Appeal 34914
Appeal Summary
Status: Decision Rendered - Big Board Appeal
Appeal ID: 34914
Submission Date: 7/24/25 10:25 AM
Hearing Date: 7/24/25
Case #: Big Board
Appeal Type: Building
Project Type: commercial
Building/Business Name:
Appeal Involves: Alteration of an existing structure,Reconsideration of appeal,other: BIG BOARD APPEAL
Proposed use: 5 Residential Units
Project Address: 5500 SE Belmont Street
Appellant Name: Jamey Reeder
LUR or Permit Application #: Preliminary
Stories: 2 Occupancy: R-3 Construction Type: III-B
Fire Sprinklers: No
Plans Examiner/Inspector: Steven Freeh, Greg Wilken
Plan Submitted Option: mail [File 1]
Payment Option: person
Appeal Information Sheet
Appeal item 1
| Code Section | Portland Title 24 section 24.85 Seismic Design Requirements for Existing Buildings |
|---|---|
| Requires | Portland City Code 24.85.040 Change of Occupancy or Use |
| Code Modification or Alternate Requested | The intent of this appeal is to allow change of occupancy without triggering a full seismic upgrade to the entire building. This appeal requests that this building be approved for a change of occupancy of the entire 1st and 2nd floor from a R-3 baseline occupancy (hazard 1) (#01-140127-CO) to a R-2 occupancy (hazard 4). There are no changes to the basement occupancies. |
| Proposed Design | The 5500 SE Belmont building is a 2-story commercial building (w/additional basement), III-B (unreinforced masonry and heavy timber construction), non-sprinklered , RM-1 zoning (w/historical overlay), with a baseline occupancy of R-3 (live/work unit), B and S-1 occupancy (#01-140127-CO), and a total building area of roughly 9,882 s.f.. The building was constructed in 1914 for the Pacific Telephone & Telegraph Company. In 1953 they sold the building, and it was converted to the Mt. Tabor Mason’s Lodge. In 1973 the basement was rented to the Mount Hood Model Engineers (club w/viewing days to the public). Tim and Patty Merrill bought the building in 1996 for use as their personal residence and for occupancy of the Merrill architectural firm - Live/work unit. (#01-140127-CO) R-3 occupancy (Based on 2022 Oregon Structural Specialty Code a live/work unit would be considered a R-2 occupancy per this latest code), B - through an appeal (Model Engineers Club – basement = 1,590 s.f.) and S-1 (remaining basement area). The building owner, Todd Moore purchased the building with the listing stating - one main living unit on the entire top floor, two residential units and one small office on the main floor (1st) which assumed a R-2 occupancy with being over 2-units. The discovery through looking at public records have found that it was never permitted for a R-2 occupancy. We are hopeful that the board will understand and appreciate the dilemma that the owner is in. The building owner is proposing these future modifications to accommodate the safety concerns and chart a path that meets the community safety objectives while making it feasible to make improvements happen to the building. It would not be economically feasible to upgrade the entire building seismically. (see attached supplemental Crux architectural drawings) |
| Reason for alternative | Our understanding of the Portland seismic code requirements and its application is that the code language was initiated to encourage seismic upgrade of buildings when the owner is looking to make improvements. This approach marries the economic concerns with the safety concerns and charts a path that meets the community safety objectives and owners economic viability A. Improved safety of building, based on life and risk. For a building of this size with 2 stories, the proposed full NFPA 13 sprinkler system, proposed fire alarm system , and the proposed seismic upgrades (out-of-plane ties, reduction of parapet, removal of the chimney, new structural plywood sheathing and roof framing) we believe will drastically improve the safety, based on life and risk of the building and its occupants. B. Decrease in total occupants based on the history of the building and baseline (#01-140127-CO): (1914) The Pacific Telephone & Telegraph Company (44 total occupants), (1953) Masonic Lodge (246 total occupants), (2001 Baseline) Merril Residence and Merrill Architecture office (111 total occupants). The proposed 5-units for the Moore Residence (49 total occupants) is a 44% decrease of total occupants from the baseline (111 total occupants). C. 2022 Oregon Structural Specialty Code Chapter 34 – Existing Buildings 3405.6 change of occupancy – 3405.6.1 Subject to the approval of the building official, changes of occupancy shall be permitted without complying with all of the requirements of this code for the new occupancy, provided that the new occupancy is not more hazardous, based on life and risk, than the existing occupancy. We believe that the new is not more hazardous, based on life and risk based on reduction of total occupants and reduction of means of egress travel distance out of the building. D. Means of Egress (travel distance from each floor of the building) Basement: Per baseline (9-18-02 #02-140127-CO) greatest travel distance for egress – 78’-3”, proposed greatest travel distance for egress – 68’-9’ (reduction of 9%) 1st floor: Per baseline (9-18-02 #02-140127-CO) greatest travel distance for egress – 46’-6”, proposed greatest travel distance for egress – 39’-9’ (reduction of 8%) E. Additional housing units We are hopeful that the board will understand and appreciate the dilemma that the owner is in and grant this appeal based on proposed improvements to the building. |
Appeal Decision
The Building Code Board of Appeal met on July 24, 2025, and the following decision was reached:
Change occupancy from R-3 to R-2 without a full seismic upgrade: Denied. Proposal does not provide equivalent life safety.
Note: The Building Code Board of Appeal members are supportive of substantial but less than full upgrade, but this proposal does not provide sufficient improvements to the structure. They encourage the appellant to work with the City and Structural Engineering Advisory Committee to find a compromise.
Decision: Unanimous
Board Members: Eric Bressman, Beth Brett, and Sharon Nobbe
According to Oregon Revised Statutes 455.690, you may appeal this decision to the appropriate State of Oregon advisory board within 30 calendar days of this decision being published. For information on the appeals process and costs, including forms, appeal fees, payment methods, and fee waivers, contact the Oregon Department of Consumer and Business Services, Building Codes Division.