Project Materials & Resources
Project Materials & Resources
Project Background Documents & Existing Conditions
- Plan Development Process (PDF doc, 64kb, 8/11/2010)
- DRAFT Project Goals & Design Objectives (PDF doc, 85kb, 8/11/2010)
- Route Intersection Inventory (PDF doc, 454kb, 8/11/2010)
- Existing Conditions Report (PDF doc, 3,720kb, 7/30/2010)
- Existing Conditions Summary (PDF doc, 110kb, 8/25/2010)
- Existing Conditions Map: Draft Route Alignment per the Portland Bicycle Plan & Existing Conditions Information (PDF doc, 1,546kb, 8/11/2010)
Citizen Advisory Committee Meeting Notes
- CAC Meeting #1 Agenda & Meeting Summary, August 11, 2010 (PDF doc, 130kb, 8/25/2010)
- CAC Meeting #2 Agenda & Meeting Summary, September 29, 2010 (PDF doc, 154kb, 10/13/2010)
- CAC Group Bicycle Ride Summary, October 16, 2010 (PDF doc, 107kb, 11/15/2010)
- CAC Meeting #3, November 15, 2010 (PDF doc, 107kb, 11/15/2010)
- CAC Meeting #4 Agenda and Meeting Summary, February 22, 2011 (PDF doc, 125kb, 3/15/2011)
- CAC Meeting #5 Agenda and Meeting Summary, May 24, 2011 (PDF doc, 252kb, 7/6/2011)
Design Development and Evaluation
- Presentation slides: Bikeway Design Toolbox (PDF doc, 2,952kb, 8/11/2010)
- Bikeway Facility Design: Survey of Best Practices (PDF doc, 2,938kb, 8/11/2010)
- Design Options Matrix (PDF doc, 1,684kb, 9/28/2010)
- Alignment Alternatives Summary Table (PDF doc, 81kb, 9/28/2010)
- Presentation slides: Overview of DRAFT intersection design options (PDF doc, 1,862kb, 10/13/2010)
- DRAFT Project Concept presentation (PDF doc, 3,336kb, 11/15/2010)
- DRAFT Project Proposal Map (PDF doc, 179kb, 11/15/2010)
- 5/24/2011 meeting handouts/attachments, including: A. Final Draft CAC Recommendation, B. Interim Bike Box Criteria, C. Proposed northern bike network connection, D. Proposed NE 57th Ave crossing treatment, E. Proposed SE Woodward/ 52nd Ave crossing improvements (connection to Clinton/Woodward Bikeway), F. Proposed SE Woodstock/ 57th crossing improvements (as part of the ‘Neighborhood Route’), and G. Proposed project implementation phasing schedule.
Parking
- Parking Utilization Data - August 2010: (PDF doc, 81kb, 8/7/2010)
- Parking Utilization Data - Combined August & October 2010: (PDF doc, 60kb, 11/15/2010)
Proposed Traffic Diversion Meetings and Materials
>> NE 53rd between E Burnside to NE Glisan Street
- Diversion/traffic calming conversation with neighborhood: Tuesday, April 26, 2011 Meeting Summary (PDF doc, 110kb, 5/3/2011)
- Presentation slides (PDF doc, 3,676kb, updated 4/27/2011)
>> SE 52nd Avenue between SE Division to SE Lincoln Street
- Diversion/traffic calming conversations with neighborhood: Meeting Summary from Thursday, May 5, 2011 mtg (PDF doc, 151kb, updated 5/16/2011) and Meeting Summary from Wednesday, June 8, 2011 mtg (PDF doc, 98kb, updated 7/1/2011)
- Presentation slides (PDF doc, 3,880kb, updated 5/6/2011)
- Summary of proposed improvements: 52nd Ave/ Division (PDF doc, 140kb, updated 5/16/2011)
- Area traffic and speed data collection results (Excel file, 407kb, updated 6/9/2011)
Open House Information
- Public Open House event, January 26, 2011 - find materials in virtual open house here.
- 50s Bikeway Open House #1 Summary Report (PDF doc, 788kb, 2/15/2011)
- Public Open House 2 event, June 29, 2011 - find materials in virtual open house here.
- 50's Bikeway Open House #2 Summary Report (PDF doc, 741kb, 7/25/2011)
City Project Links:
The Portland Bicycle Master Plan - Portland Bureau of Transportation is updating the Bicycle Master Plan. The project is moving forward with guidance from a Steering Committee and a Technical Advisory committee. It is expected to be completed in the fall of 2009.
The Portland Plan - The Portland Plan is an inclusive, citywide effort to guide the physical, economic, social, cultural and environmental development of Portland over the next 30 years.