P-250 through P-299 Cleanouts, Risers, Inside Drops
*Table Updated 10-16-2020
Current Version |
Description |
Effective Date |
Prior Version |
P-250 | PVC Deep Connection Riser | 07-12-16 | |
P-251 | Clay Pipe Connections for Concrete Maintenance Hole | 07-15-20 | |
P-252 | Piped Inside Drop Connection with Tee | 01-01-09 | |
P-253 | Piped Inside Drop Connection with Drop Bowl | 01-01-09 | |
P-256 | Rain Drain to Gutter | 07-31-20 | P-256 |
P-257 | Sanitary Sewer Lateral Cleanout | 06-22-12 | |
P-258 | Sanitary Sewer Terminal Cleanout | 06-22-12 | |
P-259 | Sanitary Cleanout Frame Foundation | 06-22-12 | |
P-260 | Sanitary Cleanout Frame and Cover | 01-01-09 | |
P-261 | Sanitary Cleanout Frame & Cover Landscape | 01-01-09 | |
P-262 | Sewer Service Lateral - Sanitary | 04-20-10 | |
P-263 | Sanitary Sewer Cleanout Over Existing Lateral | 03-24-14 |