Skip to Main Content View Text-Only

Portland Bureau of Transportation

Phone: 503-823-5185

Fax: 503-823-7576

1120 SW Fifth Ave, Suite 800, Portland, OR 97204

More Contact Info

Right-of-Way Use Enforcement Program

ROW Enforcement Program

 

The enforcement program plays a critical role in providing safe mobility options to Portlanders.

 

Why do we need an enforcement program?

With increasing community uses and construction work occurring in the public right-of-way (ROW), there has been a rise in businesses, contractors or individuals disregarding permit conditions or proceeding with work without a valid permit. This can result in unsafe conditions or failure to accommodate the traveling public. In addition to enhanced coordination efforts such as Get Portland Moving, PBOT aims to increase compliance through consistent enforcement of permit conditions.

What is the program objective?

Promote compliance and enhance public safety through enforcement actions for violations related to temporary traffic control, community street use, encroachments, and street openings.

How will enforcement actions be determined?

Violations are determined based on whether or not a valid permit has been obtained as well as the degree of deviation from requirements, level of threat to public safety and amount of delay to travel. Failure to accommodate the traveling public or failure to meet minimum safety standards is a Class I violation, while encroachment violations that do not create an immediate safety risk are a Class III violation.

How will enforcement actions be taken?

PBOT inspectors and engineers are responsible for enforcement action documentation and notification. Enforcement action may be based on formal complaints, discovery while in the field or reports submitted through pdxreporter.org. The PBOT Enforcement Program Manager will maintain external communication and reporting on enforcement activity.

When will the new program go into effect?

The new program will be effective January 1, 2018. The fee schedule reflects current penalty amounts that are subject to assessment, Schedule G, ROW Use Enforcement Penalties, adopted June 2017 (updated annually).

Does this change City Code?

As part of this program, the existing reference to civil penalties in Title 17.100.050 will be replaced with a reference to the Annual Fee Schedule. Title 17.23.050 will be revised to require impacted street areas to be reopened as determined by the City Traffic Engineer.  Administrative Rules 2.08, 8.08, 8.12, 10.03, 10.06, and 10.19 will add reference to the umbrella ROW Use Enforcement Program.

 

View and/or download a printable flyer about this program here.

ADDITIONAL QUESTIONS? Contact:

Caitlin Reff - caitlin.reff@portlandoregon.gov - 503-823-7788

Penalty Schedule: https://www.portlandoregon.gov/citycode/article/647184