 to Sun Midnight 5/28 (Crane lift by Cascade Tower & Rigging)
  • NW Johnson, 12th-13th: Feb 9th-Mar 31st, North side lane closure, 9am-3pm, M-F (Const. by Andersen Const.)
  • NW Kearney, 12th-13th: Dec 31st - Mar 3rd, Intermittent south side lane closure, 9am-3pm,M-F (Const. by Andersen Const.)
  • SW Madison, 2nd-Naito Pkwy: Mar 6th-17th, Street closure, Various hours for night time work, M-F (Sewer work by Moore Excavation)
  • SW Morrison, 1st-2nd: May 9th-16th, Street closure, All Hours/Days (Track repair by Stacy & Witbeck)
  • SW Morrison, 9th-10th: March 1st, 8am-4pm, street closure for tree work (NW Tree Specialists)
  • SW Morrison, 10th-12th: Apr 30th-May 20th, Street closure & South side sidewalk closure, All Hours/Days (Track repair by Stacy & Witbeck)
  • NW Park, Glisan-Hoyt: Feb 27th-Mar 10th, East side lane closure, 8pm-6am, M-F (Utility work by C-2 Utility)
  • SW Park, Alder-Washington: Feb 16th-May 17th, East side lane & west side sidewalk closures, All Hours/Days (Construction by LCG Pence)
  • NW Pettygrove, 13th-14th: Street closure, Noon Wed. 3/1/17 to 6pm Fri 3/3/17 (Tower crane dismantle by Campbell Crane)
  • SW Taylor, 3rd-4th: Feb 27th-Mar 3rd, South side lane closure, 7am-3pm, M-F (Utility work by PGE)
  • SW Taylor, 15th-16th: Jan 6th-April 6th, North side lane closure, 7am-5pm, M-S (Demo by Skanska)
  • SW Washington, 10th-11th, Feb 22nd-Mar 3rd, North side lane closure, 9am-3pm, M-S (Utility work by Standard Utility)
  • SW Washington, 11th-12th, Feb 22nd-Mar 3rd, North side lane closure, 9am-3pm, M-S (Utility work by Standard Utility)
  • SW Washington, 11th-12th, Mar 1st-10th, South side lane closure, 9am-4pm, M-S (Utility work by Standard Utility)
  • SW Yamhill, 10th-12th, Apr 30th-May 20th, North side lane & sidewalk closure, All Hours/Days (Track repair by Stacy & Witbeck)
  •  
  • Multnomah County Bridges - Use link for bridge closures & updates
  • Portland5's Centers for the Arts

Arlene Schnitzer Concert Hall & Keller Auditorium School Buses for Performances

  • Schnitzer: Nothing scheduled 
  • Keller: Nothing scheduled

SW Main Street (gates), SW Broadway to Park: closures for performances & events

 

Click here for Community Event Calendar

Click here for Citywide fairs and events

Click here for Special Events such as runs, parades & other moving events 

To receive automated notices about large special events that will have traffic impacts, simply use the Portland "subscribe" option and subscribe to Transportation.

 

The above information from the Portland Bureau of Transportation on expected traffic conditions was prepared based on known construction traffic control plans at the time of writing. The information is subject to change as new information becomes available.