Skip to Main Content View Text-Only

Portland Water Bureau

From forest to faucet, we deliver the best drinking water in the world.

GENERAL INFORMATION: 503-823-7404

MAILING ADDRESS: 1120 SW Fifth Ave, Suite 600, Portland, OR 97204

More Contact Info

LT2 (Long Term 2 Enhanced Surface Water Treatment Rule)

  • The Portland Water Bureau's compliance with the requirements of LT2 The Bull Run source remains in compliance with all regulations

An Introduction to LT2

The Long Term 2 Enhanced Surface Water Treatment Rule (LT2) was promulgated by the federal Environmental Protection Agency (EPA) to “reduce illness linked with the contaminant Cryptosporidium and other disease-causing microorganisms in drinking water.”

There are two major requirements of the LT2 rule that apply to Portland’s drinking water system:

  • Provide additional Bull Run source water treatment to specifically address Cryptosporidium – the Portland Water Bureau does not currently treat for Cryptosporidium; the State of Oregon issued Portland a variance for the source water treatment requirements of LT2 in accordance with federal and state law. On May 19, 2017 the State of Oregon sent an order revoking the variance and requiring a compliance schedule for Cryptosporidium treatment.  

 


Uncovered Reservoirs

Portland's strategy for compliance with the uncovered finished drinking water reservoir requirements of LT2.

History of Portland's Legal Challenge

Description and documentation legal challenge to LT2.

Documents & Correspondence

This page contains documents and correspondence regarding compliance with LT2.