Appeal 32380
Appeal Summary
Status: Decision Rendered
Appeal ID: 32380
Submission Date: 6/27/24 1:17 PM
Hearing Date: 7/10/24
Case #: B-001
Appeal Type: Building
Project Type: commercial
Building/Business Name:
Appeal Involves: Erection of a new structure,other: Demolition
Proposed use: Multi-Family Affordable Housing
Project Address: 8050 SW CAPITOL HILL RD
Appellant Name: Spencer Deinard
LUR or Permit Application #: Permit 24-027015
Stories: 4 Occupancy: R-2 Construction Type: V-A
Fire Sprinklers: Yes - Throughout
Plans Examiner/Inspector:
Plan Submitted Option: pdf [File 1]
Payment Option: electronic
Appeal Information Sheet
Appeal item 1
| Code Section | PCC 24.55.205.B.2 |
|---|---|
| Requires | PCC 24.55.205.B.2 B. Documentation Required. A permit to demolish a structure within the scope of this Section as defined in Subsection A. above will not be issued until the Bureau of Development Services (BDS) has received all of the following: |
| Code Modification or Alternate Requested | Issuance of commercial and residential demolition permits prior to the closeout documents being submitted. |
| Proposed Design | Alternative: No work will be performed on individual structures until the closeout documents have been received by BDS and a #200 inspection has been requested and approved for individual building(s) at 8050 SW Capitol Hill Road. |
| Reason for alternative | This is an Affordable Housing Project, and due to its financial funding process, the Project must have Commercial Building Permits in hand prior to receiving Project Funding. As such, the demolition of the Single-Family Residence and associate Garage, including hazardous materials abatement, cannot occur until the Project Building Permits are released. All DEQ and lead & asbestos requirements will be completed prior to new work being started in any given area. In addition, the back-fill of Single-Family residence Garage as well as the existing commercial structure on-site (Barbur Rentals) will be coordinated with grading for the new structures. |
Appeal Decision
"Issuance of commercial and residential demolition permits before the submittal of the closeout documents: Granted provided no demolition work commences until a revision permit has been approved to verify compliance with PCC 24.55.205.B.1&2. All demolition work is subject to (demolition) permit inspections as outlined in PCC 24.55.205.D.1-3 and Demolition Administrative Rules. Failure to complete demolition permit inspections in compliance with code and rules will result in enforcement as outlined in Demolition Administrative Rule Section VIII."
"The Administrative Appeal Board finds that the information submitted by the appellant demonstrates that the approved modifications or alternate methods are consistent with the intent of the code; do not lessen health, safety, accessibility, life, fire safety or structural requirements; and that special conditions unique to this project make strict application of those code sections impractical.
Pursuant to City Code Chapter 24.10, you may appeal this decision to the Building Code Board of Appeal within 90 calendar days of the date this decision is published. For information on the appeals process, go to www.portlandoregon.gov/bds/appealsinfo, call (503) 823-6251 or come to the Development Services Center."