Appeal 35055
Appeal Summary
Status: APPROVED WITH CONDITIONS
Appeal ID: 35055
Submission Date: 12/16/25 11:51 AM
Hearing Date: 1/8/26
Case #: 26-02
Appeal Type: Fire
Project Type: commercial
Building/Business Name: University of Oregon - Portland
Appeal Involves: other: Portland Fire Code 311.2.2 Fire Protection
Proposed use: Vacant Premises
Project Address: 6400 NE 29th Ave.
Appellant Name: Anne Karel
LUR or Permit Application #: Other Application of Fire Code Section 311
Stories: 2 Occupancy: N/A Construction Type: Steel/ Concrete
Fire Sprinklers: Yes - Basements Weber + Elizabeth
Plans Examiner/Inspector: David Woodhouse Fire Specialist Eastside Institutions
Plan Submitted Option: pdf [File 1]
Payment Option: electronic
Appeal Information Sheet
Appeal item 1
| Code Section | Portland Fire Code 311.2.2 Fire Protection |
|---|---|
| Requires | Portland Fire Code 311.2.2 Fire Protection. |
| Code Modification or Alternate Requested | Exception # 2. Where approved by the ?re chief, buildings that will not be heated and where ?re protection systems will be exposed to freezing temperatures, ?re alarm and sprinkler systems are permitted to be placed out of service and standpipes are permitted to be maintained as dry systems (without an automatic water supply) provided the building has no contents or storage, and windows doors and other openings are secured to prohibit entry by unauthorized persons. |
| Proposed Design | The buildings are vacant and unheated. The owner has shut off water, power and gas utilities in coordination with abatement prior to demolition. The basements (only) of Elizabeth and Weber residential halls have sprinkler systems. In accordance with Portland Fire Code 311.2.2 Fire Protection the sprinklers have remained charged. David Woodhouse, the Fire Inspector, advised filing this appeal as well as building department appeal of 24.15.60 warehousing to allow shut off and drain of sprinklers during abatement prior to approval of demolition permits (currently under review 25-086423-CO). Abatement includes removal of exterior windows increasing risk of freezing. Exhibit 1 includes abatement documents. A building department appeal of 24.15.60 warehousing is under review in 12/17/25 appeals hearing. |
| Reason for alternative | The utilities to these buildings must be shut off for safety during abatement. The window joint sealants contain hazardous materials and require removal. We would like to drain the ?re suppression system to prevent the hazard of sprinkler system failure during the winter. This building is scheduled to be completely demolished this spring. |
Appeal Decision
01/08/26
Anne Karel
2800 NE Liberty St
RE: 6400 NE 29th Ave
APPEAL ID #35055; Case #26-02
Dear Anne Karel:
The Administrative staff has reviewed your appeal regarding fire protection; the appeal is granted with conditions.
• Obtain a fire sprinkler permit from the Fire Marshal’s Office for removal of fire protection systems.
• Each system in each building will need a separate demo permit.
If you have any questions regarding the appeal outcome or the Board of Appeal process, please call me at 503-347-2637.
Sincerely,
Kari Schimel, Fire Marshal